Overall Equipment Effectiveness

Valutazione media 3,4
( su 5 valutazioni fornite da Goodreads )
 
9780831131388: Overall Equipment Effectiveness

Written primarily for those responsible for the reliability of equipment and the production operation, this innovative book centers on developing and measuring true Overall Equipment Effectiveness (OEE). The author demonstrates that true OEE correlates with factory output, provides a methodology to link OEE with net profits that can be used by reliability managers to build solid business cases for improvement projects, and draws on his own experience by presenting successful improvement applications in every chapter. Additionally, it will also help practitioners better understand Total Productive Maintenance (TPM) and develop an effective foundation to support Reliability-Centered Maintenance (RCM).

  • Develops a minimum set of definitions, a practice application, including three methods of computation, and reconciliation of OEE and various losses.
  • Provides the platform and reasons for maintenance and production to work synergistically.
  • Helps to identify the hidden factory” that exists within the current system in order to begin leveraging its' potential into real bottom line results.
  • Integrates the famous Theory of Constraints” aspects into an easy to understand shutdown strategy example.
  • Contains many practical examples throughout to illustrate techniques and methods in a way everyone can easily understand.

Le informazioni nella sezione "Riassunto" possono far riferimento a edizioni diverse di questo titolo.

About the Author:

Robert C. Hansen, PE and Certified Maintenance Reliability Professional (CMRP), graduated from the University of Wyoming with a B.S. in Civil Engineering. In 1998, he completed a very successful career with Eastman Kodak Company as an Engineering and Maintenance Department Manager in the Colorado division. In his 29 years with Kodak, he held various positions including ESTAR Machine Engineer, and Engineering and Maintenance Department Manager in Base Making, Sensitizing and Finishing departments.

While at Kodak Bob was instrumental in the implementation of key shutdown improvement strategies providing 9 additional production days, and implementing predictive maintenance systems and reliability projects culminating in a 41% reduction in equipment downtime per million linear feet for one of Kodak's largest sensitizing machines. Additionally, he was a member of Kodak's Worldwide Melt/Coat Managers Team for seven years and the Worldwide Health Imaging Finishing Managers Team for more than a year. He served on his plant's reliability team and was responsible for reliability benchmarking.

As a member of the Society of Maintenance Reliability (SMRP), Bob has authored two well-received articles for Maintenance Technology Magazine, "Unleashing the Power of OEE", and "General Tool for Acceptance Testing." As a speaker at the SMRP 1998 conference and at the 1999 MainTech South conference, he presented the OEE article.

Currently he is the Owner and sole proprietor of R.C. Hansen Consulting, LLC. It specializes in identifying and implementing manufacturing productivity improvements for factories seeking to improve Overall Equipment Effectiveness.

Excerpt. © Reprinted by permission. All rights reserved.:

Leadership for Teams

Effective factories usually have coordinated teams that work synergistically with a common purpose. The teams, which are from all areas of the factory, have win-win relationships with their interdependent areas and services.

According to a panel of five reliability consultants at the year 2000 annual conference of the Society of Maintenance Reliability Professionals (SMRP), successful initiatives and programs are primarily driven from the top down rather than from the bottom up. In fact when asked, the panel couldn’t relate a single successful experience with a bot-tom up initiative unless it was first communicated to and accepted by the area leadership.

My own experience supports the concept that successful pro-grams can be implemented at the level of the ‘Champion’ on down. This can be seen where successful programs develop in one work center without ever transferring to other factory areas. When the person who championed the program leaves or transfers, all too often the work center does not sustain the high performance. However, the champions are able to generate new initiatives in other areas once they establish a rapport with the new community.

Management support and area leadership significantly influences the success of initiatives. To sustain a level of excellence, the total community--management, the line organization, and support groups--has to be of one mind. High performance work groups bridge the ‘top down’ syndrome by acceptance of synergistic team leadership.

Nearly everyone comes to work with a desire to do a good job and to be part of a successful unit. Your job and the security of your business depend on strong productivity and top effectiveness. Frustration comes when priorities are not clear and reinforcement is awarded inconsistently. Thus, a single metric--measuring the community as a whole-- can be powerful in bringing everyone together.

