Resource-Constrained Project Scheduling: Models, Algorithms, Extensions and Applications

Artigues

ISBN 10: 1848210345 ISBN 13: 9781848210349
Editore: ISTE Ltd and John Wiley & Sons Inc, 2008
Nuovi Rilegato

Da Kennys Bookstore, Olney, MD, U.S.A. Valutazione del venditore 4 su 5 stelle 4 stelle, Maggiori informazioni sulle valutazioni dei venditori

Venditore AbeBooks dal 9 ottobre 2009

Questo articolo specifico non è più disponibile.

Riguardo questo articolo

Descrizione:

Resource-Constrained Project Scheduling presents a large variety of models and algorithms dedicated to the resource-constrained project scheduling problem (RCPSP), which aims at scheduling at minimal duration a set of activities subject to precedence constraints and limited resource availabilities. Editor(s): Artigues, Christian; Demassey, Sophie; Neron, Emmanuel. Series: ISTE. Num Pages: 288 pages, Illustrations. BIC Classification: KJMV5. Category: (UP) Postgraduate, Research & Scholarly. Dimension: 238 x 164 x 22. Weight in Grams: 612. . 2008. 1st Edition. Hardcover. . . . . Books ship from the US and Ireland. Codice articolo V9781848210349

Segnala questo articolo

Riassunto:

This title presents a large variety of models and algorithms dedicated to the resource-constrained project scheduling problem (RCPSP), which aims at scheduling at minimal duration a set of activities subject to precedence constraints and limited resource availabilities.
In the first part, the standard variant of RCPSP is presented and analyzed as a combinatorial optimization problem. Constraint programming and integer linear programming formulations are given. Relaxations based on these formulations and also on related scheduling problems are presented. Exact methods and heuristics are surveyed. Computational experiments, aiming at providing an empirical insight on the difficulty of the problem, are provided.
The second part of the book focuses on several other variants of the RCPSP and on their solution methods. Each variant takes account of real-life characteristics which are not considered in the standard version, such as possible interruptions of activities, production and consumption of resources, cost-based approaches and uncertainty considerations.
The last part presents industrial case studies where the RCPSP plays a central part. Applications are presented in various domains such as assembly shop and rolling ingots production scheduling, project management in information technology companies and instruction scheduling for VLIW processor architectures.

Informazioni sull?autore: Christian Artigues is a researcher at the Laboratory for Analysis and
Architecture of Systems (LAAS) of the French National Institute for
Scientific Research (CNRS).

Sophie Demassey is an Assistant Professor at the School of Mining Engineering (EMN), Nantes, France.

Emmanuel Néron is Assistant Professor at the Computer Science Department of Polytech'Tours, France, and is a member of the Computer Science Laboratory of the University of Tours, France.

Le informazioni nella sezione "Su questo libro" possono far riferimento a edizioni diverse di questo titolo.

Dati bibliografici

Titolo: Resource-Constrained Project Scheduling: ...
Casa editrice: ISTE Ltd and John Wiley & Sons Inc
Data di pubblicazione: 2008
Legatura: Rilegato
Condizione: New

I migliori risultati di ricerca su AbeBooks

Foto dell'editore

Christian Artigues (Editor), Sophie Demassey (Editor), Emmanuel Néron (Editor)
Editore: Wiley-Blackwell, 2008
ISBN 10: 1848210345 ISBN 13: 9781848210349
Nuovo Rilegato

Da: New Book Sale, London, Regno Unito

Valutazione del venditore 5 su 5 stelle 5 stelle, Maggiori informazioni sulle valutazioni dei venditori

Hardcover. Condizione: New. Usually Dispatched within 1-2 Business Days , Buy with confidence , excellent customer service. Codice articolo 1848210345--A29

Contatta il venditore

Compra nuovo

EUR 41,04
EUR 56,92 shipping
Spedito da Regno Unito a U.S.A.

Quantità: 1 disponibili

Aggiungi al carrello

Immagini fornite dal venditore

Artigues, Christian; Demassey, Sophie; Neron, Emmanuel
Editore: Wiley-ISTE, 2008
ISBN 10: 1848210345 ISBN 13: 9781848210349
Nuovo Rilegato

Da: GreatBookPrices, Columbia, MD, U.S.A.

