9783540097051 - gert networks and the time-oriented evaluation of projects: 172 di ulrich steinhardt, klaus neumann (11 risultati)

- Brossura
Da: Kloof Booksellers & Scientia Verlag, Amsterdam, Paesi BassiKloof Booksellers & Scientia Verlag
Contatta il venditoreVenditore con 4 stelleCondizione: Usato - Buono
EUR 28,95
EUR 30,00 spedizioneSpedito da Paesi Bassi a U.S.A.Quantità: 1 disponibili
Condizione: good. Berlin : Springer, 1979. Paperback. 268 pp. (Lecture notes in economics and mathematical systems, 172). Ticket on cover. Library stamps. - Towards the end of the fifties methods for planning, scheduling,and control of proj ects were developed on the basis that the evolution of a project can be associated with a… special weighted directed graph, called activity network. In this association, the individual activities of the project correspond to the arcs, the so-called proj ect events (beginning or termination of activities) correspond to the nodes, and the durations of the activities correspond to the weights of the respective arcs of the directed graph. 1) Contiguous arcs are assigned to activities which succeed one another immediately. The event corresponding to a node occurs exactly at the time at which all activities which are associated with the arcs leading into the node are terminated. After the occurrence of an event all those activities are be gun which correspond to the arcs emanating from the respective node. This implies especially that the evolution of the project has to be uniquely determined before hand, that every activity and every event are realized exactly once during the exe cution of the project, and that "feedback" (corresponding to cycles in the asso ciated network) is not permitted. Many projects, for example most R&D projects and projects in the area of production planning, do not satisfy the foregoing restrictions. Condition : good copy. ISBN 9783540097051. Keywords : .

- Brossura
Da: Ria Christie Collections, Uxbridge, Regno UnitoRia Christie Collections
Contatta il venditoreVenditore con 5 stelleCondizione: Nuovo
EUR 60,95
EUR 13,96 spedizioneSpedito da Regno Unito a U.S.A.Quantità: Più di 20 disponibili
Condizione: New. In.

- Brossura
Da: Chiron Media, Wallingford, Regno UnitoChiron Media
Contatta il venditoreVenditore con 5 stelleCondizione: Nuovo
EUR 57,29
EUR 18,05 spedizioneSpedito da Regno Unito a U.S.A.Quantità: 10 disponibili
Paperback. Condizione: New.

- Brossura
Da: Books Puddle, New York, NY, U.S.A.Books Puddle
Contatta il venditoreVenditore con 4 stelleCondizione: Nuovo
EUR 77,29
EUR 3,42 spedizioneSpedito in U.S.A.Quantità: 4 disponibili
Condizione: New. pp. 276.

- Brossura
Da: Revaluation Books, Exeter, Regno UnitoRevaluation Books
Contatta il venditoreVenditore con 5 stelleCondizione: Nuovo
EUR 78,43
EUR 11,65 spedizioneSpedito da Regno Unito a U.S.A.Quantità: 2 disponibili
Paperback. Condizione: Brand New. 1st edition. 276 pages. 9.61x6.69x0.63 inches. In Stock.

- Brossura
Da: moluna, Greven, Germaniamoluna
Contatta il venditoreVenditore con 5 stelleCondizione: Nuovo
EUR 48,37
EUR 48,99 spedizioneSpedito da Germania a U.S.A.Quantità: Più di 20 disponibili
Condizione: New.

- Brossura
Da: AHA-BUCH GmbH, Einbeck, GermaniaAHA-BUCH GmbH
Contatta il venditoreVenditore con 5 stelleCondizione: Nuovo
EUR 53,49
EUR 62,41 spedizioneSpedito da Germania a U.S.A.Quantità: 1 disponibili
Taschenbuch. Condizione: Neu. Druck auf Anfrage Neuware - Printed after ordering - Towards the end of the fifties methods for planning, scheduling,and control of proj ects were developed on the basis that the evolution of a project can be associated with a special weighted directed graph, called activity network. In this associa…tion, the individual activities of the project correspond to the arcs, the so-called proj ect events (beginning or termination of activities) correspond to the nodes, and the durations of the activities correspond to the weights of the respective arcs of the directed graph. 1) Contiguous arcs are assigned to activities which succeed one another immediately. The event corresponding to a node occurs exactly at the time at which all activities which are associated with the arcs leading into the node are terminated. After the occurrence of an event all those activities are be gun which correspond to the arcs emanating from the respective node. This implies especially that the evolution of the project has to be uniquely determined before hand, that every activity and every event are realized exactly once during the exe cution of the project, and that 'feedback' (corresponding to cycles in the asso ciated network) is not permitted. Many projects, for example most R&D projects and projects in the area of production p 1 anni ng, do not sa ti sfy the foregoi ng res tri cti ons.

