The casual users Survival Guide ! Written for people who understand the basics and want a brief text to demonstrate some of the less intuitive functions. Quickly gets down to the issues that many people grapple with when trying to use some of the more advanced features of the software and enlightens readers on the traps that some users fall into and how to avoid them. Demonstrates how the software ticks and explains some tricks that may be used to become more productive with the software and generate better schedules.
Le informazioni nella sezione "Riassunto" possono far riferimento a edizioni diverse di questo titolo.
1 IMPORTANT THINGS
1.1 The "Delete" Key
1.2 Typing a Date or Dragging a Task Sets a
Constraint!
1.3 Indicators Column
1.4 Why Are Tasks Scheduled before the
Predecessors?
1.4.1 Actual Start Date
1.4.2 Tasks Will Always Honor Their Constraint Dates
1.5 The Logic Keeps Changing!
1.6 Why Do New Tasks Have an Early Start
Constraint?
1.7 Recommended Schedule Options
2 CALENDAR SURVIVAL GUIDE
2.1 Role of the Project Calendar
2.2 Guidelines for Creating Calendars
2.3 Display of Duration in Days
2.4 How to Assign Task Calendars
2.5 Other Things Task Calendars Affect
2.5.1 Float
2.5.2 Lags
2.6 Resource Calendars
2.7 Which Calendar is the Task Using?
2.8 Default Start and End Time
2.9 Finish Variance Calculation
3 TRICKY STUFF
3.1 Task Splitting
3.1.1 What is Splitting?
3.1.2 Splitting a Task Manually
3.1.3 Splitting In-progress Tasks
3.1.4 Hiding a Bar Split
3.1.5 Removing a Bar Split
3.2 Deadline Date
3.3 Negative and Free Float Bars
3.4 As Late As Possible Constraint
4 INTERESTING FEATURES
4.1 Wildcard Filters for Text Searching
4.2 Interactive Filters
4.3 Selecting Dates
4.4 Understanding Start and Finish Milestones
4.5 Converting a Finish Milestone into a Start
Milestone
4.6 Elapsed Durations, Leads and Lags
4.6.1 Elapsed Durations
4.6.2 Float on Tasks with Elapsed Durations
4.6.3 Elapsed Leads and Lags
4.7 Establishing Two Relationships between Two
Tasks
4.8 % Lags
4.9 Task Drivers
4.1 Tracing the Logic of a Schedule
4.11 Creating a Hammock or LEO Task
5 MAKING IT LOOK RIGHT
5.1 Date Format Dangers
5.2 Preventing the Date Format from Changing on
Other Computers
5.3 The Smart Way to Create Views
5.4 Bar Formatting
5.4.1 Bar Date Format
5.4.2 Bar Heights
5.4.3 Always Roll Up Gantt Bars
5.4.4 Round Bars to Whole Days
5.4.5 Bar Text
5.5 Format Colors
5.6 Displaying an S-Curve
5.7 Displaying Cumulative Histogram
5.8 Displaying a Project Summary Task
5.9 Display Tasks without Successors as Critical
5.1 Preventing Descriptions from Indenting
5.11 Reducing Column Widths
5.12 How to Display a Task ID that Will Not Change
5.13 Hiding Task Information
5.13.1 Hiding Bars
5.13.2 Hiding Text
5.14 Anchor a Vertical Line to a Milestone
6 GETTING IT OUT - PRINTING
6.1 Printing to One Page Wide
6.2 Printing a Date Range
6.3 Printing a Gantt Chart and Resource Graph or
Usage Table on One Page
6.4 Printing the Calendar
6.5 Hiding Some of the Bars in the Legend
7 RESOURCE BASICS
7.1 How Many Resources Should I Have?
7.2 The Balance Between the Number of Activities
and Resources
7.3 Durations and Assignments Change as
Resources are Assigned
7.3.1 Task Type - Fixed Duration, Fixed Units, Fixed
Work
7.3.2 Effort-Driven or Non Effort-driven?
7.3.3 Task Type and Effort-Driven Options
7.4 Assigning Resources to Tasks
7.5 Resources and Summary Tasks
8 UPDATING ESSENTIALS
8.1 Baselines and Updating a Project
8.2 Which Baseline Should Be Used?
8.3 In-progress Task Finish Date Calculation
8.4 Current Date and Status Date
8.5 Auto Statusing Using Update Project
8.6 Moving Incomplete Work into the Future by
Splitting
8.7 Tracking Toolbar
8.8 Why Do Calculation Options - Move end of
completed parts…Not Work?
8.9 Comparing Progress with Baseline
8.1 Progress Lines
8.11 Simple Procedure for Statusing a Schedule -
Using Auto Status
8.12 Procedure for Detailed Statusing
8.13 Preparing to Update with Resources
8.14 Updating Resources
9 OTHER THINGS OF INTEREST
9.1 Standardizing Projects
9.2 Global.mpt
9.3 Templates
9.4 Copying Views, Tables and Filters
9.5 Right-Clicking with the Mouse
9.6 Always Displaying Full Menus
9.7 Dynamically Linking Cells
9.8 How Does Negative Float Calculate for Summary
Activities?
9.9 Float and Constraints
9.1 Using Custom Fields
9.11 Custom Columns Formulas and Drop-Down List
9.12 Custom Outline Codes
9.12.1 Define a Custom Outline Code Structure
9.12.2 Assigning the Custom Codes
9.12.3 Grouping with Custom Data
9.13 Exporting to Excel
9.14 Turning Off Getting Started and Project Guide
9.15 Do I Have All the Scope?
9.15.1 Stakeholder Analysis
9.15.2 Risk Analysis
9.16 Preparing for Dispute Resolution
9.16.1 Keeping Electronic Copies of Each Update
9.16.2 Clearly Record the Effect of Each Change
Book by Paul E Harris
Le informazioni nella sezione "Su questo libro" possono far riferimento a edizioni diverse di questo titolo.
EUR 6,45 per la spedizione da Regno Unito a U.S.A.
Destinazione, tempi e costiEUR 28,81 per la spedizione da Regno Unito a U.S.A.
Destinazione, tempi e costiDa: WorldofBooks, Goring-By-Sea, WS, Regno Unito
Paperback. Condizione: Very Good. The book has been read, but is in excellent condition. Pages are intact and not marred by notes or highlighting. The spine remains undamaged. Codice articolo GOR006192249
Quantità: 1 disponibili
Da: Reuseabook, Gloucester, GLOS, Regno Unito
Perfect Paperback. Condizione: Used; Good. Dispatched, from the UK, within 48 hours of ordering. This book is in good condition but will show signs of previous ownership. Please expect some creasing to the spine and/or minor damage to the cover. Codice articolo CHL2634598
Quantità: 1 disponibili
Da: Revaluation Books, Exeter, Regno Unito
Perfect Paperback. Condizione: Brand New. 108 pages. 7.70x5.10x0.40 inches. In Stock. Codice articolo 1921059192
Quantità: 1 disponibili