Construction Quality & Rework Prevention (Paperback)
Lingua: inglese
Editore: Independently Published, 2026
- Brossura
- Nuovo

Da: CitiRetail, Stevenage, Regno UnitoCitiRetail
Venditore AbeBooks dal 29 giugno 2022
Condizione: Nuovo
EUR 23,80
Quantità: 1 disponibile
Aggiungi al carrelloDescrizione dell’articolo da parte del venditore
Paperback. The waterproofing membrane looked finished. Miguel Santos had walked it, clipboard in hand, and told you it was ready. Then the inspection failed. It is a site crisis every project manager knows too well. The crew has already moved to the next level. The concrete pour schedule has been shifted, access equipment struck, and the crane is on hire. Everyone involved has already decided the work is done. But on Wednesday morning, the inspector spots a tiny failure. Suddenly, a "finished" floor turns into days of costly rework, a delayed concrete pour, idle trades, and a painful, embarrassing conversation with the client. The real enemy isn't a careless subcontractor or a difficult inspector. The enemy is late quality discovery-a project structure that allows the truth about the work to surface only when it is too late to do anything about it cheaply. A defect caught before the crew leaves the floor costs minutes. A defect caught at inspection costs a rework cycle. A defect caught after the next trade has covered the work costs demolition, exposure, re-inspection, and commercial warfare. In Construction Quality & Rework Prevention, Daniel R. Whitmore reveals a game-changing truth: quality is a project management responsibility, not a delegated QA/QC task. This is not an inspection manual or a generic textbook. It is a field playbook for project managers who want to build quality into the work before inspection, catch defects early, and stop throwing away their profit margins on preventable rework. Stop Repairing the Work. Correct the Production System. Follow project manager Alex Morgan as he transitions from reactive defect-fixing to proactive quality control. Alongside superintendent Miguel Santos, commercial manager Rachel Kim, senior PM Priya Shah, and the sharp new Quality Manager, Nina Patel, you will learn how to build right the first time: Manage Quality Where Work is Planned: Control staffing continuity, sequencing, access, information flow, and commercial pressure long before an inspector ever arrives.Master First-Work Discipline: Stop letting a flawed installation method multiply. Test the method on the first unit, correct it while correction is still cheap, and only then let production scale.Check the Surrounding Conditions: Quality failures often begin in the substrate or predecessor work, not just final workmanship. Learn to verify the conditions before high-risk finishes are applied.Implement Pre-Cover Checklists: Establish a bulletproof pre-cover discipline to verify and photograph embedded, hidden, or concealed work before access disappears forever.Count the Real Cost of Rework: Rework is rarely just the material and labor to redo the work itself. Tally the lost productivity, double-handling, and trade disruption that quietly bleed your margin.Avoid "Closeout Debt" Stop letting minor defects accumulate into a "second project" at handover, leaving you with over 400 punch-list items and missing life-safety records.The Quality Prevention Toolkit Included Each of the 15 chapters closes with a field-tested, printable template to establish a proactive site rhythm: Project Quality Control SheetWorkfront Quality Readiness GatePre-Installation Quality ChecklistSubcontractor Quality Performance ScorecardRepetitive Defect Early-Warning RegisterWeekly Quality Control Meeting TemplateAnd 13 other high-impact quality tools.The cheapest defect is the one the project prevents before it is built. Scroll up, grab your copy of Book Seven today, and t Shipping may be from our UK warehouse or from our Australian or US warehouses, depending on stock availability.…
Codice articolo 9798171923877
- Titolo
- Construction Quality & Rework Prevention (Paperback)
- Autore
- Daniel R. Whitmore
- Editore
- Independently Published
- Anno di pubblicazione
- 2026
- Condizione
- new
- Rilegatura
- Paperback
- Lingua
- inglese
- ISBN 13
- 9798171923877
It is a site crisis every project manager knows too well. The crew has already moved to the next level. The concrete pour schedule has been shifted, access equipment struck, and the crane is on hire. Everyone involved has already decided the work is done. But on Wednesday morning, the inspector spots a tiny failure. Suddenly, a "finished" floor turns into days of costly rework, a delayed concrete pour, idle trades, and a painful, embarrassing conversation with the client. The real enemy isn't a careless subcontractor or a difficult inspector. The enemy is late quality discovery—a project structure that allows the truth about the work to surface only when it is too late to do anything about it cheaply. A defect caught before the crew leaves the floor costs minutes. A defect caught at inspection costs a rework cycle. A defect caught after the next trade has covered the work costs demolition, exposure, re-inspection, and commercial warfare.
In Construction Quality & Rework Prevention, Daniel R. Whitmore reveals a game-changing truth: quality is a project management responsibility, not a delegated QA/QC task. This is not an inspection manual or a generic textbook. It is a field playbook for project managers who want to build quality into the work before inspection, catch defects early, and stop throwing away their profit margins on preventable rework.
Stop Repairing the Work. Correct the Production System. Follow project manager Alex Morgan as he transitions from reactive defect-fixing to proactive quality control. Alongside superintendent Miguel Santos, commercial manager Rachel Kim, senior PM Priya Shah, and the sharp new Quality Manager, Nina Patel, you will learn how to build right the first time:
- Manage Quality Where Work is Planned: Control staffing continuity, sequencing, access, information flow, and commercial pressure long before an inspector ever arrives.
