Construction Project Scheduling and Control

Mubarak, Saleh

ISBN 10: 0130973149 ISBN 13: 9780130973146
Editore: Pearson Education, Limited, 2004
Usato Rilegato

Da Better World Books Ltd, Dunfermline, Regno Unito Valutazione del venditore 5 su 5 stelle 5 stelle, Maggiori informazioni sulle valutazioni dei venditori

Venditore AbeBooks dal 13 ottobre 2008

Questo articolo specifico non è più disponibile.

Riguardo questo articolo

Descrizione:

Pages intact with minimal writing/highlighting. The binding may be loose and creased. Dust jackets/supplements are not included. Stock photo provided. Product includes identifying sticker. Better World Books: Buy Books. Do Good. Codice articolo 5555943-6

Segnala questo articolo

Riassunto:

Construction Project Scheduling and Control will appeal to a broad range of readers, both students and professionals. It contains a useful blend of basic fundamentals and advanced techniques, as well as understandable theory and practical applications. This is a scheduling text reflective of today's industry.

Dalla quarta di copertina:

Construction Project Scheduling and Control will appeal to a broad range of readers, both students and professionals. It contains a useful blend of basic fundamentals and advanced techniques, as well as understandable theory and practical applications. This is a scheduling text reflective of today's industry.

Some of the key features include:
  • Numerous solved example problems as well as practice exercises.
  • References to the major software programs without making an attempt to teach them in detail.
  • Precedence networks as the major scheduling method, with coverage of arrow networks restricted to minor coverage as needed.
  • Focus on scheduling as part of the overall project management effort.

Le informazioni nella sezione "Su questo libro" possono far riferimento a edizioni diverse di questo titolo.

Dati bibliografici

Titolo: Construction Project Scheduling and Control
Casa editrice: Pearson Education, Limited
Data di pubblicazione: 2004
Legatura: Rilegato
Condizione: Good

I migliori risultati di ricerca su AbeBooks