ISBN 10: 1848210345 / ISBN 13: 9781848210349
Usato / Quantità: 0
Copie del libro da altre librerie
Mostra tutte le  copie di questo libro

Libro

Purtroppo questa copia non è più disponibile. Di seguito ti proponiamo una lista di copie simili.

Descrizione:

This Book is in Good Condition. Clean Copy With Light Amount of Wear. 100% Guaranteed. Summary: Part 1: The resource-constrained project scheduling problem. Chapter 1. The resource-constrained project scheduling problem (Christian Artigues, Sophie Demassey and Emmanuel Neron). Chapter 2. Standard scheduling subproblems (Christian Artigues, Sophie Demassey and Emmanuel Neron). Chapter 3. Integer linear programming formulations and relaxations (Christian Artigues, Sophie Demassey and Emmanuel Neron). Chapter 4. Constraint programming formulations and filtering algorithms (Philippe Laborie and Wim Nuijten). Chapter 5. Lower bounds (Christian Artigues, Sophie Demassey and Emmanuel Neron). Chapter 6. Exact methods (Christian Artigues, Sophie Demassey and Emmanuel Neron). Chapter 7. Heuristics (Christian Artigues and David Rivreau). Chapter 8. Computational experiments (Christian Artigues, Sophie Demassey, Philippe Laborie, Emmanuel Neron and David Rivreau). Part 2: Variants and extensions. Chapter 9. Preemptive activities (Jean Damay). Chapter 10. Multi-mode activities and multiskill resources (Odile Bellenguez and Emmauel Neron). Chapter 11. Project scheduling with production and consumption of resources (Jacques Carlier, Aziz Moukrim and Huang Xu). Chapter 12. Maximal time lags (Christian Artigues and Cyril Briand). Chapter 13. Reactive project scheduling (Narendra Jussien and Christelle Gueret). Chapter 14. Proactive-reactive project scheduling (Erik Demeulemeester, Willy Herroelen and Roel Leus). Chapter 15. Cost-based RCPSP (Laure-Emmanuelle-Drezet). Part 3: Industrial applications. Chapter 16. Assembly shop scheduling (Michel Gourgand, Nathalie Grangeon and Sylvie Norre). Chapter 17. Employee scheduling in an IT company (Laure-Emmanuelle Drezet and Jean-Charles Billaut). Chapter 18. Rolling ingots production scheduling (Christoph Schwindt and Norbert Trautmann). Chapter 19. VLIW instruction scheduling (Christian Artigues, Sadia Azem and Benoit Dupont de Dinechin). Codice inventario libreria

Su questo libro:

Book ratings provided by GoodReads):
4 valutazione media
(1 valutazioni)

Riassunto: This title presents a large variety of models and algorithms dedicated to the resource-constrained project scheduling problem (RCPSP), which aims at scheduling at minimal duration a set of activities subject to precedence constraints and limited resource availabilities.
In the first part, the standard variant of RCPSP is presented and analyzed as a combinatorial optimization problem. Constraint programming and integer linear programming formulations are given. Relaxations based on these formulations and also on related scheduling problems are presented. Exact methods and heuristics are surveyed. Computational experiments, aiming at providing an empirical insight on the difficulty of the problem, are provided.
The second part of the book focuses on several other variants of the RCPSP and on their solution methods. Each variant takes account of real-life characteristics which are not considered in the standard version, such as possible interruptions of activities, production and consumption of resources, cost-based approaches and uncertainty considerations.
The last part presents industrial case studies where the RCPSP plays a central part. Applications are presented in various domains such as assembly shop and rolling ingots production scheduling, project management in information technology companies and instruction scheduling for VLIW processor architectures.

L'autore: Christian Artigues is a researcher at the Laboratory for Analysis and
Architecture of Systems (LAAS) of the French National Institute for
Scientific Research (CNRS).

Sophie Demassey is an Assistant Professor at the School of Mining Engineering (EMN), Nantes, France.

Emmanuel Néron is Assistant Professor at the Computer Science Department of Polytech'Tours, France, and is a member of the Computer Science Laboratory of the University of Tours, France.

Le informazioni nella sezione "Su questo libro" possono far riferimento a edizioni diverse di questo titolo.

Dati bibliografici

Condizione libro: Used

I migliori risultati di ricerca su AbeBooks

1.

Christian Artigues (Editor), Sophie Demassey (Editor), Emmanuel Néron (Editor)
Editore: Wiley-Blackwell, Book
ISBN 10: 1848210345 ISBN 13: 9781848210349
Nuovi Rilegato Quantità: 1
Da
New Book Sale
(London, Regno Unito)
Valutazione libreria
[?]

