Power System Operation with Large Scale Stochastic Wind Power Integration: Interval Arithmetic Based Analysis and Optimization Methods (Springer Theses)
Lingua: inglese
Editore: Springer 2018-06-23, 2018
- Brossura
- Nuovo

Da: Chiron Media, Wallingford, Regno UnitoChiron Media
Venditore AbeBooks dal 2 agosto 2010
Condizione: Nuovo
EUR 113,63
Quantità: 10 disponibili
Aggiungi al carrelloCodice articolo 6666-IUK-9789811096518
- Titolo
- Power System Operation with Large Scale Stochastic Wind Power Integration: Interval Arithmetic Based Analysis and Optimization Methods (Springer Theses)
- Autore
- Tao Ding
- Editore
- Springer 2018-06-23
- Anno di pubblicazione
- 2018
- Condizione
- New
- Rilegatura
- Paperback
- Lingua
- inglese
- ISBN 10
- 9811096511
- ISBN 13
- 9789811096518
- Serie
- Libro 186 di 797: Springer Theses
"Riassunto" può appartenere a un’altra edizione di questo titolo.
Informazioni sull’autore
Research Area:
Power System Operations, Power System Economics, Electricity Market, Optimization Research
Honors:
Outstanding Graduate Awards from Southeast University in 2009
College Outstanding Undergraduate Thesis of Southeast University in 2009
Outstanding Student Awards in 2010
College Innovation Awards in 2010College Outstanding Master Thesis of Southeast University in 2012
National Scholarship Awards in 2014
College Outstanding Doctoral Thesis of Tsinghua University in 2015
Outstanding Graduate Awards from Tsinghua University in 2015
Outstanding Graduate Awards from Beijing City in 2015
Publication List:
[1] Tao Ding, Linquan Bai, Zhaohong Bie, Fangxing Li, “An Adjustable Robust Optimal Power Flow with the Price of Robustness for Large-scale Power Systems” IET Generation, Transmission&Distribution, 2016, in-press.[2] Tao Ding, Jiajun Lv, Rui Bo, Zhaohong Bie, Fangxing Li, “Lift-and-Project MVEE Based Convex Hull for Robust SCED with Wind Power Integration Using Historical Data-Driven Modeling,” Renewable Energy, 2016, in-press.
[3] Tao Ding, Kai Sun, Can Huang, Zhaohong Bie, Fangxing Li, “Mixed Integer Linear Programming-based Splitting Strategies for Power System Islanding Operation Considering Network Connectivity”, IEEE Systems Journal, 2016, in-press.
[4] Can Huang, Fangxing Li, Tao Ding, Yumin Jiang, Jiahui Guo, Yilu Liu, “A Bounded Model of the Communication Delay for System Integrity Protection Schemes,” IEEE Transactions on Power Delivery, 2016, in-press.
[5] Tao Ding, Rui Bo, Fangxing Li, Hongbin Sun, “Optimal Power Flow with the Consideration of Flexible Transmission Line Impedance”, IEEE Transactions on Power Systems, 2016, in-press.[6] Hu Yuan, Bie Zhaohong, Ding Tao, Yanling Lin, “An NSGA-II based multi-objective optimization for combined gas and electricity network expansion planning”, Applied Energ, in-press, 2016.
[7] Tao Ding, Shiyu Liu, Wei Yuan, Zhaohong Bie, Bo Zeng, “A Two-Stage Robust Reactive Power Optimization Considering Uncertain Wind Power Integration in Active Distribution Networks”, IEEE Transactions on Sustainable Energy, 2016, vol. 7, no. 1, pp. 301-311, 2016.
[8] Tao Ding, Rui Bo, Qinglai Guo, Hongbin Sun, “A robust two-level coordinated static voltage condition for centralized wind power integration”, IEEE Transactions on Smart Grid, vol. 7, no. 1 pp. 460-470, 2016.
[9] Tao Ding, Xue Li, Fangxing Li, Hongbin Sun, “Interval radial power flow using extended distflow formulation and Krawczyk iteration method with sparse approximate inverse preconditioner”, IET Generation, Transmission&Distribution, vol. 9., no. 14, pp.1998-2006, 2015.
[10] Tao Ding, Rui Bo, “Closure to Discussion on ‘Interval Power Flow Analysis Using Linear Relaxation and Optimality-Based Bounds Tightening (OBBT) Methods’”, IEEE Transactions on Power Systems, vol. 30., no. 4, pp. 2203-2203, 2015.
[11] Can Huang, Fangxing Li, Tao Ding, Zhiqiang Jin, “Second-order Cone Programming Based Optimal Control for Wind Energy Conversion Systems over Complete Operating Regions”, IEEE Transactions on Sustainable Energy, vol. 6., no. 1, pp.263-271, 2015.
