Project planning, scheduling, and control are regularly used in business and the service sector of an economy to accomplish outcomes with limited resources under critical time constraints. To aid in solving these problems, network-based planning methods have been developed that now exist in a wide variety of forms, cf. Elmaghraby (1977) and Moder et al. (1983). The so-called "classical" project networks, which are used in the network techniques CPM and PERT and which represent acyclic weighted directed graphs, are able to describe only projects whose evolution in time is uniquely specified in advance. Here every event of the project is realized exactly once during a single project execution and it is not possible to return to activities previously carried out (that is, no feedback is permitted). Many practical projects, however, do not meet those conditions. Consider, for example, a production process where some parts produced by a machine may be poorly manufactured. If an inspection shows that a part does not conform to certain specifications, it must be repaired or replaced by a new item. This means that we have to return to a preceding stage of the production process. In other words, there is feedback. Note that the result of the inspection is that a certain percentage of the parts tested do not conform. That is, there is a positive probability (strictly less than 1) that any part is defective.
Le informazioni nella sezione "Riassunto" possono far riferimento a edizioni diverse di questo titolo.
1 Basic Concepts.- 1.1 Directed Graphs and Project Networks.- 1.2 GERT Networks.- 1.3 Assumptions and Structural Problems.- 1.4 Complete and GERT Subnetworks.- 2 Temporal Analysis of GERT Networks.- 2.1 Activation Functions and Activation Distributions.- 2.2 Evaluation of Admissible GERT Networks.- 2.3 Computation of Some Quantities Important to Time Planning.- 2.4 Evaluation Methods for Admissible GERT Networks.- 3 STEOR Networks and EOR Networks.- 3.1 Markov Chains and Markov Renewal Processes.- 3.2 STEOR Networks and Markov Renewal Processes.- 3.3 Basic Properties of Admissible EOR Networks.- 3.4 Coverings of Admissible EOR Networks.- 3.5 Properties and Computation of Activation Functions and Activation Numbers.- 3.6 The MRP Method.- 4 Reducible GERT Networks.- 4.1 STEOR—Reducible Subnetworks.- 4.2 Cycle Reduction.- 4.3 Nodes Which Belong Together.- 4.4 Basic Element Structures.- 4.5 BES Networks.- 4.6 Evaluation Methods for BES Networks and General Admissible GERT Networks.- 5 Scheduling with GERT Precedence Constraints.- 5.1 Deterministic Single—Machine Scheduling.- 5.2 Stochastic Single—Machine Scheduling with GERT Precedence Constraints: Basic Concepts.- 5.3 Stochastic Single—Machine Scheduling with GERT Precedence Constraints: Optimality Criteria and Complexity.- 5.4 List Schedules and Sequences of Activity Executions.- 5.5 Minimum Flow—Time Scheduling in FOR Networks.- 5.6 A Flow—Time Scheduling Example.- 5.7 Minimizing the Maximum Expected Lateness in FOR Networks.- 5.8 Essential Histories and Scheduling Policies for Min—Sum Problems in General GERT Networks.- 5.9 Elements of Dynamic Programming.- 5.10 Determination of an Optimal Scheduling Policy for the General Min—Sum Problem.- 6 Cost Minimization for STEOR and FOR Networks.- 6.1 STEOR Networks with Time—Dependent Arc Weights.- 6.2 Cost Minimization in STEOR Networks: Basic Concepts.- 6.3 A Dynamic Programming Approach.- 6.4 The Value—Iteration and Policy—Iteration Techniques.- 7 Cost and Time Minimization for Decision Project Networks.- 7.1 Decision Project Networks.- 7.2 Cost Minimization.- 7.3 Randomized Actions.- 7.4 Multiple Executions of Projects.- 7.5 Time Minimization.- References.
Le informazioni nella sezione "Su questo libro" possono far riferimento a edizioni diverse di questo titolo.
Da: Antártica, Madrid, M, Spagna
Rustica (tapa blanda). Condizione: New. Condizione sovraccoperta: Nuevo. 1. Project planning, scheduling, and control are regularly used in business and the service sector of an economy to accomplish outcomes with limited resources under critical time constraints. To aid in solving these problems, network-based planning methods have been developed that now exist in a wide variety of forms, cf. Elmaghraby (1977) and Moder et al. (1983). The so-called classical project networks, which are used in the network techniques CPM and PERT and which represent acyclic weighted directed graphs, are able to describe only projects whose evolution in time is uniquely specified in advance. Here every event of the project is realized exactly once during a single project execution and it is not possible to return to activities previously carried out (that is, no feedback is permitted). LIBRO. Codice articolo 95230
Quantità: 1 disponibili
Da: Ria Christie Collections, Uxbridge, Regno Unito
Condizione: New. In. Codice articolo ria9783540526643_new
Quantità: Più di 20 disponibili
Da: Chiron Media, Wallingford, Regno Unito
Paperback. Condizione: New. Codice articolo 6666-IUK-9783540526643
Quantità: 10 disponibili
Da: Books Puddle, New York, NY, U.S.A.
