EUR 4,56
Convertire valutaQuantità: 1 disponibili
Aggiungi al carrelloCondizione: Good. 3rd edition. Little wear to boards. Content is clean, gift inscription to first blank. Good DJ with little wear.
Editore: Pitman, 1964
Lingua: Inglese
Da: A Squared Books (Don Dewhirst), South Lyon, MI, U.S.A.
EUR 7,52
Convertire valutaQuantità: 1 disponibili
Aggiungi al carrelloHardcover. Condizione: Very Good. Condizione sovraccoperta: Very Good. Black cloth covered boards with silver spine titles; jacket has mild edge wear, with a few small chips and tears along edges; 8vo - over 7 3/4" to 9 3/4" tall; interior clean and unmarked; 111 pages.
EUR 14,89
Convertire valutaQuantità: 1 disponibili
Aggiungi al carrelloHardcover. Condizione: Good. No Jacket. Missing dust jacket; Pages can have notes/highlighting. Spine may show signs of wear. ~ ThriftBooks: Read More, Spend Less.
EUR 7,86
Convertire valutaQuantità: 1 disponibili
Aggiungi al carrelloCondizione: Good. Ships from the UK. Former library book; may include library markings. Used book that is in clean, average condition without any missing pages.
EUR 7,05
Convertire valutaQuantità: 1 disponibili
Aggiungi al carrelloHardback. Condizione: Used: Acceptable. Hardback with D/J in good condition. Ex library with first page removed. 3rd edition Pitman 1969. - used books, secondhand books, out of print books, hard to find books, for sale, second-hand books, college books, student books, nonfiction, first edition, signed copies, non-fiction books delivered world wide. Excess postage may be required for books over 1 kg in weight outside the EU. ISBN 0-273-40544-6 0273405446.
EUR 4,66
Convertire valutaQuantità: 1 disponibili
Aggiungi al carrelloCondizione: Fair. This is an ex-library book and may have the usual library/used-book markings inside.This book has soft covers. In fair condition, suitable as a study copy. Please note the Image in this listing is a stock photo and may not match the covers of the actual item,400grams, ISBN:0273011774.
EUR 5,39
Convertire valutaQuantità: 1 disponibili
Aggiungi al carrelloCondizione: Poor. This is an ex-library book and may have the usual library/used-book markings inside.This book has soft covers. In poor condition, suitable as a reading copy. Please note the Image in this listing is a stock photo and may not match the covers of the actual item,400grams, ISBN:0273011774.
Editore: Sir Isaac Pitman & Sons, Ltd., 1964
Da: World of Rare Books, Goring-by-Sea, SXW, Regno Unito
Prima edizione
EUR 7,10
Convertire valutaQuantità: 1 disponibili
Aggiungi al carrelloCondizione: Good. 1964. First Edition. 111 pages. Illustrated dust jacket over dark red cloth. Pages and binding are presentable with no major defects. Minor issues present such as mild cracking, inscriptions, inserts, light foxing, tanning and thumb marking. Overall a good condition item. Boards have mild shelf wear with light rubbing and corner bumping. Some light marking and sunning. Unclipped jacket has light edge wear with minor tears and chipping. Mild rubbing and marking.
Da: BOOKBARROW (PBFA member), Cambridge, Regno Unito
Membro dell'associazione: PBFA
EUR 7,10
Convertire valutaQuantità: 1 disponibili
Aggiungi al carrelloBlack Cloth. Condizione: Near Fine. Condizione sovraccoperta: Near Fine. Reprint. illustrated by b/w. diagrams & charts; "this third edition of the pioneer work on Critical Path Analysis is suitable for both student and practitioner. It contains the distillation of wide experience in teaching and using C. P. A. and embraces all the useful manipulations and calculations currently being used. No mathematical expertise is implied or required. Critical Path Analysis (CPA) is a project management tool that sets out all the individual activities that make up a larger project & shows the order in which activities have to be undertaken including which activities can only take place once other activities have been completed & which activities can be undertaken simultaneously, thereby reducing the overall time taken to complete the whole project."; including index - 219 pages. Size: 8vo - over 7¾" - 9¾" tall. Quantity Available: 1. Category: Science & Technology; C. P. A.; Project Planning; Engineering, Industrial, Trade. ISBN: 0273405446. ISBN/EAN: 9780273405443. Inventory No: SCE00042.