Valutazione del venditore 5 su 5 stelle 5 stelle, Maggiori informazioni sulle valutazioni dei venditori

Condizione: New. Codice articolo 5510716-n

Contatta il venditore

Compra nuovo

EUR 141,71
EUR 2,25 shipping
Spedito in U.S.A.

Quantità: Più di 20 disponibili

Aggiungi al carrello

Foto dell'editore

Editor: Christian Artigues (French National Institute for Scientific Research (CNRS)); Editor: Sophie Demassey (School of Mining Engineering (EMN), Nantes, France); Editor: Emmanuel Néron (Computer Science Department of Polytech'Tours, France)
Editore: John Wiley and Sons, 2008
ISBN 10: 1848210345 ISBN 13: 9781848210349
Nuovo Rilegato

Da: INDOO, Avenel, NJ, U.S.A.

Valutazione del venditore 5 su 5 stelle 5 stelle, Maggiori informazioni sulle valutazioni dei venditori

Condizione: New. Brand New. Codice articolo 9781848210349

Contatta il venditore

Compra nuovo

EUR 144,03
Spedizione gratuita
Spedito in U.S.A.

Quantità: Più di 20 disponibili

Aggiungi al carrello

Immagini fornite dal venditore

Artigues, Christian; Demassey, Sophie; Neron, Emmanuel
Editore: Wiley-ISTE, 2008
ISBN 10: 1848210345 ISBN 13: 9781848210349
Antico o usato Rilegato

Da: GreatBookPrices, Columbia, MD, U.S.A.

Valutazione del venditore 5 su 5 stelle 5 stelle, Maggiori informazioni sulle valutazioni dei venditori

Condizione: As New. Unread book in perfect condition. Codice articolo 5510716

Contatta il venditore

Compra usato

EUR 163,05
EUR 2,25 shipping
Spedito in U.S.A.

Quantità: Più di 20 disponibili

Aggiungi al carrello

Immagini fornite dal venditore

Artigues, Christian; Demassey, Sophie; Neron, Emmanuel
Editore: Wiley-ISTE, 2008
ISBN 10: 1848210345 ISBN 13: 9781848210349
Antico o usato Rilegato

Da: GreatBookPricesUK, Woodford Green, Regno Unito

Valutazione del venditore 5 su 5 stelle 5 stelle, Maggiori informazioni sulle valutazioni dei venditori

Condizione: As New. Unread book in perfect condition. Codice articolo 5510716

Contatta il venditore

Compra usato

EUR 169,32
EUR 17,07 shipping
Spedito da Regno Unito a U.S.A.

Quantità: Più di 20 disponibili

Aggiungi al carrello

Foto dell'editore

Christian Artigues
ISBN 10: 1848210345 ISBN 13: 9781848210349
Nuovo Rilegato Prima edizione

Da: Grand Eagle Retail, Bensenville, IL, U.S.A.

Valutazione del venditore 5 su 5 stelle 5 stelle, Maggiori informazioni sulle valutazioni dei venditori

Hardcover. Condizione: new. Hardcover. This title presents a large variety of models and algorithms dedicated to the resource-constrained project scheduling problem (RCPSP), which aims at scheduling at minimal duration a set of activities subject to precedence constraints and limited resource availabilities. In the first part, the standard variant of RCPSP is presented and analyzed as a combinatorial optimization problem. Constraint programming and integer linear programming formulations are given. Relaxations based on these formulations and also on related scheduling problems are presented. Exact methods and heuristics are surveyed. Computational experiments, aiming at providing an empirical insight on the difficulty of the problem, are provided. The second part of the book focuses on several other variants of the RCPSP and on their solution methods. Each variant takes account of real-life characteristics which are not considered in the standard version, such as possible interruptions of activities, production and consumption of resources, cost-based approaches and uncertainty considerations. The last part presents industrial case studies where the RCPSP plays a central part. Applications are presented in various domains such as assembly shop and rolling ingots production scheduling, project management in information technology companies and instruction scheduling for VLIW processor architectures. Resource-Constrained Project Scheduling presents a large variety of models and algorithms dedicated to the resource-constrained project scheduling problem (RCPSP), which aims at scheduling at minimal duration a set of activities subject to precedence constraints and limited resource availabilities. Shipping may be from multiple locations in the US or from the UK, depending on stock availability. Codice articolo 9781848210349

Contatta il venditore

Compra nuovo

EUR 184,14
Spedizione gratuita
Spedito in U.S.A.