Let’s look at an example. I once facilitated a workshop activity aimed at improving the changeover time between orders for a packaging operation. This area had four similar flow-lines working around the clock seven days a week. The area had four shifts with four crews per shift, or a total of sixteen crews. Because each flow-line had two to ten changeovers per day, reducing the changeover time for the work area would greatly improve effectiveness. A workshop for developing quick changeovers using a methodology called Single Minute Exchange of Die(SMED)4 was selected for this task. SMED or quick changeover is cov-ered in section 8.3 of this book.

The operations manager decided to have one crew be the pilot crew that would go through the workshop and develop a best practice methodology. This approach proved to be more complex than expected. The area worked with approximately 130 different products, using 35 different processes. Many crews worked with more of one combination than another. Therefore, a typical changeover really did not exist.

In the workshop, the pilot crew categorized changeovers. They initiated improvements that reduced the majority of their changeover times by 40 percent. At the end of the pilot period they presented the results to the product line superintendent. Although they were proud to receive the superintendent's congratulations, they were shocked when he directed them to teach their methods to the other crews. They had not anticipated this directive, and felt that their reward was more work, beyond the original scope of the workshop. As a pilot crew, they synergistically made improvements, however other crews did not readily accept ‘outside’ ideas and passively committed to new methods. Thus, the improvement methods took much longer to be accepted by the other crews.

What actions would have been better? Proactive leadership would have led to faster results. When the operations manager initiated the request for improvement, he should have confirmed the efforts were supported by the superintendent and then communicated this to all crews. The overall objective should have been outlined with the strategy of how a pilot crew would be selected from volunteers, that this crew would make recommendations for best practices, and that all crews were expected to adapt these methods into their changeovers. If the results of the improvement were visible to the crews, and a system was developed to reward the community when the average changeover improved, then the methods would have been implemented quickly. The superintendent should have invested three or four hours of proactive leadership, earning the support of all the crews. By clearly communicating the desired goal and the expectation that everyone will help implement improved work practices, proactive leadership would provide the community with a com-mon vision. This style of leadership and communication open the way for rapid implementation and sustain improved practices.

Proactive leadership is a vital part of developing work place improvements. It can start at any level of the organization. As objectives are selected, approval should be solicited from the area leadership team to clear the way for rapid success. This book should provide the tools to generate compelling programs for higher effectiveness.

Le informazioni nella sezione "Su questo libro" possono far riferimento a edizioni diverse di questo titolo.

I migliori risultati di ricerca su AbeBooks

1.

Hansen, Robert C
Editore: Industrial Press Inc. (2016)
ISBN 10: 0831131381 ISBN 13: 9780831131388
Nuovi Paperback Quantità: 1
Print on Demand
Da
Ria Christie Collections
(Uxbridge, Regno Unito)
Valutazione libreria
[?]

Descrizione libro Industrial Press Inc., 2016. Paperback. Condizione libro: New. PRINT ON DEMAND Book; New; Publication Year 2016; Not Signed; Fast Shipping from the UK. No. book. Codice libro della libreria ria9780831131388_lsuk

Maggiori informazioni su questa libreria | Fare una domanda alla libreria

Compra nuovo
EUR 38,75
Convertire valuta

Aggiungere al carrello

Spese di spedizione: EUR 4,31
Da: Regno Unito a: U.S.A.
Destinazione, tempi e costi

2.

Robert C. Hansen
Editore: Industrial Press Inc.,U.S., United States (2011)
ISBN 10: 0831131381 ISBN 13: 9780831131388
Nuovi Paperback Quantità: 10
Da
The Book Depository
(London, Regno Unito)
Valutazione libreria
[?]

