Tipo di articolo
Condizioni
Legatura
Ulteriori caratteristiche
Paese del venditore
Valutazione venditore
Editore: David Ingram, 2011
ISBN 10: 0950892041ISBN 13: 9780950892047
Da: California Books, Miami, FL, U.S.A.
Libro
Condizione: New.
Editore: David Ingram, 2011
ISBN 10: 0950892041ISBN 13: 9780950892047
Da: PBShop.store US, Wood Dale, IL, U.S.A.
Libro Print on Demand
PAP. Condizione: New. New Book. Shipped from UK. THIS BOOK IS PRINTED ON DEMAND. Established seller since 2000.
Editore: David Ingram, 2011
ISBN 10: 0950892041ISBN 13: 9780950892047
Da: Ria Christie Collections, Uxbridge, Regno Unito
Libro Print on Demand
Condizione: New. PRINT ON DEMAND Book; New; Fast Shipping from the UK. No. book.
Editore: David Ingram, 2011
ISBN 10: 0950892041ISBN 13: 9780950892047
Da: THE SAINT BOOKSTORE, Southport, Regno Unito
Libro Print on Demand
Paperback / softback. Condizione: New. This item is printed on demand. New copy - Usually dispatched within 5-9 working days.
Editore: David Ingram 2011-05, 2011
ISBN 10: 0950892041ISBN 13: 9780950892047
Da: Chiron Media, Wallingford, Regno Unito
Libro
PF. Condizione: New.
Editore: David Ingram, 2011
ISBN 10: 0950892041ISBN 13: 9780950892047
Da: PBShop.store UK, Fairford, GLOS, Regno Unito
Libro Print on Demand
PAP. Condizione: New. New Book. Delivered from our UK warehouse in 4 to 14 business days. THIS BOOK IS PRINTED ON DEMAND. Established seller since 2000.
Editore: David Ingram, 2011
ISBN 10: 0950892041ISBN 13: 9780950892047
Da: Smartbuy, Einbeck, Germania
Libro Print on Demand
Taschenbuch. Condizione: Neu. nach der Bestellung gedruckt Neuware - Printed after ordering - The three EquiMar engineering protocols were designed in conjunction with the International Energy Agency's Implementing Agreement on Ocean Energy Systems (IA-OES) 5 Stage development programme for wave energy converters (WECS). The objective is to complement that overview document by detailing the project planning and technical requirements necessary to safely and successfully advance the design of a WEC with minimum risk and uncertainty. This manual addresses Stages 3 and 4 and introduces guidelines for the testing, monitoring and evaluating of the sea trial of solo devices.The US Department of Energy's (DOE) Technology Readiness Assessment scheme for the development of marine hydrokinetic (MHK) devices also follows a similar format but with 9 Technology Readiness Levels (TRL). 108 pp. Englisch.
Editore: David Ingram, 2011
ISBN 10: 0950892041ISBN 13: 9780950892047
Da: moluna, Greven, Germania
Libro Print on Demand
Condizione: New. Dieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt. KlappentextThe three EquiMar engineering protocols were designed in conjunction with the International Energy Agency s Implementing Agreement on Ocean Energy Systems (IA-OES) 5 Stage development programme for wave energy converters (WECS.