Descrizione libro Wiley-Blackwell, Book. Hardcover. Condizione libro: New. In Stock , Brand New , Usually Dispatched within 1-2 Business Days , Safe Packing : Shrink Wrap + Bubble Wrap for more safety , Shipping Service : Priority ( Expedite ) Shipping : Ships By Courier Company Like DHL , TNT , FedEx , . Free Tracking Number for Priority ( Expedite ) Shipping Service , Please Note : Courier Company does not generally deliver to PO Boxes or APO addresses , Standard Shipping Services : Ships By airmail , Excellent Customer Services , Customer Satisfaction Guaranteed , Ships from UK Warehouse or Maybe from Our Overseas Warehouse ( UAE Warehouse or Iran Warehouse ) , without any changes in Shipping Rates. Codice libro della libreria 1848210345(1F1419)

Maggiori informazioni su questa libreria | Fare una domanda alla libreria

Compra nuovo
EUR 77,21
Convertire valuta

Aggiungere al carrello

Spese di spedizione: EUR 11,55
Da: Regno Unito a: Italia
Destinazione, tempi e costi

2.

Christian Artigues
Editore: ISTE Ltd. (2008)
ISBN 10: 1848210345 ISBN 13: 9781848210349
Nuovi Quantità: 1
Da
Books2Anywhere
(Fairford, GLOS, Regno Unito)
Valutazione libreria
[?]

Descrizione libro ISTE Ltd., 2008. HRD. Condizione libro: New. New Book. Shipped from UK in 4 to 14 days. Established seller since 2000. Codice libro della libreria FW-9781848210349

Maggiori informazioni su questa libreria | Fare una domanda alla libreria

Compra nuovo
EUR 126,98
Convertire valuta

Aggiungere al carrello

Spese di spedizione: EUR 11,55
Da: Regno Unito a: Italia
Destinazione, tempi e costi

3.

Editore: ISTE Ltd and John Wiley Sons Inc, United Kingdom (2008)
ISBN 10: 1848210345 ISBN 13: 9781848210349
Nuovi Rilegato Quantità: 1
Da
The Book Depository
(London, Regno Unito)
Valutazione libreria
[?]

Descrizione libro ISTE Ltd and John Wiley Sons Inc, United Kingdom, 2008. Hardback. Condizione libro: New. 232 x 160 mm. Language: English . Brand New Book. This title presents a large variety of models and algorithms dedicated to the resource-constrained project scheduling problem (RCPSP), which aims at scheduling at minimal duration a set of activities subject to precedence constraints and limited resource availabilities. In the first part, the standard variant of RCPSP is presented and analyzed as a combinatorial optimization problem. Constraint programming and integer linear programming formulations are given. Relaxations based on these formulations and also on related scheduling problems are presented. Exact methods and heuristics are surveyed. Computational experiments, aiming at providing an empirical insight on the difficulty of the problem, are provided. The second part of the book focuses on several other variants of the RCPSP and on their solution methods. Each variant takes account of real-life characteristics which are not considered in the standard version, such as possible interruptions of activities, production and consumption of resources, cost-based approaches and uncertainty considerations. The last part presents industrial case studies where the RCPSP plays a central part. Applications are presented in various domains such as assembly shop and rolling ingots production scheduling, project management in information technology companies and instruction scheduling for VLIW processor architectures. Codice libro della libreria AAH9781848210349

Maggiori informazioni su questa libreria | Fare una domanda alla libreria

Compra nuovo
EUR 134,62
Convertire valuta

Aggiungere al carrello

Spese di spedizione: GRATIS
Da: Regno Unito a: Italia
Destinazione, tempi e costi

4.

Editore: ISTE Ltd and John Wiley Sons Inc, United Kingdom (2008)
ISBN 10: 1848210345 ISBN 13: 9781848210349
Nuovi Rilegato Quantità: 1
Da
The Book Depository US
(London, Regno Unito)
Valutazione libreria
[?]

Descrizione libro ISTE Ltd and John Wiley Sons Inc, United Kingdom, 2008. Hardback. Condizione libro: New. 232 x 160 mm. Language: English . Brand New Book. This title presents a large variety of models and algorithms dedicated to the resource-constrained project scheduling problem (RCPSP), which aims at scheduling at minimal duration a set of activities subject to precedence constraints and limited resource availabilities. In the first part, the standard variant of RCPSP is presented and analyzed as a combinatorial optimization problem. Constraint programming and integer linear programming formulations are given. Relaxations based on these formulations and also on related scheduling problems are presented. Exact methods and heuristics are surveyed. Computational experiments, aiming at providing an empirical insight on the difficulty of the problem, are provided. The second part of the book focuses on several other variants of the RCPSP and on their solution methods. Each variant takes account of real-life characteristics which are not considered in the standard version, such as possible interruptions of activities, production and consumption of resources, cost-based approaches and uncertainty considerations. The last part presents industrial case studies where the RCPSP plays a central part. Applications are presented in various domains such as assembly shop and rolling ingots production scheduling, project management in information technology companies and instruction scheduling for VLIW processor architectures. Codice libro della libreria AAH9781848210349

Maggiori informazioni su questa libreria | Fare una domanda alla libreria

Compra nuovo
EUR 135,01
Convertire valuta

Aggiungere al carrello

Spese di spedizione: GRATIS
Da: Regno Unito a: Italia
Destinazione, tempi e costi

5.