Descrizione libro Industrial Press Inc.,U.S., United States, 2011. Paperback. Condizione libro: New. Language: English . Brand New Book. Written primarily for those responsible for the reliability of equipment and the production operation, this innovative book centers on developing and measuring true Overall Equipment Effectiveness (OEE). The author demonstrates that true OEE correlates with factory output, provides a methodology to link OEE with net profits that can be used by reliability managers to build solid business cases for improvement projects, and draws on his own experience by presenting successful improvement applications in every chapter. Additionally, it will also help practitioners better understand Total Productive Maintenance (TPM) and develop an effective foundation to support Reliability-Centered Maintenance (RCM). Codice libro della libreria AAJ9780831131388

Maggiori informazioni su questa libreria | Fare una domanda alla libreria

Compra nuovo
EUR 46,84
Convertire valuta

Aggiungere al carrello

Spese di spedizione: GRATIS
Da: Regno Unito a: U.S.A.
Destinazione, tempi e costi

3.

Robert C. Hansen
Editore: Industrial Press Inc.,U.S., United States (2011)
ISBN 10: 0831131381 ISBN 13: 9780831131388
Nuovi Paperback Quantità: 10
Da
The Book Depository US
(London, Regno Unito)
Valutazione libreria
[?]

Descrizione libro Industrial Press Inc.,U.S., United States, 2011. Paperback. Condizione libro: New. Language: English . Brand New Book. Written primarily for those responsible for the reliability of equipment and the production operation, this innovative book centers on developing and measuring true Overall Equipment Effectiveness (OEE). The author demonstrates that true OEE correlates with factory output, provides a methodology to link OEE with net profits that can be used by reliability managers to build solid business cases for improvement projects, and draws on his own experience by presenting successful improvement applications in every chapter. Additionally, it will also help practitioners better understand Total Productive Maintenance (TPM) and develop an effective foundation to support Reliability-Centered Maintenance (RCM). Codice libro della libreria AAJ9780831131388

Maggiori informazioni su questa libreria | Fare una domanda alla libreria

Compra nuovo
EUR 47,12
Convertire valuta

Aggiungere al carrello

Spese di spedizione: GRATIS
Da: Regno Unito a: U.S.A.
Destinazione, tempi e costi

4.

Robert C Hansen
Editore: Industrial Press Inc. 2005-01-01 (2005)
ISBN 10: 0831131381 ISBN 13: 9780831131388
Nuovi Paperback Quantità: 5
Da
Chiron Media
(Wallingford, Regno Unito)
Valutazione libreria
[?]

Descrizione libro Industrial Press Inc. 2005-01-01, 2005. Paperback. Condizione libro: New. Codice libro della libreria NU-MAR-00008125

Maggiori informazioni su questa libreria | Fare una domanda alla libreria

Compra nuovo
EUR 44,55
Convertire valuta

Aggiungere al carrello

Spese di spedizione: EUR 3,33
Da: Regno Unito a: U.S.A.
Destinazione, tempi e costi

5.

Robert C. Hansen
Editore: Industrial Press Inc.,U.S. (2001)
ISBN 10: 0831131381 ISBN 13: 9780831131388
Nuovi Quantità: > 20
Print on Demand
Da
Pbshop
(Wood Dale, IL, U.S.A.)
Valutazione libreria
[?]

Descrizione libro Industrial Press Inc.,U.S., 2001. PAP. Condizione libro: New. New Book.Shipped from US within 10 to 14 business days.THIS BOOK IS PRINTED ON DEMAND. Established seller since 2000. Codice libro della libreria IP-9780831131388

Maggiori informazioni su questa libreria | Fare una domanda alla libreria

Compra nuovo
EUR 47,77
Convertire valuta

Aggiungere al carrello

Spese di spedizione: EUR 3,42
In U.S.A.
Destinazione, tempi e costi

6.

Robert C. Hansen
Editore: Industrial Press Inc.,U.S. (2001)
ISBN 10: 0831131381 ISBN 13: 9780831131388
Nuovi Quantità: 10
Da
Books2Anywhere
(Fairford, GLOS, Regno Unito)
Valutazione libreria
[?]

Descrizione libro Industrial Press Inc.,U.S., 2001. PAP. Condizione libro: New. New Book. Shipped from UK in 4 to 14 days. Established seller since 2000. Codice libro della libreria CD-9780831131388

Maggiori informazioni su questa libreria | Fare una domanda alla libreria

Compra nuovo
EUR 41,38
Convertire valuta

Aggiungere al carrello

Spese di spedizione: EUR 10,03
Da: Regno Unito a: U.S.A.
Destinazione, tempi e costi

7.

