Dam Surveillance / Surveillance Barrages: Lessons Learnt from Case Histories / Lecons Tirees D'etudes de Cas
Lingua: inglese
Editore: CRC Pr I Llc, 2022
- Brossura
- Nuovo

Da: Revaluation Books, Exeter, Regno UnitoRevaluation Books
Venditore AbeBooks dal 6 gennaio 2003
Condizione: Nuovo
EUR 143,83
Quantità: 1 disponibile
Aggiungi al carrelloDescrizione dell’articolo da parte del venditore
bilingual edition. 302 pages. 9.00x6.00x0.50 inches. In Stock. This item is printed on demand.
Codice articolo __1032229403
- Titolo
- Dam Surveillance / Surveillance Barrages: Lessons Learnt from Case Histories / Lecons Tirees D'etudes de Cas
- Autore
- Cigb, Icold (Editor)
- Editore
- CRC Pr I Llc
- Anno di pubblicazione
- 2022
- Condizione
- Brand New
- Rilegatura
- Paperback
- Lingua
- inglese
- ISBN 10
- 1032229403
- ISBN 13
- 9781032229409
- Peso dell'articolo
- 0,56 chilogrammi
- Serie
- Libro 24 di 32: ICOLD Bulletins Series
ICOLD Bulletin 180 presents the vast experience gained over the past 6 decades by the dam engineering community in the field of dam surveillance by means of 80 case histories. The documented case histories endeavour to cover the practical experiences related with one or several of the following points:
a) Methods for the improvement of the quality and reliability of information.
b) Data processing and representation techniques.
c) Effective Diagnostic analyses to determine behaviour patterns.
d) Dedicated surveillance systems for the optimization of maintenance, rehabilitation, and other life cycle costs.
e) Impact of surveillance on preventing dam incidents and dam failure.
f) Overview of dam surveillance management systems.
The case histories cover a wide variety of technical aspects and deal with success stories but also incidents, some of them with catastrophic consequences. The time framework spans over 70 years: from the times of the Second World War up to the present. The purpose is to learn from these practical experiences, not to criticize the involved individuals, who had to work with the techniques and rules of practice available at the time. This bulletin wants to contribute to keep learning from the experience of the dam engineering community, specifically in the field of dam surveillance. Some of the case histories are widely known and have been described and analysed in numerous publications. Most of them are related to famous dam failure incidents and were compiled as international “benchmark case histories” for this bulletin to focus on the specific lessons learnt related with dam surveillance.
Le Bulletin de la CIGB 180 présente la vaste expérience acquise au cours des 6 dernières décennies par la communauté des ingénieurs de barrages dans le domaine de la surveillance des barrages au moyen de 80 histoires de cas. Les histoires de cas documentées s'efforcent de couvrir les expériences pratiques liées à un ou plusieurs des points suivants :
a) Méthodes d'amélioration de la qualité et de la fiabilité de l'information.
b) Techniques de traitement et de représentation des données.
c) Analyses diagnostiques efficaces pour déterminer les modèles de comportement.
d) Systèmes de surveillance dédiés pour l'optimisation de la maintenance, de la réhabilitation et des autres coûts du cycle de vie.
e) Impact de la surveillance sur la prévention des incidents et des ruptures de barrage.
f) Aperçu des systèmes de gestion de la surveillance des barrages.
Les histoires de cas couvrent une grande variété d'aspects techniques et traitent de réussites mais aussi d'incidents, dont certains avec des conséquences catastrophiques. Le cadre temporel s'étend sur 70 ans : de l'époque de la Seconde Guerre mondiale à nos jours. Le but est d'apprendre de ces expériences pratiques, pas de critiquer les individus impliqués, qui ont dû travailler avec les techniques et les règles de pratique disponibles à l'époque. Ce bulletin veut contribuer à continuer d'apprendre de l'expérience de la communauté de l'ingénierie des barrages, en particulier dans le domaine de la surveillance des barrages. Certaines des histoires de cas sont largement connues et ont été décrites et analysées dans de nombreuses publications. La plupart d'entre eux sont liés à des incidents de rupture de barrages célèbres et ont été compilés en tant qu'« histoires de cas de référence » internationales pour ce bulletin afin de se concentrer sur les leçons spécifiques apprises liées à la surveillance des barrages.
"Riassunto" può appartenere a un’altra edizione di questo titolo.
Informazioni sull’autore
The Commission Internationale des Grands Barrages (CIGB) / International Commission on Large Dams (ICOLD) is a non-governmental International Organization which provides a forum for the exchange of knowledge and experience in dam engineering.
