Technology Standard of Pipe Jacking
Lu Wang (u. a.)
Venduto da preigu, Osnabrück, Germania
Venditore AbeBooks dal 5 agosto 2024
Nuovi - Brossura
Condizione: Nuovo
Spedito da Germania a U.S.A.
Quantità: 5 disponibili
Aggiungere al carrelloVenduto da preigu, Osnabrück, Germania
Venditore AbeBooks dal 5 agosto 2024
Condizione: Nuovo
Quantità: 5 disponibili
Aggiungere al carrelloTechnology Standard of Pipe Jacking | Lu Wang (u. a.) | Taschenbuch | xii | Englisch | 2024 | Springer | EAN 9789819955992 | Verantwortliche Person für die EU: Springer Verlag GmbH, Tiergartenstr. 17, 69121 Heidelberg, juergen[dot]hartmann[at]springer[dot]com | Anbieter: preigu.
Codice articolo 130115008
This book summarizes the technical method and construction process of pipe jacking. It has a total of 17 chapters and one appendix. It includes how to prepare the pipe jacking construction, how to choose the pipe and equipment for jacking, how to choose the engineering environment, how to do the geological survey before jacking, how to design the working pit, what's the procedure of pipe jacking, how to do the measurement and monitoring during jacking, how to do the treatment and acceptance after jacking, and so on. Appendix contains reference tables for pipe jacking archives, which might aid readers in understanding the book's content. This book's language is simple to read, and it has a wealth of graphics. Even those without a foundational understanding of pipe jacking could read and comprehend it with ease. This regulation could be the fundamental discipline for pipeline jacking projects. It is the important basis and criterion for the design, construction, management, inspection, and acceptance of pipeline jacking.
Zhiguo Wu is the chief engineer of Beijing Zhongxuan Municipal Engineering Co., Ltd and the member of the Professional Committee of the China Society of Trenchless Technology. He is proficient in mechanical pipe-jacking construction technology, has unique insights into foundation pit support, grouting drag reduction, soil improvement, settlement control, and other aspects of pipe-jacking construction, and has successfully solved various difficulties encountered in the project many times.
Yong Chen is a professor-level senior engineer and currently serves as the deputy director of the Chief Engineer's Office of Fujian Dongchen Geotechnical Foundation Engineering.
In 1996, he began to study trenchless engineering and successfully developed, popularized, and promoted it in complex geological areas of Fujian. In 2007 and 2008, he was awarded the title of ‘Outstanding Entrepreneur in National Engineering Quality Management’ by the ‘Policy Research Center of theMinistry of Construction’ for two consecutive years.
Zhaoquan Wang is the general manager and a senior engineer of Shaoxing Panshi Foundation Co., Ltd. He is the member of the Professional Committee of the China Society of Trenchless Technology. In 2000, he began to engage in the theoretical and practical research of trenchless pipe-jacking construction technology. In 2001, he co-founded a Sino-Japanese joint venture trenchless construction enterprise. By the end of 2003, he successively introduced 12 sets of ISE mud-water balance pipe-jacking machines, trained a large number of first-line pipe-jacking machine operators by using the self-writing teaching materials, and cooperated with Japanese technical experts to develop a mud-water balance pipe-jacking machine suitable for Chinese soil layers. In 2004, Shaoxing Panshi Foundation Co., Ltd. was established. He has published 16 academic papers, and participated in the compilation of 'Pipe-jacking and Micro-tunnel Construction Acceptance Code' and 'Trenchless Engineering'.
Chunwen Yan is the deputy director of the Technical Center of China Geological Equipment Group Co., Ltd, the director of the editorial department of ‘Geological Equipment’, the professor-level senior engineer, the expert on government special allowance (engineering technology) of the State Council, the director of the Professional Committee of the China Society of Trenchless Technology, the executive director of the Geological Instrument Branch of China Instrument and Control Society, and the member of China Democratic League.
He systematically researches the new technology of trenchless underground pipeline construction, solves the problem of ‘lock road’ in underground pipeline construction for a long time, and makes fruitful pioneering work for the application, promotion, and development of trenchless technology in China. He has played an important role in the establishment of the Professional Committee of the China Society of Trenchless Technology and has made outstanding contributions to discipline construction and talent training.
Tong Taotao was born in 1989, obtained the B.S. degree in geology from Yangtze University in 2012, and has majored in English translation at the University of Science and Technology of China since 2022.
Le informazioni nella sezione "Su questo libro" possono far riferimento a edizioni diverse di questo titolo.
Visita la pagina della libreria
Standard Business Terms and customer information
I. Standard business terms
§ 1 Basic provisions
(1) The following terms and conditions of business apply for all contracts concluded with us as the supplier (preigu GmbH & Co. KG) via the websites AbeBooks and/or ZVAB. Unless otherwise agreed, the inclusion of your own terms and conditions is explicitly rejected.