Quantità: 1 disponibili

Aggiungi al carrello

Immagini fornite dal venditore

Artigues, Christian
Editore: ISTE LTD, 2008
ISBN 10: 1848210345 ISBN 13: 9781848210349
Nuovo Rilegato

Da: moluna, Greven, Germania

Valutazione del venditore 4 su 5 stelle 4 stelle, Maggiori informazioni sulle valutazioni dei venditori

Gebunden. Condizione: New. Resource-Constrained Project Scheduling presents a large variety of models and algorithms dedicated to the resource-constrained project scheduling problem (RCPSP), which aims at scheduling at minimal duration a set of activities subject to precedence const. Codice articolo 597090960

Contatta il venditore

Compra nuovo

EUR 191,11
EUR 48,99 shipping
Spedito da Germania a U.S.A.

Quantità: Più di 20 disponibili

Aggiungi al carrello

Immagini fornite dal venditore

Artigues, Christian; Demassey, Sophie; Neron, Emmanuel
Editore: Wiley-ISTE, 2008
ISBN 10: 1848210345 ISBN 13: 9781848210349
Nuovo Rilegato

Da: GreatBookPricesUK, Woodford Green, Regno Unito

Valutazione del venditore 5 su 5 stelle 5 stelle, Maggiori informazioni sulle valutazioni dei venditori

Condizione: New. Codice articolo 5510716-n

Contatta il venditore

Compra nuovo

EUR 201,97
EUR 17,07 shipping
Spedito da Regno Unito a U.S.A.

Quantità: Più di 20 disponibili

Aggiungi al carrello

Foto dell'editore

Editore: Wiley-ISTE, 2008
ISBN 10: 1848210345 ISBN 13: 9781848210349
Nuovo Rilegato

Da: Ubiquity Trade, Miami, FL, U.S.A.

Valutazione del venditore 4 su 5 stelle 4 stelle, Maggiori informazioni sulle valutazioni dei venditori

Condizione: New. Brand new! Please provide a physical shipping address. Codice articolo 9781848210349

Contatta il venditore

Compra nuovo

EUR 207,91
EUR 2,55 shipping
Spedito in U.S.A.

Quantità: Più di 20 disponibili

Aggiungi al carrello

Foto dell'editore

Christian Artigues
ISBN 10: 1848210345 ISBN 13: 9781848210349
Nuovo Rilegato Prima edizione

Da: AussieBookSeller, Truganina, VIC, Australia

Valutazione del venditore 5 su 5 stelle 5 stelle, Maggiori informazioni sulle valutazioni dei venditori

Hardcover. Condizione: new. Hardcover. This title presents a large variety of models and algorithms dedicated to the resource-constrained project scheduling problem (RCPSP), which aims at scheduling at minimal duration a set of activities subject to precedence constraints and limited resource availabilities. In the first part, the standard variant of RCPSP is presented and analyzed as a combinatorial optimization problem. Constraint programming and integer linear programming formulations are given. Relaxations based on these formulations and also on related scheduling problems are presented. Exact methods and heuristics are surveyed. Computational experiments, aiming at providing an empirical insight on the difficulty of the problem, are provided. The second part of the book focuses on several other variants of the RCPSP and on their solution methods. Each variant takes account of real-life characteristics which are not considered in the standard version, such as possible interruptions of activities, production and consumption of resources, cost-based approaches and uncertainty considerations. The last part presents industrial case studies where the RCPSP plays a central part. Applications are presented in various domains such as assembly shop and rolling ingots production scheduling, project management in information technology companies and instruction scheduling for VLIW processor architectures. Resource-Constrained Project Scheduling presents a large variety of models and algorithms dedicated to the resource-constrained project scheduling problem (RCPSP), which aims at scheduling at minimal duration a set of activities subject to precedence constraints and limited resource availabilities. Shipping may be from our Sydney, NSW warehouse or from our UK or US warehouse, depending on stock availability. Codice articolo 9781848210349

Contatta il venditore

Compra nuovo

EUR 293,50
EUR 31,50 shipping
Spedito da Australia a U.S.A.

Quantità: 1 disponibili

Aggiungi al carrello