Transformer and Reactor Procurement
Lingua: inglese
Editore: Springer International Publishing, Springer Nature Switzerland Sep 2022, 2022
- Rilegato
- Nuovo

Da: BuchWeltWeit Ludwig Meier e.K., Bergisch Gladbach, GermaniaBuchWeltWeit Ludwig Meier e.K.
Venditore AbeBooks dal 11 gennaio 2012
Condizione: Nuovo
EUR 235,39
Quantità: 2 disponibili
Aggiungi al carrelloDescrizione dell’articolo da parte del venditore
This item is printed on demand - it takes 3-4 days longer - Neuware -This Green Book provides those involved in transformer procurement with comprehensive guidance on industry best practice to avoid wrong decisions. Transformers are one of the expensive components in the power system, and also contribute a large proportion of the losses. Transformers also have long lives - more than 40 years in many cases. Making the wrong decisions during the procurement process can have serious and long-lasting consequences. 556 pp. Englisch.
Codice articolo 9783030804688
- Titolo
- Transformer and Reactor Procurement
- Autore
- Gilson M. Bastos
- Editore
- Springer International Publishing, Springer Nature Switzerland Sep 2022
- Anno di pubblicazione
- 2022
- Condizione
- Neu
- Rilegatura
- Buch
- Lingua
- inglese
- ISBN 10
- 3030804682
- ISBN 13
- 9783030804688
- Peso dell'articolo
- 1093 grammi
- Dimensioni
- 241x160x34 mm
- Serie
- Libro 8 di 10: CIGRE Green Books
This Green Book provides those involved in transformer procurement with comprehensive guidance on industry best practice to avoid wrong decisions. Transformers are one of the expensive components in the power system, and also contribute a large proportion of the losses. Transformers also have long lives - more than 40 years in many cases. Making the wrong decisions during the procurement process can have serious and long-lasting consequences.
"Riassunto" può appartenere a un’altra edizione di questo titolo.
Informazioni sull’autore
He has been an active member of CIGRE for many years. He was a member of working groups A2.27 on condition monitoring facilities, A2/B4.28 on HVDC transformers, and A2.37 on transformer reliability. He was also regular member for Brazil on SC A2 between 2014 and 2020.
Tom Breckenridge was born in Greenock, Scotland, in 1955. He studied electrical and electronic engineering at the University of Glasgow between 1973 and 1977. He joined the South of Scotland Electricity Board in 1978, initially as an operational engineer within the distribution field. A move to transmission substation design followed in 1996, where he also assumed the role as principal transformer expert for Scottish Power responsible for specification purchasing and approval of all transformers. Leaving Scottish Power in 2006, he founded TB TCS Ltd through which he provides specialist services in the field of large power transformers on a global basis, primarily operating in the procurement area.
He is a registered European engineer, a fellow of the IET, a UK chartered engineer, and a distinguished member of CIGRE. He was convenor of CIGRE working group A2-36 on transformer procurement. Tom is chairman designate of British Standards PEL/14 committee for power transformers and a member of several IEC maintenance teams under IEC TC14 where he was also IEC convener for the latest version of IEC/IEEE standard 60076-16 for wind turbine transformers.Mike Lamb was born in the USA in 1966. He is currently manager of electric transmission operations engineering in the power delivery group at Dominion Energy in Richmond Virginia, USA. He joined Dominion Energy in 1988 and has held several engineering positions during his career with experience in electric substation and transmission line design and maintenance, distribution system planning and operations, and system operations contingency analysis and transmission open access. Prior to his current position, he was principal engineer in electric transmission operations engineering responsible for the technical oversight of the power transformer procurement process in support of all Dominion Energy’s business units. Mike now leads a team of specialized engineers responsible for major electric transmission equipment specifications; system analysis, technical investigations and root cause analyses, and providing analysis and guidance for emerging technological challenges.
He became a member of CIGRE in 2007. Mike was a member of CIGRE working group A2.36 on transformer procurement and secretary of CIGRE working group A2.48 on shunt reactors, and he is secretary of CIGRE working group A2.58 on installation and pre-commissioning. He has been an active member of CIGRE USNC and was a recipient in 2018 of the Attwood Associate Award.
Tara-Lee MacArthur studied electrical engineering at Queensland University of Technology from 2008 to 2011, graduating with a BEng. She works for an Australian energy utility as a substation design standards engineer and is noted for her work on power transformer specification and design and transformer life management. She is a member of the CIGRE Australia A2 mirror panel (since 2015) and director of the CIGRE Australia Board (since 2020). She has been an active member within CIGRE internationally as secretary of CIGRE Working Group A2.49 between 2016 and 2019 and has been chair of A2 AG.2 on tutorials since 2020. She is a registered professional engineer in Queensland, Australia.
Simon Ryder was born in England in 1973. He studied engineering science at St John’s College, Oxford University, between 1992 and 1996. He worked for GEC Alsthom and later Alstom, between 1997 and 2003, in transformer design, development, and eventually research. He is known for his work on thermal characteristics of transformers and frequency response analysis (FRA). He joined Doble in 2003, initially working mainly on transformer life management. Since 2009, he has worked mainly on transformer procurement, especially supplier qualification and development.
