Inside Solid State Drives (SSDs)
Rino Micheloni (u. a.)
Venduto da preigu, Osnabrück, Germania
Venditore AbeBooks dal 5 agosto 2024
Nuovi - Rilegato
Condizione: Nuovo
Spedito da Germania a U.S.A.
Quantità: 5 disponibili
Aggiungere al carrelloVenduto da preigu, Osnabrück, Germania
Venditore AbeBooks dal 5 agosto 2024
Condizione: Nuovo
Quantità: 5 disponibili
Aggiungere al carrelloInside Solid State Drives (SSDs) | Rino Micheloni (u. a.) | Buch | Springer Series in Advanced Microelectronics | xxi | Englisch | 2018 | Springer | EAN 9789811305986 | Verantwortliche Person für die EU: Springer Verlag GmbH, Tiergartenstr. 17, 69121 Heidelberg, juergen[dot]hartmann[at]springer[dot]com | Anbieter: preigu Print on Demand.
Codice articolo 113488285
The revised second edition of this respected text provides a state-of-the-art overview of the main topics relating to solid state drives (SSDs), covering NAND flash memories, memory controllers (including booth hardware and software), I/O interfaces (PCIe/SAS/SATA), reliability, error correction codes (BCH and LDPC), encryption, flash signal processing and hybrid storage.
Updated throughout to include all recent work in the field, significant changes for the new edition include:
Dr. Rino Micheloni (rino.micheloni@ieee.org) is Vice-President and Fellow at Microsemi Corporation, where he currently runs the Flash Signal Processing Labs in Milan, Italy, with special focus on NAND Flash, Error Correction Codes, and Machine Learning. Prior to joining Microsemi, he was Fellow at PMC-Sierra, working on NAND Flash characterization, LDPC, and NAND Signal Processing as part of the team developing Flash controllers for PCIe SSDs. Before that, he was with IDT (Integrated Device Technology) as Lead Flash Technologist, driving the architecture and design of the BCH engine in the world’s first PCIe NVMe SSD controller. Early in his career, he led NAND design teams at STMicroelectronics, Hynix, and Infineon/Qimonda; during this time, he developed the industry’s first MLC NOR device with embedded ECC technology and the industry’s first MLC NAND with embedded BCH.
Dr. Micheloni is IEEE Senior Member, he has co-authored more than 70 publications, and he holds 278 patents worldwide (including 131 US patents). He received the STMicroelectronics Exceptional Patent Award in 2003 and 2004, and the Infineon/Qimonda IP Award in 2007.
Dr. Micheloni has published the following books with Springer: Solid-State-Drives (SSDs) Modeling (2017), 3D Flash Memories (2016), Inside Solid State Drives (2013), Inside NAND Flash Memories (2010), Error Correction Codes for Non-Volatile Memories (2008), Memories in Wireless Systems (2008), and VLSI-Design of Non-Volatile Memories (2005).
Alessia Marelli is technical leader at Microsemi Corporation, where she takes care of the Error Correction Code and Machine Learning algorithms. She joined Microsemi from PMC-Sierra where she was part of the NAND characterization team as senior engineer with a special focus on Data Analysis and Flash Management algorithms. Before that, she was with IDT as senior designer working on ECC solutions for Flash controllers. Prior IDT, she worked in Qimonda/Infineon as digital designer and in STMicroelectronics defining the Error Correction Code for the industry’s first MLC NAND with embedded BCH. She received her degree in Mathematical Science from “Università degli Studi di Milano – Bicocca”, Italy in 2003 with a thesis about ECC applied to Flash Memories.
Alessia holds more than 20 patents regarding Error Correction Codes and is co-author of Inside Solid State Drives (Springer, 2013), Inside NAND Flash Memories (Springer, 2010), and Error Correction Codes for Non-Volatile Memories (Springer, 2008).
Kam Eshghi is Vice President of Strategy & Business Development at Lightbits Labs, a stealth-mode start-up developing innovative storage technologies for cloud infrastructure. Kam joined Lightbits Labs from DellEMC, where he was Vice President of Strategic Alliances for the DSSD division. Kam developed and managed startup DSSD's strategic partnership with EMC, ultimately leading to EMC’s acquisition of DSSD.
Previously, as Sr. Director of Marketing & Business Development at Integrated Device Technology (IDT) Kam build IDT’s NVMe Controller business from startup to industry leader. That business was then sold to PMC and is today a successful product line at Microsemi. Earlier in his career, Kam helped build product lines in storage, compute and networking markets at HP, Intel, Crosslayer Networks, and Synopsys.
Kam has a M.S. in Electrical Engineering & Computer Science and a Master of Business Administration, from Massachusetts Institute of Technology and U.C. Berkeley, respectively.
Le informazioni nella sezione "Su questo libro" possono far riferimento a edizioni diverse di questo titolo.