Editor: Christian Artigues (French National Institute for Scientific Research (CNRS)); Editor: Sophie Demassey (School of Mining Engineering (EMN), Nantes, France); Editor: Emmanuel Néron (Computer Science Department of Polytech'Tours, France)
Editore: John Wiley and Sons
ISBN 10: 1848210345 ISBN 13: 9781848210349
Nuovi Quantità: > 20
Da
INDOO
(Avenel, NJ, U.S.A.)
Valutazione libreria
[?]

Descrizione libro John Wiley and Sons. Condizione libro: New. Brand New. Codice libro della libreria 1848210345

Maggiori informazioni su questa libreria | Fare una domanda alla libreria

Compra nuovo
EUR 131,97
Convertire valuta

Aggiungere al carrello

Spese di spedizione: EUR 16,67
Da: U.S.A. a: Italia
Destinazione, tempi e costi

6.

Christian Artigues (Editor), Sophie Demassey (Editor), Emmanuel N?ron (Editor)
Editore: Wiley-ISTE (2008)
ISBN 10: 1848210345 ISBN 13: 9781848210349
Nuovi Rilegato Quantità: 1
Da
Ergodebooks
(RICHMOND, TX, U.S.A.)
Valutazione libreria
[?]

Descrizione libro Wiley-ISTE, 2008. Hardcover. Condizione libro: New. 1. Codice libro della libreria DADAX1848210345

Maggiori informazioni su questa libreria | Fare una domanda alla libreria

Compra nuovo
EUR 168,25
Convertire valuta

Aggiungere al carrello

Spese di spedizione: EUR 12,96
Da: U.S.A. a: Italia
Destinazione, tempi e costi

7.

Christian Artigues
ISBN 10: 1848210345 ISBN 13: 9781848210349
Nuovi Rilegato Prima edizione Quantità: 1
Da
AussieBookSeller
(SILVERWATER, NSW, Australia)
Valutazione libreria
[?]

Descrizione libro 2008. Hardcover. Condizione libro: New. 1st. 162mm x 23mm x 235mm. Hardcover. Presenting  a large variety of models and algorithms dedicated to the resource-constrained project scheduling problem (RCPSP), which aims  to schedule&nb.Shipping may be from our Sydney, NSW warehouse or from our UK or US warehouse, depending on stock availability. 308 pages. 0.603. Codice libro della libreria 9781848210349

Maggiori informazioni su questa libreria | Fare una domanda alla libreria

Compra nuovo
EUR 179,20
Convertire valuta

Aggiungere al carrello

Spese di spedizione: EUR 25,93
Da: Australia a: Italia
Destinazione, tempi e costi

8.

Christian Artigues
Editore: Wiley-ISTE (2008)
ISBN 10: 1848210345 ISBN 13: 9781848210349
Nuovi Rilegato Quantità: 1
Da
Irish Booksellers
(Rumford, ME, U.S.A.)
Valutazione libreria
[?]

Descrizione libro Wiley-ISTE, 2008. Hardcover. Condizione libro: New. book. Codice libro della libreria 1848210345

Maggiori informazioni su questa libreria | Fare una domanda alla libreria

Compra nuovo
EUR 195,44
Convertire valuta

Aggiungere al carrello

Spese di spedizione: EUR 11,11
Da: U.S.A. a: Italia
Destinazione, tempi e costi

9.

Artigues, Christian/ Demassey, Sophie/ Neron, Emmanuel
Editore: Iste/Hermes Science Pub (2008)
ISBN 10: 1848210345 ISBN 13: 9781848210349
Nuovi Rilegato Quantità: 1
Da
Revaluation Books
(Exeter, Regno Unito)
Valutazione libreria
[?]

Descrizione libro Iste/Hermes Science Pub, 2008. Hardcover. Condizione libro: Brand New. 1st edition. 308 pages. 9.25x6.25x0.75 inches. In Stock. Codice libro della libreria __1848210345

Maggiori informazioni su questa libreria | Fare una domanda alla libreria

Compra nuovo
EUR 210,62
Convertire valuta

Aggiungere al carrello

Spese di spedizione: EUR 17,33
Da: Regno Unito a: Italia
Destinazione, tempi e costi

10.

Christian Artigues
Editore: Wiley-Blackwell (2008)
ISBN 10: 1848210345 ISBN 13: 9781848210349
Nuovi Rilegato Quantità: 1
Da
Media Mall
(Fyshwick, ACT, Australia)
Valutazione libreria
[?]

Descrizione libro Wiley-Blackwell, 2008. Hardcover. Condizione libro: New. 16.4 x 23.8 cm. Our orders are sent from our warehouse locally or directly from our international distributors to allow us to offer you the best possible price and delivery time. Book. Codice libro della libreria MM-60408502

Maggiori informazioni su questa libreria | Fare una domanda alla libreria

Compra nuovo
EUR 217,65
Convertire valuta

Aggiungere al carrello

Spese di spedizione: EUR 16,58
Da: Australia a: Italia
Destinazione, tempi e costi

Vedi altre 2 copie di questo libro

Vedi tutti i risultati per questo libro