Learning from the textbook: large boiler operation(Chinese Edition)

Lingua: cinese

Editore: China Electric Power Press, 2000

780125497X / 9787801254979

Da: liu xing, Nanjing, JS, Cinaliu xing

Venditore con 5 stelle

Venditore AbeBooks dal 7 aprile 2009

Visualizza gli articoli di questo venditore
Brossura

Condizione: Nuovo

EUR 42,66

EUR 15,53 spedizione 
Spedito da Cina a U.S.A.
Metodi di pagamento accettati dal venditore
  • Bonifico bancario
  • PayPal

Quantità: 1 disponibili

Aggiungi al carrello
Resi gratuiti per 30 giorni
Vuoi pagare con carta di credito?
  • Visa
  • Mastercard
  • American Express
  • Apple Pay
  • Google Pay
Acquista su AbeBooks.com

Descrizione dell’articolo da parte del venditore

Ship out in 2 business day, And Fast shipping, Free Tracking number will be provided after the shipment.Paperback. Pub Date: 1998 05 of Pages: 235 Publisher: China Electric Power Press Learning from the textbook: large boiler running focuses on the basic principle and practicality. not only about the large-scale natural circulation boiler. controlled circulation boilers. once-through boiler burning coal run the basic principle of the powder boiler startup. shutdown. normal operation. but also on the characteristics of large boilers. coordination control and safety protection of new technology to do a proper introduction. Learning from the textbook: large boiler operation colleges heat power engineering undergraduate textbooks. but also can be used as the Workers' University. of correspondence teaching materials. also available to run in thermal power plants. design and engineering and technical personnel start debugging reference. Contents: Section II of the large power plant boilers Overview Preface Chapter Section I boiler capacity parameters and cycle ways typical boiler section III automatic control of boiler startup and shutdown Section I Overview Chapter II boiler startup and outage safety economy start with the outage of the third quarter of Section 2 Power Unit heating surface during startup security System Section II drum boiler start the fourth quarter to start the process of combustion conditions Chapter drum boiler start first section starts with stopping Section III of the shipping process steam drum the start stress the fourth quarter pot water circulation pump automatically run Section V Embarkation process steam temperature and water level in Section VI shipment of the condition and wash silicon process sodas Chapter DC boiler start the first section once-through boiler start characteristics Section II Boiler Start bypass system the basic procedures of Section III DC boiler Kai outage Section IV Boiler Start conditions of normal operation of the first section of the fifth chapter of the drum boiler Overview Section II boiler state parameter monitoring requirements section static characteristics of the fourth quarter of section V of the dynamic characteristics of state parameter adjustment static characteristics of the sixth chapter of the DC characteristics and adjust the characteristics of the boiler status parameters Section 1 Section II of the dynamic characteristics of the third quarter to adjust the characteristics of Chapter VII of the milling system start and stop and transported economical operation in the fourth quarter of milling system common fault line first milling system start and stop the running of the second milling system to adjust the third quarter pulverizing system and deal with Chapter VIII of the boiler combustion control and regulation Section I pulverized coal burner ignition furnace Cause of Explosion in section II. and the prevention of section IV of the measures in the third quarter furnace safety supervisory system boiler combustion regulation automatically adjusts the combustion section V. Chapter large capacity thermal power peaking first transformer run advantages and disadvantages of Section II of Chapter 10 of the transformer to run the boiler running unit unit load to adjust the load adjustment method in section II of Section 1 Power Unit Power Unit Load Control System Section III unit unit run controlFour Satisfaction guaranteed,or money back.

Codice articolo NE003652

Dati bibliografici

Titolo
Learning from the textbook: large boiler operation(Chinese Edition)
Autore
JIN WEI QIANG
Editore
China Electric Power Press
Anno di pubblicazione
2000
Condizione
New
Rilegatura
paperback
Lingua
cinese
ISBN 10
780125497X
ISBN 13
9787801254979

liu xing

Nanjing, JS, Cina

Venditore con 5 stelle

Venditore AbeBooks dal 7 aprile 2009

Tariffe di spedizione da Cina a U.S.A.

ArticoloDa 16 a 30 giorni lavorativiDa 8 a 16 giorni lavorativi
Primo articoloEUR 15,53EUR 25,88
I tempi di consegna sono stabiliti dai venditori e variano in base al corriere e al paese. Gli ordini che devono attraversare una dogana possono subire ritardi e spetta agli acquirenti pagare eventuali tariffe o dazi associati. I venditori possono contattarti in merito ad addebiti aggiuntivi dovuti a eventuali maggiorazioni dei costi di spedizione dei tuoi articoli.

Metodi di pagamento

Su AbeBooks.com puoi pagare con la tua carta di credito.
  • Bonifico bancario
  • PayPal

Descrizione dello Store

Thank you for visiting My bookstore! We are an online bookstore, and Is the China's largest online book sales. Generally our books are from China, with reasonable price and decent printing quality. We are always trying our best to satisfy customer's needs!

Specializzazione

Chemistry, Mathematics, Computer, Physics, Environment, Social Sciences

Informazioni sull’azienda del venditore

NAN JING SHI JIANG NING QU NING YUAN DIAN ZI SHANG WU ZHONG XIN

Room 264, Oujiang Shopping Center, No. 1 Dongxin South Road, Dongshan Street, Jiangning District, NanJing
Nanjing, JS Cina 211100