EUR 8,63
Convertire valutaQuantità: 1 disponibili
Aggiungi al carrelloCondizione: Good. This is an ex-library book and may have the usual library/used-book markings inside.This book has hardback covers. In good all round condition. Dust jacket in fair condition. Please note the Image in this listing is a stock photo and may not match the covers of the actual item,450grams, ISBN:0273405446.
Editore: Sir Isaac Pitman and Sons Ltd, 1964
Da: BoundlessBookstore, Wallingford, Regno Unito
EUR 2,37
Convertire valutaQuantità: 1 disponibili
Aggiungi al carrelloCondizione: Good. DJ may have small chips and tears. Book will have been read but remains clean. Cover may have light wear or slight soiling. Pages may be slightly tanned. May contain inscriptions.
Editore: Sir Isaac Pitman and Sons Ltd, 1965
Da: BoundlessBookstore, Wallingford, Regno Unito
EUR 2,97
Convertire valutaQuantità: 1 disponibili
Aggiungi al carrelloCondizione: Good. DJ may have small chips and tears. Book will have been read but remains clean. Cover may have light wear or slight soiling. Pages may be slightly tanned. May contain inscriptions but text pages will be free from markings.
EUR 8,31
Convertire valutaQuantità: 1 disponibili
Aggiungi al carrelloCondizione: As New. 1964. Reprint. Hardcover. Clean copy. . . . . Books ship from the US and Ireland.
Editore: Pitman Publishing, 1965
Da: World of Rare Books, Goring-by-Sea, SXW, Regno Unito
EUR 11,84
Convertire valutaQuantità: 1 disponibili
Aggiungi al carrelloCondizione: Good. 1965. 111 pages. No dust jacket. Black cloth. Pages are lightly tanned and thumbed at the edges, with light foxing. Binding has remained firm. Boards are a little rub worn, slight shelf wear to corners, spine and edges. Corners are a little bumped. Spine ends are mildly crushed. Light tanning to spine and edges. Boards are bowed. Book has a forward lean.
Editore: Pitman NULL
Da: Anybook.com, Lincoln, Regno Unito
EUR 2,97
Convertire valutaQuantità: 1 disponibili
Aggiungi al carrelloCondizione: Fair. This book has hardback covers. Ex-library, With usual stamps and markings, In fair condition, suitable as a study copy. Dust Jacket in fair condition. Please note the Image in this listing is a stock photo and may not match the covers of the actual item,400grams, ISBN:
Editore: PITMAN, 1964
Da: Kennys Bookshop and Art Galleries Ltd., Galway, GY, Irlanda
EUR 8,55
Convertire valutaQuantità: 1 disponibili
Aggiungi al carrelloCondizione: As New. 1964. Reprint. Hardcover. Clean copy. . . . .
Editore: Sir Isaac Pitman & Sons, 1965
Da: Anybook.com, Lincoln, Regno Unito
EUR 4,55
Convertire valutaQuantità: 1 disponibili
Aggiungi al carrelloCondizione: Good. This is an ex-library book and may have the usual library/used-book markings inside.This book has hardback covers. Clean from markings. In good all round condition. No dust jacket. Please note the Image in this listing is a stock photo and may not match the covers of the actual item,350grams, ISBN:
Editore: Pitman, London, 1969
Lingua: Inglese
Da: Marion Pitman Books, Reading, Regno Unito
EUR 17,76
Convertire valutaQuantità: 1 disponibili
Aggiungi al carrelloHardcover. Condizione: Very Good. Condizione sovraccoperta: Good. Third Edition. D/w bit worn & frayed on edges, sm. tear in back.
Editore: London: Pitman, 1969
Da: Plurabelle Books Ltd, Cambridge, Regno Unito
Membro dell'associazione: GIAQ
EUR 14,21
Convertire valutaQuantità: 1 disponibili
Aggiungi al carrelloHardcover. Condizione: Very Good. 219p hardback with purple jacket, nice clean copy Language: English.
