Post-Project Monitoring of BMP's/SUDS to Determine Performance and Whole-Life Costs

Lingua: inglese

Editore: IWA Publishing, GB, 2004

1843397161 / 9781843397168

Da: Rarewaves.com UK, London, Regno UnitoRarewaves.com UK

Venditore con 5 stelle

Venditore AbeBooks dal 11 giugno 2025

Brossura

Condizione: Nuovo

EUR 191,02

EUR 76,63 spedizione 
Spedito da Regno Unito a U.S.A.

Quantità: 4 disponibili

Aggiungi al carrello
Resi gratuiti per 30 giorni

Descrizione dell’articolo da parte del venditore

Over the past 20 years, the use of Best Management Practices (BMPs) in the United States has been instrumental in reducing both the detrimental impacts to receiving water quality and the exacerbated flooding caused by urbanization and storm water drainage. More recently, Sustainable Urban Drainage Systems (SUDS) have started to be used in the United Kingdom. Both SUDS and BMPs attempt to mimic the drainage patterns of the natural watershed, and can also provide a degree of treatment needed to improve the quality of the water discharged to an acceptable level. The costs of conventional stormwater collection systems are determined primarily in terms of initial capital expenditure. Long-term maintenance costs are absorbed by stormwater authorities that are responsible for maintaining their infrastructure as part of their "asset base". Currently, only a few of these responsibilities exist for BMPs and SUDS, which generally incorporate surface components and are often dependent on landscaping rather than on traditional construction techniques, but may require significant regular maintenance. Any potential adopting organization will require guidance on the maintenance regimes of different types of systems and how such regimes translate into long-term adoption costs. The project is being conducted in two phases. Phase 1, which is the subject of this report, includes a literature review and a survey of stormwater authorities and organizations in the US and UK to identify the most commonly used BMPs and SUDS and to determine the availability of data on their cost and performance. As part of Phase 2, the operation of selected BMPs and SUDS will be monitored over a one-year period in terms of pollutant removal and hydrologic/hydraulic efficiency, and applicability of their design criteria and maintenance regime. The protocols developed in Phase 1 will be used to assess BMPs/SUDS performance and whole-life costs.…

Codice articolo LU-9781843397168

Titolo
Post-Project Monitoring of BMP's/SUDS to Determine Performance and Whole-Life Costs
Autore
L. K. Lampe
Editore
IWA Publishing, GB
Anno di pubblicazione
2004
Condizione
New
Rilegatura
Paperback
Lingua
inglese
ISBN 10
1843397161
ISBN 13
9781843397168

Rarewaves.com UK

London, Regno Unito

Venditore con 5 stelle

Venditore AbeBooks dal 11 giugno 2025

Tariffe di spedizione da Regno Unito a U.S.A.

ArticoloDa 60 a 60 giorni lavorativiDa 60 a 60 giorni lavorativi
Primo articoloEUR 76,63EUR 117,89
I tempi di consegna sono stabiliti dai venditori e variano in base al corriere e al paese. Gli ordini che devono attraversare una dogana possono subire ritardi e spetta agli acquirenti pagare eventuali tariffe o dazi associati. I venditori possono contattarti in merito ad addebiti aggiuntivi dovuti a eventuali maggiorazioni dei costi di spedizione dei tuoi articoli.

Metodi di pagamento

  • Visa
  • Mastercard
  • American Express
  • Carte Bleue
  • Apple Pay
  • Google Pay

Informazioni sull’azienda del venditore

RAREWAVES.COM LIMITED

Elsley Court, 20-22 Great Titchfield Street
London, Regno Unito W1W 8BE