(2) A ?consumer' in the sense of the following regulations is every natural person who concludes a legal transaction which, to an overwh...
Instructions for revocation
Right of withdrawal for the sale of goods
Revocation right for consumers
(A ‘consumer' is any natural person who concludes a legal transaction which, to an overwhelming extent, cannot be attributed to either his commercial or independent professional activities.)
Instructions for revocation
Revocation right
You have the right to revoke this contract within 14 days without specifying any reasons.
The revocation period is 14 days with effect from the day,
on which you or a third party nominated by you, which is not the carrier, had taken possession of the products, provided you had ordered one or more products within the scope of a standard order and this/these product/products is/are delivered uniformly;
on which you or a third party nominated by you, which is not the carrier, had taken possession of the last product, provided you had ordered several products within the scope of a standard order and these products are delivered separately;
on which you or a third party nominated by you, which is not the carrier, had taken possession of the last part delivery or the last unit, provided you had ordered a product, which is delivered in several part deliveries or units;
To exercise your right of withdrawal, you must inform us (preigu GmbH & Co. KG, Lengericher Landstr. 19, 49078 Osnabrück, Telephone number: +49 (0) 541 / 580 72 84, E-Mail address: mail@preigu.de) by means of a clear declaration (e.g. a letter sent by post, or an e-mail) of your decision to withdraw from this contract. You can use the attached model withdrawal form for this purpose, which is, however, not mandatory.
You can also exercise your right of withdrawal online by clicking on a button labelled accordingly (such as ‘Withdraw from contract' or similar) on the AbeBooks/ZVAB website. If you use this online function, you will immediately receive a confirmation of receipt on a durable medium (e.g. via email) containing information on the content of the withdrawal notice, as well as the date and time of its receipt.
In order to safeguard the revocation period, it is sufficient that you send the notification about the exercise of the revocation right before the expiry of the revocation period.
Consequences of the revocation
If you revoke this contract, we shall repay all the payments, which we received from you, including the delivery costs (with the exception of additional costs, which arise from that fact that you selected a form of delivery other than the most reasonable standard delivery offered by us), immediately and at the latest within 14 days from the day on which we received the notification about the revocation of this contract from you. We use the same means of payment, which you had originally used during the original transaction, for this repayment unless expressly agreed otherwise with you; you will not be charged any fees owing to this repayment.
We can refuse the repayment until the products are returned to us or until you have furnished evidence that you have sent the products back to us, depending on whichever is earlier.
You must return or transfer the products to us immediately and, in any case, at the latest within 14 days with effect from the day on which you inform us of the revocation of this contract. The deadline is maintained if you send the products before the expiry of the 14 day deadline.
You bear the direct costs for returning the products.
You must pay for any depreciation of the products only if this depreciation can be attributed to any handling with you that was not necessary for checking the condition, features and functionality of the products.
Criteria for exclusion or expiry
The revocation right is not available for contracts
for delivery of products, which are not prefabricated and for whose manufacturing an individual selection or stipulation by the consumer is important or which are clearly tailored to the personal requirements of the consumer;
for delivery of products, which can spoil quickly or whose use-by date would be exceeded quickly;
for delivery of alcoholic drinks, whose price was agreed at the time of concluding the contract, which however can be delivered 30 days after the conclusion of the contract at the earliest and whose current value depends on the fluctuations in the market, on which the entrepreneur has no influence;
for delivery of newspapers, periodicals or magazines with the exception of subscription contracts. The revocation right expires prematurely in case of contracts
for delivery of sealed products, which are not suitable for return for reasons of health protection or hygiene if their seal has been removed after the delivery;
for delivery of products if they have been mixed inseparably with other goods after the delivery, owing to their condition;
for delivery of sound or video recording or computer software in a sealed package if the seal has been removed after the delivery.
Specimen - revocation form
(If you wish to revoke the contract, please fill up this form and send it back to us.)
To preigu GmbH & Co. KG, Lengericher Landstr. 19, 49078 Osnabrück, Email address: mail@preigu.de :
I/we () herewith revoke the contract concluded by me/ us () regarding the purchase of the following products ()/
the provision of the following service ()
Ordered on ()/ received on ()
Name of the consumer(s)
Address of the consumer(s)
Signature of the consumer(s) (only in case of a notification on paper)
Date
(*) Cross out the incorrect option.
| Quantità dell'ordine | Da 60 a 60 giorni lavorativi | Da 60 a 60 giorni lavorativi |
|---|---|---|
| Primo articolo | EUR 70.00 | EUR 70.00 |
I tempi di consegna sono stabiliti dai venditori e variano in base al corriere e al paese. Gli ordini che devono attraversare una dogana possono subire ritardi e spetta agli acquirenti pagare eventuali tariffe o dazi associati. I venditori possono contattarti in merito ad addebiti aggiuntivi dovuti a eventuali maggiorazioni dei costi di spedizione dei tuoi articoli.