Visita la pagina della libreria
Standard Business Terms and customer information / data protection declaration / battery disposal
I. Standard business terms
§ 1 Basic provisions
(1) The following terms and conditions of business apply for all contracts concluded with us as the supplier (preigu GmbH & Co. KG) via the websites AbeBooks and/or ZVAB. Unless otherwise agreed, the inclusion of your own terms and conditions is explicitly rejected.
(2) A ?consumer' in the sense of the following regulations is every natural person who ...
Instructions for revocation
Revocation right for consumers
(A ‘consumer' is any natural person who concludes a legal transaction which, to an overwhelming extent, cannot be attributed to either his commercial or independent professional activities.)
Instructions for revocation
Revocation right
You have the right to revoke this contract within 14 days without specifying any reasons.
The revocation period is 14 days with effect from the day,
on which you or a third party nominated by you, which is not the carrier, had taken possession of the products, provided you had ordered one or more products within the scope of a standard order and this/these product/products is/are delivered uniformly;
on which you or a third party nominated by you, which is not the carrier, had taken possession of the last product, provided you had ordered several products within the scope of a standard order and these products are delivered separately;
on which you or a third party nominated by you, which is not the carrier, had taken possession of the last part delivery or the last unit, provided you had ordered a product, which is delivered in several part deliveries or units;
To exercise your right of withdrawal, you must inform us (preigu GmbH & Co. KG, Lengericher Landstr. 19, 49078 Osnabrück, Telephone number: +49 (0) 541 / 580 72 84, E-Mail address: mail@preigu.de) by means of a clear declaration (e.g. a letter sent by post, or an e-mail) of your decision to withdraw from this contract. You can use the attached model withdrawal form for this purpose, which is, however, not mandatory.
In order to safeguard the revocation period, it is sufficient that you send the notification about the exercise of the revocation right before the expiry of the revocation period.
Consequences of the revocation
If you revoke this contract, we shall repay all the payments, which we received from you, including the delivery costs (with the exception of additional costs, which arise from that fact that you selected a form of delivery other than the most reasonable standard delivery offered by us), immediately and at the latest within 14 days from the day on which we received the notification about the revocation of this contract from you. We use the same means of payment, which you had originally used during the original transaction, for this repayment unless expressly agreed otherwise with you; you will not be charged any fees owing to this repayment.
We can refuse the repayment until the products are returned to us or until you have furnished evidence that you have sent the products back to us, depending on whichever is earlier.
You must return or transfer the products to us immediately and, in any case, at the latest within 14 days with effect from the day on which you inform us of the revocation of this contract. The deadline is maintained if you send the products before the expiry of the 14 day deadline.
You bear the direct costs for returning the products.
You must pay for any depreciation of the products only if this depreciation can be attributed to any handling with you that was not necessary for checking the condition, features and functionality of the products.
Criteria for exclusion or expiry
The revocation right is not available for contracts
for delivery of products, which are not prefabricated and for whose manufacturing an individual selection or stipulation by the consumer is important or which are clearly tailored to the personal requirements of the consumer;
for delivery of products, which can spoil quickly or whose use-by date would be exceeded quickly;
for delivery of alcoholic drinks, whose price was agreed at the time of concluding the contract, which however can be delivered 30 days after the conclusion of the contract at the earliest and whose current value depends on the fluctuations in the market, on which the entrepreneur has no influence;
for delivery of newspapers, periodicals or magazines with the exception of subscription contracts. The revocation right expires prematurely in case of contracts
for delivery of sealed products, which are not suitable for return for reasons of health protection or hygiene if their seal has been removed after the delivery;
for delivery of products if they have been mixed inseparably with other goods after the delivery, owing to their condition;
for delivery of sound or video recording or computer software in a sealed package if the seal has been removed after the delivery.
Specimen - revocation form
(If you wish to revoke the contract, please fill up this form and send it back to us.)
To preigu GmbH & Co. KG, Lengericher Landstr. 19, 49078 Osnabrück, Email address: mail@preigu.de :
I/we () herewith revoke the contract concluded by me/ us () regarding the purchase of the following products ()/
the provision of the following service ()
Ordered on ()/ received on ()
Name of the consumer(s)
Address of the consumer(s)
Signature of the consumer(s) (only in case of a notification on paper)
Date
(*) Cross out the incorrect option.
| Quantità dell?ordine | Da 60 a 60 giorni lavorativi | Da 60 a 60 giorni lavorativi |
|---|---|---|
| Primo articolo | EUR 70.00 | EUR 70.00 |
I tempi di consegna sono stabiliti dai venditori e variano in base al corriere e al paese. Gli ordini che devono attraversare una dogana possono subire ritardi e spetta agli acquirenti pagare eventuali tariffe o dazi associati. I venditori possono contattarti in merito ad addebiti aggiuntivi dovuti a eventuali maggiorazioni dei costi di spedizione dei tuoi articoli.