Condizione: New. pp. 260. Codice articolo 263101966
Quantità: 4 disponibili
Da: BuchWeltWeit Ludwig Meier e.K., Bergisch Gladbach, Germania
Taschenbuch. Condizione: Neu. This item is printed on demand - it takes 3-4 days longer - Neuware -Project planning, scheduling, and control are regularly used in business and the service sector of an economy to accomplish outcomes with limited resources under critical time constraints. To aid in solving these problems, network-based planning methods have been developed that now exist in a wide variety of forms, cf. Elmaghraby (1977) and Moder et al. (1983). The so-called 'classical' project networks, which are used in the network techniques CPM and PERT and which represent acyclic weighted directed graphs, are able to describe only projects whose evolution in time is uniquely specified in advance. Here every event of the project is realized exactly once during a single project execution and it is not possible to return to activities previously carried out (that is, no feedback is permitted). Many practical projects, however, do not meet those conditions. Consider, for example, a production process where some parts produced by a machine may be poorly manufactured. If an inspection shows that a part does not conform to certain specifications, it must be repaired or replaced by a new item. This means that we have to return to a preceding stage of the production process. In other words, there is feedback. Note that the result of the inspection is that a certain percentage of the parts tested do not conform. That is, there is a positive probability (strictly less than 1) that any part is defective. 260 pp. Englisch. Codice articolo 9783540526643
Quantità: 2 disponibili
Da: Majestic Books, Hounslow, Regno Unito
Condizione: New. Print on Demand pp. 260 49:B&W 6.14 x 9.21 in or 234 x 156 mm (Royal 8vo) Perfect Bound on White w/Gloss Lam. Codice articolo 5827281
Quantità: 4 disponibili
Da: Biblios, Frankfurt am main, HESSE, Germania
Condizione: New. PRINT ON DEMAND pp. 260. Codice articolo 183101956
Quantità: 4 disponibili
Da: moluna, Greven, Germania
Condizione: New. Dieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt. Project planning, scheduling, and control are regularly used in business and the service sector of an economy to accomplish outcomes with limited resources under critical time constraints. To aid in solving these problems, network-based planning methods hav. Codice articolo 4892471
Quantità: Più di 20 disponibili
Da: buchversandmimpf2000, Emtmannsberg, BAYE, Germania
Taschenbuch. Condizione: Neu. This item is printed on demand - Print on Demand Titel. Neuware -This book presents the state of the art of temporal analysis and cost minimization of projects, as well as project planning under limited resources where the projects are modelled by GERT networks. Basic concepts are summarized and the book is self-contained.Springer-Verlag KG, Sachsenplatz 4-6, 1201 Wien 260 pp. Englisch. Codice articolo 9783540526643
Quantità: 1 disponibili
Da: AHA-BUCH GmbH, Einbeck, Germania
Taschenbuch. Condizione: Neu. Druck auf Anfrage Neuware - Printed after ordering - Project planning, scheduling, and control are regularly used in business and the service sector of an economy to accomplish outcomes with limited resources under critical time constraints. To aid in solving these problems, network-based planning methods have been developed that now exist in a wide variety of forms, cf. Elmaghraby (1977) and Moder et al. (1983). The so-called 'classical' project networks, which are used in the network techniques CPM and PERT and which represent acyclic weighted directed graphs, are able to describe only projects whose evolution in time is uniquely specified in advance. Here every event of the project is realized exactly once during a single project execution and it is not possible to return to activities previously carried out (that is, no feedback is permitted). Many practical projects, however, do not meet those conditions. Consider, for example, a production process where some parts produced by a machine may be poorly manufactured. If an inspection shows that a part does not conform to certain specifications, it must be repaired or replaced by a new item. This means that we have to return to a preceding stage of the production process. In other words, there is feedback. Note that the result of the inspection is that a certain percentage of the parts tested do not conform. That is, there is a positive probability (strictly less than 1) that any part is defective. Codice articolo 9783540526643
Quantità: 1 disponibili