- Master First-Work Discipline: Stop letting a flawed installation method multiply. Test the method on the first unit, correct it while correction is still cheap, and only then let production scale.
- Check the Surrounding Conditions: Quality failures often begin in the substrate or predecessor work, not just final workmanship. Learn to verify the conditions before high-risk finishes are applied.
- Implement Pre-Cover Checklists: Establish a bulletproof pre-cover discipline to verify and photograph embedded, hidden, or concealed work before access disappears forever.
- Count the Real Cost of Rework: Rework is rarely just the material and labor to redo the work itself. Tally the lost productivity, double-handling, and trade disruption that quietly bleed your margin.
- Avoid "Closeout Debt": Stop letting minor defects accumulate into a "second project" at handover, leaving you with over 400 punch-list items and missing life-safety records.
- Project Quality Control Sheet
- Workfront Quality Readiness Gate
- Pre-Installation Quality Checklist
- Subcontractor Quality Performance Scorecard
- Repetitive Defect Early-Warning Register
- Weekly Quality Control Meeting Template
- And 13 other high-impact quality tools.
"Riassunto" può appartenere a un’altra edizione di questo titolo.
CitiRetail
Stevenage, Regno Unito
Venditore AbeBooks dal 29 giugno 2022
Tariffe di spedizione da Regno Unito a U.S.A.
| Articolo | Da 7 a 14 giorni lavorativi | Da 7 a 60 giorni lavorativi |
|---|---|---|
| Primo articolo | EUR 43,88 | EUR 43,88 |
Metodi di pagamento
Descrizione dello Store
Online business
Informazioni sull’azienda del venditore
ABC BOOKS LIMITED
10 John Street
London, Regno Unito WC1N 2EB
Condizioni di vendita
Orders can be returned within 30 days of receipt.
Diritto di recesso
Se sei un consumatore puoi recedere dal contratto in conformità con quanto segue. Per Consumatore si intende qualsiasi persona fisica che agisce per scopi estranei alla propria attività commerciale, imprenditoriale, artigianale o professionale.
Informazioni sul diritto di recesso
Diritto legale di recesso
Hai il diritto di recedere dal presente contratto entro 14 giorni senza fornire alcuna motivazione.
Il periodo di recesso scade dopo 14 giorni dal giorno in cui tu o una terza parte, diversa dal vettore e da te indicata, acquisisce il possesso fisico dell'ultimo bene o dell'ultimo lotto o pezzo.
Per esercitare il diritto di recesso, compila e invia elettronicamente una dichiarazione esplicita sul nostro sito Web, alla voce “I miei acquisti” nella sezione “Mio account”. Ti comunicheremo senza indugio una conferma di ricezione di tale recesso su un supporto durevole (ad es. via e-mail).
Per rispettare il termine di recesso, è sufficiente inviare la comunicazione relativa all'esercizio del diritto di recesso prima della scadenza del periodo di recesso stesso.
Effetti del recesso
In caso di recesso dal presente contratto, ti rimborseremo tutti i pagamenti ricevuti, compresi i costi di spedizione (ad eccezione dei costi supplementari derivanti dalla tua eventuale scelta di un tipo di spedizione diverso dal tipo meno costoso di consegna standard da noi offerto).
Potremo effettuare una detrazione dal rimborso per la perdita di valore dei beni forniti, qualora tale perdita sia il risultato di una manipolazione non necessaria da parte tua.
Eseguiremo il rimborso senza indebito ritardo e non oltre 14 giorni dal giorno in cui saremo informati della tua decisione di recedere dal presente contratto.
Il rimborso sarà effettuato utilizzando lo stesso mezzo di pagamento da te usato per la transazione iniziale, salvo che tu non abbia espressamente concordato altrimenti; in ogni caso, non dovrai sostenere alcun costo quale conseguenza di tale rimborso.
Possiamo trattenere il rimborso finché non avremo ricevuto i beni oppure finché non avrai fornito la prova di averli rispediti, a seconda di quale condizione si verifichi per prima.
Dovrai rispedire i beni o consegnarli a CitiRetail, Stevenage, United Kingdom, senza indebito ritardo e, in ogni caso, entro 14 giorni dal giorno in cui ci hai comunicato la tua volontà di recedere dal presente contratto. Il termine è rispettato se rispedisci i beni prima della scadenza del periodo di 14 giorni. I costi diretti della restituzione dei beni saranno a tuo carico. Sei responsabile solo della diminuzione del valore dei beni risultante da una manipolazione diversa da quella necessaria per stabilire la natura, le caratteristiche e il funzionamento dei beni stessi.
Eccezioni al diritto di recesso
Il diritto di recesso non si applica a:
- La fornitura di giornali, periodici o riviste ad eccezione dei contratti di abbonamento; e
- La fornitura di contenuto digitale non fornito su un supporto materiale (ad es. su un CD o DVD), se al momento dell'invio dell'ordine hai accettato l'inizio dell'esecuzione e hai riconosciuto che non avresti potuto recedere una volta iniziata l'esecuzione.
Condizioni di spedizione
Please note that titles are dispatched from our US, Canadian or Australian warehouses. Delivery times specified in shipping terms. Orders ship within 2 business days. Delivery to your door then takes 7-14 days.