- Brossura
- Print on Demand
Da: BuchWeltWeit Ludwig Meier e.K., Bergisch Gladbach, GermaniaBuchWeltWeit Ludwig Meier e.K.
Contatta il venditoreVenditore con 5 stelleCondizione: Nuovo
EUR 53,49
EUR 23,00 spedizioneSpedito da Germania a U.S.A.Quantità: 2 disponibili
Taschenbuch. Condizione: Neu. This item is printed on demand - it takes 3-4 days longer - Neuware -Towards the end of the fifties methods for planning, scheduling,and control of proj ects were developed on the basis that the evolution of a project can be associated with a special weighted directed graph, called activity network.… In this association, the individual activities of the project correspond to the arcs, the so-called proj ect events (beginning or termination of activities) correspond to the nodes, and the durations of the activities correspond to the weights of the respective arcs of the directed graph. 1) Contiguous arcs are assigned to activities which succeed one another immediately. The event corresponding to a node occurs exactly at the time at which all activities which are associated with the arcs leading into the node are terminated. After the occurrence of an event all those activities are be gun which correspond to the arcs emanating from the respective node. This implies especially that the evolution of the project has to be uniquely determined before hand, that every activity and every event are realized exactly once during the exe cution of the project, and that 'feedback' (corresponding to cycles in the asso ciated network) is not permitted. Many projects, for example most R&D projects and projects in the area of production p 1 anni ng, do not sa ti sfy the foregoi ng res tri cti ons. 276 pp. Englisch.

- Brossura
- Print on Demand
Da: Majestic Books, Hounslow, Regno UnitoMajestic Books
Contatta il venditoreVenditore con 4 stelleCondizione: Nuovo
EUR 76,52
EUR 7,57 spedizioneSpedito da Regno Unito a U.S.A.Quantità: 4 disponibili
Condizione: New. Print on Demand pp. 276 135 Figures, 67:B&W 6.69 x 9.61 in or 244 x 170 mm (Pinched Crown) Perfect Bound on White w/Gloss Lam.

- Brossura
- Print on Demand
Da: Biblios, frankfurt am main, HESSE, GermaniaBiblios
Contatta il venditoreVenditore con 4 stelleCondizione: Nuovo
EUR 79,13
EUR 9,95 spedizioneSpedito da Germania a U.S.A.Quantità: 4 disponibili
Condizione: New. PRINT ON DEMAND pp. 276.

- Brossura
- Print on Demand
Da: buchversandmimpf2000, Emtmannsberg, BAYE, Germaniabuchversandmimpf2000
Contatta il venditoreVenditore con 5 stelleCondizione: Nuovo
EUR 53,49
EUR 60,00 spedizioneSpedito da Germania a U.S.A.Quantità: 1 disponibili
Taschenbuch. Condizione: Neu. This item is printed on demand - Print on Demand Titel. Neuware -Towards the end of the fifties methods for planning, scheduling,and control of proj ects were developed on the basis that the evolution of a project can be associated with a special weighted directed graph, called activity network. In…this association, the individual activities of the project correspond to the arcs, the so-called proj ect events (beginning or termination of activities) correspond to the nodes, and the durations of the activities correspond to the weights of the respective arcs of the directed graph. 1) Contiguous arcs are assigned to activities which succeed one another immediately. The event corresponding to a node occurs exactly at the time at which all activities which are associated with the arcs leading into the node are terminated. After the occurrence of an event all those activities are be gun which correspond to the arcs emanating from the respective node. This implies especially that the evolution of the project has to be uniquely determined before hand, that every activity and every event are realized exactly once during the exe cution of the project, and that 'feedback' (corresponding to cycles in the asso ciated network) is not permitted. Many projects, for example most R&D projects and projects in the area of production p 1 anni ng, do not sa ti sfy the foregoi ng res tri cti ons.Springer-Verlag KG, Sachsenplatz 4-6, 1201 Wien 276 pp. Englisch.