[12] Tao Ding, Rui Bo, Fangxing Li, Hongbin Sun, “A bi-level branch and bound method for economic dispatch with disjoint prohibited zones considering network losses”, IEEE Transactions on Power Systems, vol. 30 No.6. pp.2841-2855, 2015.
[13] Tao Ding, Rui Bo, Fangxing Li, Qinglai Guo, Hongbin Sun, Wei Gu, Gan Zhou,“Interval power flow analysis using linear relaxation and optimality-based bounds tightening (OBBT) methods,” IEEE Transactions on Power Systems, vol. 30, no. 1, pp. 177-188, 2015.
[14] Tao Ding, Rui Bo, Fangxing Li, Yang Gu, Qinglai Guo, Hongbin Sun. “Exact penalty function based constraint relaxation method for optimal power flow considering wind generation uncertainty,” IEEE Transactions on Power Systems, vol. 30, no. 3, pp. 1546-1547, 2015.
[15] Tao Ding, Rui Bo, Wei Gu, Hongbin Sun. “Big-M based MIQP method for economic dispatch with disjoint prohibited zones,” IEEE Transactions on Power Systems, vol. 29, no. 2, pp. 976-977, March 2014.
[16] Tao Ding, Rui Bo, Wei Gu, Qinglai Guo, Hongbin Sun, “Absolute value constraint based method for interval optimization to SCED model,” IEEE Transactions on Power Systems, vol. 29, no. 2, pp. 980-981, March 2014.
[17] Tao Ding, Qinglai Guo, Rui Bo, Hongbin Sun, and Boming Zhang, “A Static Voltage Security Region for Centralized Wind Power Integration - Part I: Concept and Method,” Energies, vol. 7, no. 1, pp. 420-443, 2014.
[18] Tao Ding, Qinglai Guo, Rui Bo, Hongbin Sun, and Boming Zhang, “A Static Voltage Security Region for Centralized Wind Power Integration - Part II: Applications,” Energies, vol. 7, no. 1, pp. 444-461, 2014.
[19] Wei Gu, Lizi Luo, Tao Ding, Xiaoli Meng; Wanxing Sheng, “An affine arithmetic-based algorithm for radial distribution system power flow with uncertainties,” International Journal of Electrical Power & Energy Systems, vol. 58, pp. 242-245, 2014.
[20] Tao Ding, Rui Bo, Hongbin Sun, Can Huang, Fangxing Li, “Robust Mean-Variance Optimization for Self-scheduling of Thermal Producer and Its Price of Robustness,” Proceedings of the CSEE, vol. 35, no. 2, pp. 319-326, 2015. (in Chinese)[21] Tao Ding, Rui Bo, Zhengyi Yao, Hongbin Sun, “Real-time Economic Dispatch Model With Prohibited Zones Considering Maximum Wind Power Injection,” Proceedings of the CSEE, vol. 35, no. 4, pp. 759-765, 2015. (in Chinese)
[22] Tao Ding, Rui Bo, Qinglai Guo, Hongbin Sun, Can Huang, Fangxing Li, “Identification of Inactive Constraints for SCED Model Considering Uncertain Power Injection,” Proceedings of the CSEE, vol. 34, no. 34, pp. 6050-6057, 2014. (in Chinese)
[23] Tao Ding, Qinglai Guo, Rui Bo, Wei Gu, Hongbin Sun, Boming Zhang, “Solving of Interval DC Power Flow Using Interval Hull Algorithm with Preconditioning,” Automation of Electric Power Systems, vol. 38, no. 3, pp. 130-136, 2014. (in Chinese)
[24] Fengda Xu, Qinglai Guo, Hongbin Sun, Boming Zhang, Bin Wang, Zhengsuo Li, Tao Ding, “Analysis and Simulation Research on Cascading Trips of Multiple Wind Farms,” Power System Technology, vol. 38, no. 6, pp. 1426-1431, 2014. (in Chinese)[25] Tao Ding, Qinglai Guo, Hongbin Sun, Fengda Xu, “A Voltage Control Strategy for Preventing Cascading Trips of Large-scale Wind Power in Centralized Area,” Automation of Electric Power Systems, vol. 38, no. 11, pp. 7-12, 2014. (in Chinese)
[26] Tao Ding, Qinglai Guo, Rui Bo, Liping Zhang, Hongbin Sun, Wenchuan Wu, Boming Zhang, “Interval Economic Dispatch Model with Uncertain Wind Power Injection and Spatial Branch and Bound Method,” Proceedings of the CSEE, vol. 34, no. 22, pp. 3707-3714, 2014. (in Chinese)