The Organization leads the profession in ensuring that dams are built safely, efficiently, economically, and without detrimental effects on the environment. Its original aim was to encourage advances in the planning, design, construction, operation, and maintenance of large dams and their associated civil works, by collecting and disseminating relevant information and by studying related technical questions.
Since the late sixties, focus was put on subjects of current concern such as dam safety, monitoring of performance, reanalysis of older dams and spillways, effects of ageing and environmental impact. More recently, new subjects include cost studies at the planning and construction stages, harnessing international rivers, information for the public at large, and financing.
"Descrizione articolo" può appartenere a un’altra edizione di questo titolo.
Revaluation Books
Exeter, Regno Unito
Venditore AbeBooks dal 6 gennaio 2003
Tariffe di spedizione da Regno Unito a U.S.A.
| Articolo | Da 7 a 14 giorni lavorativi | Da 2 a 3 giorni lavorativi |
|---|---|---|
| Primo articolo | EUR 14,84 | EUR 35,61 |
Metodi di pagamento
Informazioni sull’azienda del venditore
Edward Bowditch Ltd
Exstowe, Exton
Exeter, Regno Unito EX3 0PP
Condizioni di vendita
Legal entity name: Edward Bowditch Ltd
Legal entity form: Limited company
Business correspondence address: Exstowe, Exton, Exeter, EX3 0PP
Company registration number: 04916632
VAT registration: GB834241546
Authorised representative: Mr. E. Bowditch
Diritto di recesso
Se sei un consumatore puoi recedere dal contratto in conformità con quanto segue. Per Consumatore si intende qualsiasi persona fisica che agisce per scopi estranei alla propria attività commerciale, imprenditoriale, artigianale o professionale.
Informazioni sul diritto di recesso
Diritto legale di recesso
Hai il diritto di recedere dal presente contratto entro 14 giorni senza fornire alcuna motivazione.
Il periodo di recesso scade dopo 14 giorni dal giorno in cui tu o una terza parte, diversa dal vettore e da te indicata, acquisisce il possesso fisico dell'ultimo bene o dell'ultimo lotto o pezzo.
Per esercitare il diritto di recesso, compila e invia elettronicamente una dichiarazione esplicita sul nostro sito Web, alla voce “I miei acquisti” nella sezione “Mio account”. Ti comunicheremo senza indugio una conferma di ricezione di tale recesso su un supporto durevole (ad es. via e-mail).
Per rispettare il termine di recesso, è sufficiente inviare la comunicazione relativa all'esercizio del diritto di recesso prima della scadenza del periodo di recesso stesso.
Effetti del recesso
In caso di recesso dal presente contratto, ti rimborseremo tutti i pagamenti ricevuti, compresi i costi di spedizione (ad eccezione dei costi supplementari derivanti dalla tua eventuale scelta di un tipo di spedizione diverso dal tipo meno costoso di consegna standard da noi offerto).
Potremo effettuare una detrazione dal rimborso per la perdita di valore dei beni forniti, qualora tale perdita sia il risultato di una manipolazione non necessaria da parte tua.
Eseguiremo il rimborso senza indebito ritardo e non oltre 14 giorni dal giorno in cui saremo informati della tua decisione di recedere dal presente contratto.
Il rimborso sarà effettuato utilizzando lo stesso mezzo di pagamento da te usato per la transazione iniziale, salvo che tu non abbia espressamente concordato altrimenti; in ogni caso, non dovrai sostenere alcun costo quale conseguenza di tale rimborso.
Possiamo trattenere il rimborso finché non avremo ricevuto i beni oppure finché non avrai fornito la prova di averli rispediti, a seconda di quale condizione si verifichi per prima.
Dovrai rispedire i beni o consegnarli a Revaluation Books, Hounslow, United Kingdom, senza indebito ritardo e, in ogni caso, entro 14 giorni dal giorno in cui ci hai comunicato la tua volontà di recedere dal presente contratto. Il termine è rispettato se rispedisci i beni prima della scadenza del periodo di 14 giorni. I costi diretti della restituzione dei beni saranno a tuo carico. Sei responsabile solo della diminuzione del valore dei beni risultante da una manipolazione diversa da quella necessaria per stabilire la natura, le caratteristiche e il funzionamento dei beni stessi.
Eccezioni al diritto di recesso
Il diritto di recesso non si applica a:
- La fornitura di giornali, periodici o riviste ad eccezione dei contratti di abbonamento; e
- La fornitura di contenuto digitale non fornito su un supporto materiale (ad es. su un CD o DVD), se al momento dell'invio dell'ordine hai accettato l'inizio dell'esecuzione e hai riconosciuto che non avresti potuto recedere una volta iniziata l'esecuzione.
Condizioni di spedizione
Orders usually dispatched within two working days.