Robert C. Hansen
Editore: Industrial Press Inc.,U.S. (2001)
ISBN 10: 0831131381 ISBN 13: 9780831131388
Nuovi Quantità: > 20
Print on Demand
Da
Books2Anywhere
(Fairford, GLOS, Regno Unito)
Valutazione libreria
[?]

Descrizione libro Industrial Press Inc.,U.S., 2001. PAP. Condizione libro: New. New Book. Delivered from our US warehouse in 10 to 14 business days. THIS BOOK IS PRINTED ON DEMAND.Established seller since 2000. Codice libro della libreria IP-9780831131388

Maggiori informazioni su questa libreria | Fare una domanda alla libreria

Compra nuovo
EUR 42,31
Convertire valuta

Aggiungere al carrello

Spese di spedizione: EUR 10,03
Da: Regno Unito a: U.S.A.
Destinazione, tempi e costi

8.

Robert Hansen
ISBN 10: 0831131381 ISBN 13: 9780831131388
Nuovi Quantità: > 20
Da
BWB
(Valley Stream, NY, U.S.A.)
Valutazione libreria
[?]

Descrizione libro Condizione libro: New. Depending on your location, this item may ship from the US or UK. Codice libro della libreria 97808311313880000000

Maggiori informazioni su questa libreria | Fare una domanda alla libreria

Compra nuovo
EUR 53,97
Convertire valuta

Aggiungere al carrello

Spese di spedizione: GRATIS
In U.S.A.
Destinazione, tempi e costi

9.

Robert Hansen
Editore: Industrial Press, Inc.
ISBN 10: 0831131381 ISBN 13: 9780831131388
Nuovi Rilegato Quantità: 20
Da
BuySomeBooks
(Las Vegas, NV, U.S.A.)
Valutazione libreria
[?]

Descrizione libro Industrial Press, Inc. Hardcover. Condizione libro: New. Hardcover. 256 pages. Dimensions: 9.0in. x 5.9in. x 0.8in.Written primarily for those responsible for the reliability of equipment and the production operation, this innovative book centers on developing and measuring true Overall Equipment Effectiveness (OEE). The author demonstrates that true OEE correlates with factory output, provides a methodology to link OEE with net profits that can be used by reliability managers to build solid business cases for improvement projects, and draws on his own experience by presenting successful improvement applications in every chapter. Additionally, it will also help practitioners better understand Total Productive Maintenance (TPM) and develop an effective foundation to support Reliability-Centered Maintenance (RCM). Develops a minimum set of definitions, a practice application, including three methods of computation, and reconciliation of OEE and various losses. Provides the platform and reasons for maintenance and production to work synergistically. Helps to identify the hidden factory that exists within the current system in order to begin leveraging its potential into real bottom line results. Integrates the famous Theory of Constraints aspects into an easy to understand shutdown strategy example. Contains many practical examples throughout to illustrate techniques and methods in a way everyone can easily understand. This item ships from multiple locations. Your book may arrive from Roseburg,OR, La Vergne,TN. Hardcover. Codice libro della libreria 9780831131388

Maggiori informazioni su questa libreria | Fare una domanda alla libreria

Compra nuovo
EUR 51,50
Convertire valuta

Aggiungere al carrello

Spese di spedizione: EUR 3,39
In U.S.A.
Destinazione, tempi e costi

10.

Robert C Hansen
Editore: Industrial Press Inc. (2005)
ISBN 10: 0831131381 ISBN 13: 9780831131388
Nuovi Brossura Prima edizione Quantità: 1
Print on Demand
Da
Valutazione libreria
[?]

Descrizione libro Industrial Press Inc., 2005. Condizione libro: New. This item is printed on demand for shipment within 3 working days. Codice libro della libreria GM9780831131388

Maggiori informazioni su questa libreria | Fare una domanda alla libreria

Compra nuovo
EUR 51,66
Convertire valuta

Aggiungere al carrello

Spese di spedizione: EUR 3,99
Da: Germania a: U.S.A.
Destinazione, tempi e costi

Vedi altre copie di questo libro

Vedi tutti i risultati per questo libro