[27] Tao Ding, Qinglai Guo, Rui Bo, Hongbin Sun, Wenchuan Wu, Boming Zhang, Zhengyi Yao, “Two-stage Heuristic-correction for Dynamic Reactive Power Optimization Based on Relaxation-MPEC and MIQP,” Proceedings of the CSEE, vol. 34, no. 13, pp. 2100-2107, 2014. (in Chinese)
[28] Tao Ding, Wei Gu, Qiulan Wan, “Disturbances Identification Based on Minimum Volume Enclosing Ellipsoid Theory and Wide Area Measurement System,” Automation of Electric Power Systems, vol. 37, no. 3, pp. 38-42, 2014. (in Chinese)[29] Tao Ding, Qinglai Guo, Hongbin Sun, Rui Bo, Zhengyi Yao, “Power System Economic Dispatch with Prohibited Zones,” Journal of Tsinghua University(Science and Technology), vol. 53, no. 4, pp. 447-452, 2013. (in Chinese)
[30] Tao Ding, Rui Bo, Qinglai Guo, Hongbin Sun, Wenchuan Wu, Boming Zhang, “A Non-iterative Affine Arithmetic Methodology for Interval Power Flow Analysis of Transmission Network,” Proceedings of the CSEE, vol. 33, no. 19, pp. 76-83, 2013. (in Chinese)
[31] Tao Ding, Bofeng Dong, Wei Gu, Qiulan Wan, “Optimization of a load shedding scheme using dynamic voltage stability linearized index based on PMU,” Power System Protection and Control, vol. 41, no. 9, pp. 27-33, 2013. (in Chinese)
[32] Ziqun Yang, Tao Ding, “Unscented Kalman Filter algorithm for on-line identification of parameters of induction motor model,” Power System Protection and Control, vol. 40, no. 24, pp. 84-88, 2012. (in Chinese)[33] Tao Ding, Hantao Cui, Wei Gu, Qiulan Wan, “An Uncertainty Power Flow Algorithm Based on Interval and Affine Arithmetic,” Automation of Electric Power Systems, vol. 36, no. 13, pp. 51-55, 2012. (in Chinese)
[34] Tao Ding, Yu Wang, Wei Gu, Qiulan Wan, “Characteristic attribute selection based on feature score criterion and application in voltage stability analysis,” Electric Power Automation Equipment, vol. 32, no. 10, pp. 132-137, 2012. (in Chinese)
[35] Qiulan Wan, Tao Ding, Ying Wang, Zhaoxing Ma, “An Algorithm for Online Identification of Nodes with Weak Voltage Stability,” Power System Technology, vol. 36, no. 3, pp. 156-161, 2012. (in Chinese)
[36] Zhaoxing Ma, Qiulan Wan, Hongmei Li, Tao Ding, “A voltage stability control method of SVC based on neural network,” Power System Protection and Control, vol. 39, no. 18, pp. 67-71, 2011. (in Chinese)[37] Zhaoxing Ma, Qiulan Wan, Tao Ding, Hongmei Li, “Voltage Stability Analysis Based on Limit Induced Bifurcation,” Power System Technology, vol. 35, no. 10, pp. 94-98, 2011. (in Chinese)
[38] Wei Gu, Tao Ding, Ziqun Yang, Qiulan Wan, “Online Voltage Security Assessment Using Multiple Dynamic Decision Tree,” Proceedings of the CSEE, vol. 31, no. 31, pp. 142-148, 2011. (in Chinese)
[39] Mei Li, Tao Ding, Wei Gu, Qiulan Wan, “Synchronous phasor correction under frequency offset,” Journal of Southeast University(Natural Science Edition), vol. 41, no. 4, pp. 744-749, 2011. (in Chinese)
[40] Shanke Mou, Tao Ding, Wei Gu, Qiulan Wan, “An improved algorithm for on-line tracking Thevenin equivalent parameters based on deviation correction,” Power System Protection and Control, vol. 39, no. 2, pp. 23-28, 2011. (in Chinese)
[41] Xian Xu, Tao Ding, Qiulan Wan, “220 kV Power Grid District-dividing Optimization for Limiting Fault Current,” Automation of Electric Power Systems, vol. 33, no. 22, pp. 98-101, 2009. (in Chinese)[42] Tao Ding, Qinglai Guo, Hongbin Sun, Fengda Xu, “A quadratic robust optimization model for automatic voltage control of wind farm,” IEEE PES General Meeting, Canada, 21-25 July, 2013.
[43] Tao Ding, Hongbin Sun, Forrest Harley, et al, “Bi-level linear programming based interval optimization for SCED in the presence of wind power uncertainty,” IEEE PES General Meeting, July, Washington DC, 2014.