Editore: Sir Isaac Pitman & Sons Ltd, London, 1969
ISBN 10: 0273405446 ISBN 13: 9780273405443
Lingua: Inglese
Da: J J Basset Books, bassettbooks, bookfarm.co.uk, Peter Tavy, Regno Unito
EUR 14,21
Convertire valutaQuantità: 1 disponibili
Aggiungi al carrelloBlack Cloth. Condizione: Very Good. No Jacket. Diagrams (illustratore). Third Edition. Please Email for further details. Size: 8vo - over 7¾" - 9¾". Signed By a "J.A Sherman".
Editore: Pitman
Da: Goldstone Rare Books, Carmarthen, CARMS, Regno Unito
EUR 9,46
Convertire valutaQuantità: 1 disponibili
Aggiungi al carrelloHardback. Condizione: Good. Hardback. With dust jacket. Photograph available on request.
Editore: PITMAN, 1964
Lingua: Inglese
Da: NEPO UG, Rüsselsheim am Main, Germania
EUR 14,18
Convertire valutaQuantità: 1 disponibili
Aggiungi al carrelloGebundene Ausgabe. Condizione: Gut. 111 Seiten Versand sofort weltweit. Rechnung mit ausgewiesener MwSt. Bibliotheksexemplar. Worldwide shipping with invoice. Ex library Sprache: Englisch Gewicht in Gramm: 550.
Editore: Pitman, London, 1969
Da: Laura Books, Georgetown, SA, Australia
EUR 12,63
Convertire valutaQuantità: 1 disponibili
Aggiungi al carrelloHard Cover. Condizione: Very Good. Condizione sovraccoperta: Good. 3rd Edition. owners name front endpaper, otherwise book clean and tight. DJ: some wear Size: 8vo - over 7¾" - 9¾" tall.
Editore: Pitman, 1967
Da: BookDepart, Shepherdstown, WV, U.S.A.
EUR 30,24
Convertire valutaQuantità: 1 disponibili
Aggiungi al carrelloHardcover. Condizione: UsedGood. Hardcover, 2nd edition; surplus library copy with the usual stampings; reference number taped to dust jacket spine; light shelf wear, light fading to exterior; a few coffee-colored marks at bottom outside page edge; otherwise in good condition with clean text, firm binding. Dust jacket, light fading, light shelf wear; wrapped in protective Mylar sleeve.
Editore: Sir Isaac Pitman & Sons, London England, 1965
Da: The London Bookworm, East Sussex, Regno Unito
EUR 11,93
Convertire valutaQuantità: 1 disponibili
Aggiungi al carrelloCloth. Condizione: Very Good. No Jacket. Reprinted With Minor Amendments. Hardcover. An Introduction to Vritical Path Analysis. Previous owners name to inside cover. Slightly sunned top edge of cloth. Black cloth with silver lettering. Contents: Preface. Introductory. The Elements of a Network. Drawing the Network. Analysing the Network: Isolating the Critical Path. Analysing the Network: Float or Slack. Reducing the Project Time. The Arrow Diagram and the Gantt Chart. Loading. Control and Critical Path Analysis. Uncertainty. Slected Reading. Index. Illustrations. 111 pp. (We carry a wide selection of titles in The Arts, Theology, History, Politics, Social and Physical Sciences. academic and scholarly books and Modern First Editions, Reference books ,and all types of Academic Literature.).
Editore: Sir Isaac Pitman & Sons Ltd, London, 1967
Da: Pulp Fiction Murwillumbah, Murwillumbah, NSW, Australia
EUR 28,70
Convertire valutaQuantità: 1 disponibili
Aggiungi al carrelloHardcover. Condizione: Very Good. Condizione sovraccoperta: Fair. 2nd. Dust jacket is chipped and clipped, there is some foxing to the endpapers, and a small inscription. 402.
Editore: Sir Isaac Pitman And Sons Ltd
Da: Goldstone Rare Books, Carmarthen, CARMS, Regno Unito
EUR 30,05
Convertire valutaQuantità: 1 disponibili
Aggiungi al carrellohardcover. Condizione: Good. Hardback. With dust jacket. Photograph available on request.
Editore: Pitman Publishing, New York, 1967
Da: Rare Book Cellar, Pomona, NY, U.S.A.
EUR 44,29
Convertire valutaQuantità: 1 disponibili
Aggiungi al carrelloHardcover. Second Edition. Near Fine in a Very Good+ dust jacket.