He is a senior member of IEEE-PES, a fellow of IET, and a chartered engineer. He was a member of CIGRE working groups A2.36 on transformer procurement, D1/A2.47 on advances in DGA interpretation, and A2.58 on transformer installation, pre-commissioning, and trial operation, and was convenor of CIGRE working group A2.48 on shunt reactors. He was chairman of CIGRE Committee A2 on power transformers and reactors between 2016 and 2020. He is editor-in-chief of this Green Book.
"Descrizione articolo" può appartenere a un’altra edizione di questo titolo.
BuchWeltWeit Ludwig Meier e.K.
Bergisch Gladbach, Germania
Venditore AbeBooks dal 11 gennaio 2012
Tariffe di spedizione da Germania a U.S.A.
| Articolo | Da 5 a 15 giorni lavorativi | Da 5 a 15 giorni lavorativi |
|---|---|---|
| Primo articolo | EUR 23,00 | EUR 23,00 |
Metodi di pagamento
- Assegno
- Bonifico bancario
- PayPal
Informazioni sull’azienda del venditore
BuchWeltWeit Ludwig Meier e.K.
Germania
Condizioni di vendita
BuchWeltWeit Inh. Ludwig Meier e.K.
Inhaber: Ludwig Meier
De-Gasperi-Str. 8
51469 Bergisch Gladbach
Deutschland
Tel.: +49(0)22028659300
Fax: +49(0)22028659301
E-Mail: info@buchweltweit.de
Registergericht: Amtsgericht Köln
Registernummer: HRA 28253
Umsatzsteuer-Identifikationsnummer: DE815259907
Wir sind zur Teilnahme an einem Streitbeilegungsverfahren vor einer Verbraucherschlichtungsstelle weder verpflichtet noch bereit.
Diritto di recesso
Se sei un consumatore puoi recedere dal contratto in conformità con quanto segue. Per Consumatore si intende qualsiasi persona fisica che agisce per scopi estranei alla propria attività commerciale, imprenditoriale, artigianale o professionale.
Informazioni sul diritto di recesso
Diritto legale di recesso
Hai il diritto di recedere dal presente contratto entro 14 giorni senza fornire alcuna motivazione.
Il periodo di recesso scade dopo 14 giorni dal giorno in cui tu o una terza parte, diversa dal vettore e da te indicata, acquisisce il possesso fisico dell'ultimo bene o dell'ultimo lotto o pezzo.
Per esercitare il diritto di recesso, compila e invia elettronicamente una dichiarazione esplicita sul nostro sito Web, alla voce “I miei acquisti” nella sezione “Mio account”. Ti comunicheremo senza indugio una conferma di ricezione di tale recesso su un supporto durevole (ad es. via e-mail).
Per rispettare il termine di recesso, è sufficiente inviare la comunicazione relativa all'esercizio del diritto di recesso prima della scadenza del periodo di recesso stesso.
Effetti del recesso
In caso di recesso dal presente contratto, ti rimborseremo tutti i pagamenti ricevuti, compresi i costi di spedizione (ad eccezione dei costi supplementari derivanti dalla tua eventuale scelta di un tipo di spedizione diverso dal tipo meno costoso di consegna standard da noi offerto).
Potremo effettuare una detrazione dal rimborso per la perdita di valore dei beni forniti, qualora tale perdita sia il risultato di una manipolazione non necessaria da parte tua.
Eseguiremo il rimborso senza indebito ritardo e non oltre 14 giorni dal giorno in cui saremo informati della tua decisione di recedere dal presente contratto.
Il rimborso sarà effettuato utilizzando lo stesso mezzo di pagamento da te usato per la transazione iniziale, salvo che tu non abbia espressamente concordato altrimenti; in ogni caso, non dovrai sostenere alcun costo quale conseguenza di tale rimborso.
Possiamo trattenere il rimborso finché non avremo ricevuto i beni oppure finché non avrai fornito la prova di averli rispediti, a seconda di quale condizione si verifichi per prima.
Dovrai rispedire i beni o consegnarli a BuchWeltWeit Ludwig Meier e.K., Bergisch Gladbach, Germany, senza indebito ritardo e, in ogni caso, entro 14 giorni dal giorno in cui ci hai comunicato la tua volontà di recedere dal presente contratto. Il termine è rispettato se rispedisci i beni prima della scadenza del periodo di 14 giorni. I costi diretti della restituzione dei beni saranno a tuo carico. Sei responsabile solo della diminuzione del valore dei beni risultante da una manipolazione diversa da quella necessaria per stabilire la natura, le caratteristiche e il funzionamento dei beni stessi.
Eccezioni al diritto di recesso
Il diritto di recesso non si applica a:
- La fornitura di giornali, periodici o riviste ad eccezione dei contratti di abbonamento; e
- La fornitura di contenuto digitale non fornito su un supporto materiale (ad es. su un CD o DVD), se al momento dell'invio dell'ordine hai accettato l'inizio dell'esecuzione e hai riconosciuto che non avresti potuto recedere una volta iniziata l'esecuzione.
Condizioni di spedizione
Der Versand ins Ausland findet IMMER mit DHL statt. Auch nach Österreich verschicken wir nur mit DHL! Daher Standardversand == Luftpost!