GERT (Graphical Evaluation and Review Technique) is a project management network analysis technique that provides for probabilistic handling of both net-work logic and activity time estimation. Dr. Alan B. Pritsker of Purdue University described the approach in 1966. In comparison to other techniques, GERT is only applied in complicated systems on a very uncommon basis. Nonetheless, the GERT strategy addresses the majority of the PERT/CPM technique's drawbacks. Loops between tasks are possible with GERT. The complexity of the programme (Monte Carlo simulation) required to represent the GERT system is the primary disadvantage of the GERT technique. This study uses GERT to assess a hypothet-ical R&D project, with the goal of enhancing project planning performance, de-termining project analysis, equipment, and resource requirements, and assisting project managers in modifying project strategies and setting contract rates.
Le informazioni nella sezione "Riassunto" possono far riferimento a edizioni diverse di questo titolo.
Da: BuchWeltWeit Ludwig Meier e.K., Bergisch Gladbach, Germania
Taschenbuch. Condizione: Neu. This item is printed on demand - it takes 3-4 days longer - Neuware -GERT (Graphical Evaluation and Review Technique) is a project management network analysis technique that provides for probabilistic handling of both net-work logic and activity time estimation. Dr. Alan B. Pritsker of Purdue University described the approach in 1966. In comparison to other techniques, GERT is only applied in complicated systems on a very uncommon basis. Nonetheless, the GERT strategy addresses the majority of the PERT/CPM technique's drawbacks. Loops between tasks are possible with GERT. The complexity of the programme (Monte Carlo simulation) required to represent the GERT system is the primary disadvantage of the GERT technique. This study uses GERT to assess a hypothet-ical R&D project, with the goal of enhancing project planning performance, de-termining project analysis, equipment, and resource requirements, and assisting project managers in modifying project strategies and setting contract rates. 84 pp. Englisch. Codice articolo 9786206157960
Quantità: 2 disponibili
Da: moluna, Greven, Germania
Condizione: New. Dieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt. Autor/Autorin: Bajaj RohitDr. Rohit Bajaj is working as Associate Professor in Chandigarh University and has a keen interest towards innovation and research. He has filed four patents currently in the Grant Phase. He has published his articles in a. Codice articolo 877798509
Quantità: Più di 20 disponibili
Da: buchversandmimpf2000, Emtmannsberg, BAYE, Germania
Taschenbuch. Condizione: Neu. This item is printed on demand - Print on Demand Titel. Neuware -GERT (Graphical Evaluation and Review Technique) is a project management network analysis technique that provides for probabilistic handling of both net-work logic and activity time estimation. Dr. Alan B. Pritsker of Purdue University described the approach in 1966. In comparison to other techniques, GERT is only applied in complicated systems on a very uncommon basis. Nonetheless, the GERT strategy addresses the majority of the PERT/CPM technique's drawbacks. Loops between tasks are possible with GERT. The complexity of the programme (Monte Carlo simulation) required to represent the GERT system is the primary disadvantage of the GERT technique. This study uses GERT to assess a hypothet-ical R&D project, with the goal of enhancing project planning performance, de-termining project analysis, equipment, and resource requirements, and assisting project managers in modifying project strategies and setting contract rates.VDM Verlag, Dudweiler Landstraße 99, 66123 Saarbrücken 84 pp. Englisch. Codice articolo 9786206157960
Quantità: 1 disponibili
Da: AHA-BUCH GmbH, Einbeck, Germania
Taschenbuch. Condizione: Neu. nach der Bestellung gedruckt Neuware - Printed after ordering - GERT (Graphical Evaluation and Review Technique) is a project management network analysis technique that provides for probabilistic handling of both net-work logic and activity time estimation. Dr. Alan B. Pritsker of Purdue University described the approach in 1966. In comparison to other techniques, GERT is only applied in complicated systems on a very uncommon basis. Nonetheless, the GERT strategy addresses the majority of the PERT/CPM technique's drawbacks. Loops between tasks are possible with GERT. The complexity of the programme (Monte Carlo simulation) required to represent the GERT system is the primary disadvantage of the GERT technique. This study uses GERT to assess a hypothet-ical R&D project, with the goal of enhancing project planning performance, de-termining project analysis, equipment, and resource requirements, and assisting project managers in modifying project strategies and setting contract rates. Codice articolo 9786206157960
Quantità: 1 disponibili
Da: preigu, Osnabrück, Germania
Taschenbuch. Condizione: Neu. Planning for a project using GERT | GERT in Project | Rohit Bajaj (u. a.) | Taschenbuch | Englisch | 2023 | LAP LAMBERT Academic Publishing | EAN 9786206157960 | Verantwortliche Person für die EU: preigu GmbH & Co. KG, Lengericher Landstr. 19, 49078 Osnabrück, mail[at]preigu[dot]de | Anbieter: preigu. Codice articolo 126946038
Quantità: 5 disponibili