Book by Antill James M Woodhead Ronald W
Le informazioni nella sezione "Riassunto" possono far riferimento a edizioni diverse di questo titolo.
EUR 3,22 per la spedizione in U.S.A.
Destinazione, tempi e costiDa: HPB-Red, Dallas, TX, U.S.A.
paperback. Condizione: Acceptable. Connecting readers with great books since 1972. Used textbooks may not include companion materials such as access codes, etc. May have condition issues including wear and notes/highlighting. We ship orders daily and Customer Service is our top priority! Codice articolo S_441286446
Quantità: 1 disponibili
Da: clickgoodwillbooks, Indianapolis, IN, U.S.A.
Condizione: acceptable. Used - Acceptable: All pages and the cover are intact, but shrink wrap, dust covers, or boxed set case may be missing. Pages may include limited notes, highlighting, or minor water damage but the text is readable. Item may be missing bundled media. Codice articolo 3O6ZVA0000JZ_ns
Quantità: 1 disponibili
Da: Bingo Books 2, Vancouver, WA, U.S.A.
Hardcover. Condizione: Very Good. 2nd Edition. second edition hardback book in very good condition,name at top of first blank page. Codice articolo 121576
Quantità: 1 disponibili
Da: Bingo Used Books, Vancouver, WA, U.S.A.
Hardcover. Condizione: Very Good. Condizione sovraccoperta: Very Good. 2nd Edition. hardback in very good+ condition with very good- dust jacket. 2nd edition. Codice articolo 118018
Quantità: 1 disponibili
Da: BookDepart, Shepherdstown, WV, U.S.A.
Hardcover. Condizione: UsedGood. Hardcover, second edition; surplus library copy with the usual stampings; reference number taped to spine; fading and edge wear to exterior; otherwise in good condition with clean text, firm binding. Codice articolo 53737
Quantità: 1 disponibili
Da: Mr Pickwick's Fine Old Books, Katoomba, NSW, Australia
Hardcover (Original Cloth). Condizione: Very Good. Condizione sovraccoperta: No Dust Jacket. Second Edition. One of a collection of 150 specialist Trade books, including carpentry, wood turning, wooden boat building,stonemasonry, blacksmithing, tile making and the like. All are available for sale at this site. Use the special keyword pickwicktrade to compile an on-screen list of all these still available. Size: Octavo (standard book size). 414 pages. Text body is clean, and free from previous owner annotation, underlining and highlighting. Binding is tight, covers and spine fully intact. No foxing in this copy. Edges browned slightly. Quantity Available: 1. Shipped Weight: Under 1 kilogram. Category: Engineering, Industrial, Trade; ISBN: 0471032468. ISBN/EAN: 9780471032465. All our pictures shown here are of the actual item, not stock photos. Inventory No: 32060: Main Trade For further info on this title, click on the "Contact Seller" button within this listing. We will try to reply within 24 hours. Otherwise you can order right now (inclusive of shipping options) from the "Add to Basket" button to the right. Codice articolo 32060
Quantità: 1 disponibili