[44] Tao Ding, Rui Bo, Fangxing Li, Hongbin Sun, “Interval arithmetic based optimal curtailment for infeasibility of SCED in the presence of wind power uncertainty,”, IEEE PES General Meeting, 2015.
[45] Tao Ding, Kai Sun, Xiubin Zhang, Fangxing Li, Honbing Sun, “Theory Based Splitting Strategies for Power System Islanding Operation,”, IEEE PES General Meeting, 2015.
[46] Linquan Bai, Tao Ding, Qinran Hu, Fangxing Li, Hongbin Sun, “Robust Mean-Variance Optimization Model for Grid-Connected Microgrids,”, IEEE PES General Meeting, 2015.
"Descrizione articolo" può appartenere a un’altra edizione di questo titolo.
Chiron Media
Wallingford, Regno Unito
Venditore AbeBooks dal 2 agosto 2010
Tariffe di spedizione da Regno Unito a U.S.A.
| Articolo | Da 14 a 21 giorni lavorativi | Da 14 a 21 giorni lavorativi |
|---|---|---|
| Primo articolo | EUR 18,04 | EUR 18,04 |
Metodi di pagamento
Informazioni sull’azienda del venditore
WRAP Ltd
Unit 4, 119 Loverock Rd
Reading, Regno Unito RG30 1DZ
Condizioni di vendita
TBA
Diritto di recesso
Se sei un consumatore puoi recedere dal contratto in conformità con quanto segue. Per Consumatore si intende qualsiasi persona fisica che agisce per scopi estranei alla propria attività commerciale, imprenditoriale, artigianale o professionale.
Informazioni sul diritto di recesso
Diritto legale di recesso
Hai il diritto di recedere dal presente contratto entro 14 giorni senza fornire alcuna motivazione.
Il periodo di recesso scade dopo 14 giorni dal giorno in cui tu o una terza parte, diversa dal vettore e da te indicata, acquisisce il possesso fisico dell'ultimo bene o dell'ultimo lotto o pezzo.
Per esercitare il diritto di recesso, compila e invia elettronicamente una dichiarazione esplicita sul nostro sito Web, alla voce “I miei acquisti” nella sezione “Mio account”. Ti comunicheremo senza indugio una conferma di ricezione di tale recesso su un supporto durevole (ad es. via e-mail).
Per rispettare il termine di recesso, è sufficiente inviare la comunicazione relativa all'esercizio del diritto di recesso prima della scadenza del periodo di recesso stesso.
Effetti del recesso
In caso di recesso dal presente contratto, ti rimborseremo tutti i pagamenti ricevuti, compresi i costi di spedizione (ad eccezione dei costi supplementari derivanti dalla tua eventuale scelta di un tipo di spedizione diverso dal tipo meno costoso di consegna standard da noi offerto).
Potremo effettuare una detrazione dal rimborso per la perdita di valore dei beni forniti, qualora tale perdita sia il risultato di una manipolazione non necessaria da parte tua.
Eseguiremo il rimborso senza indebito ritardo e non oltre 14 giorni dal giorno in cui saremo informati della tua decisione di recedere dal presente contratto.
Il rimborso sarà effettuato utilizzando lo stesso mezzo di pagamento da te usato per la transazione iniziale, salvo che tu non abbia espressamente concordato altrimenti; in ogni caso, non dovrai sostenere alcun costo quale conseguenza di tale rimborso.
Possiamo trattenere il rimborso finché non avremo ricevuto i beni oppure finché non avrai fornito la prova di averli rispediti, a seconda di quale condizione si verifichi per prima.
Dovrai rispedire i beni o consegnarli a Chiron Media, Wallingford, United Kingdom, senza indebito ritardo e, in ogni caso, entro 14 giorni dal giorno in cui ci hai comunicato la tua volontà di recedere dal presente contratto. Il termine è rispettato se rispedisci i beni prima della scadenza del periodo di 14 giorni. I costi diretti della restituzione dei beni saranno a tuo carico. Sei responsabile solo della diminuzione del valore dei beni risultante da una manipolazione diversa da quella necessaria per stabilire la natura, le caratteristiche e il funzionamento dei beni stessi.
Eccezioni al diritto di recesso
Il diritto di recesso non si applica a:
- La fornitura di giornali, periodici o riviste ad eccezione dei contratti di abbonamento; e
- La fornitura di contenuto digitale non fornito su un supporto materiale (ad es. su un CD o DVD), se al momento dell'invio dell'ordine hai accettato l'inizio dell'esecuzione e hai riconosciuto che non avresti potuto recedere una volta iniziata l'esecuzione.
Condizioni di spedizione
Shipping costs are based on books weighing 2.2 LB, or 1 KG. If your book order is heavy or oversized, we may contact you to let you know extra shipping is required.