Lingua: Inglese
Editore: Lap Lambert Academic Publishing, 2012
ISBN 10: 3846586439 ISBN 13: 9783846586433
Da: Revaluation Books, Exeter, Regno Unito
EUR 99,84
Quantità: 1 disponibili
Aggiungi al carrelloPaperback. Condizione: Brand New. 80 pages. 8.58x5.91x0.32 inches. In Stock.
Lingua: Inglese
Editore: LAP Lambert Academic Publishing, 2012
ISBN 10: 3846586439 ISBN 13: 9783846586433
Da: preigu, Osnabrück, Germania
EUR 43,35
Quantità: 5 disponibili
Aggiungi al carrelloTaschenbuch. Condizione: Neu. Quick Changeover Revolution in Critical Processing Lines | The Standard Model for SMED | Balamurali Thamatapu | Taschenbuch | Englisch | LAP Lambert Academic Publishing | EAN 9783846586433 | Verantwortliche Person für die EU: preigu GmbH & Co. KG, Lengericher Landstr. 19, 49078 Osnabrück, mail[at]preigu[dot]de | Anbieter: preigu.
Lingua: Inglese
Editore: LAP LAMBERT Academic Publishing, 2012
ISBN 10: 3846586439 ISBN 13: 9783846586433
Da: Mispah books, Redhill, SURRE, Regno Unito
EUR 174,53
Quantità: 1 disponibili
Aggiungi al carrelloPaperback. Condizione: New. NEW. SHIPS FROM MULTIPLE LOCATIONS. book.
Lingua: Inglese
Editore: LAP LAMBERT Academic Publishing, 2012
ISBN 10: 3846586439 ISBN 13: 9783846586433
Da: moluna, Greven, Germania
EUR 41,67
Quantità: Più di 20 disponibili
Aggiungi al carrelloKartoniert / Broschiert. Condizione: New. Dieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt. Autor/Autorin: Thamatapu BalamuraliMr. Balamurali Thamatapu has obtained his M.Sc(Engg) in Engineering and Manufacturing Management in 2011. Since then he worked in different projects in the field of Lean Manufacturing. One of his project elected a.
Lingua: Inglese
Editore: LAP Lambert Academic Publishing, 2012
ISBN 10: 3846586439 ISBN 13: 9783846586433
Da: AHA-BUCH GmbH, Einbeck, Germania
EUR 49,59
Quantità: 2 disponibili
Aggiungi al carrelloTaschenbuch. Condizione: Neu. nach der Bestellung gedruckt Neuware - Printed after ordering - To achieve manufacturing excellence , Companies must exploit all available Decision support systems to supplement production planning for greater productivity. Since levels of productivity and pro tability should be the major indices for sustainability in today s dynamic and competitive environment, techniques like SMED offer a great potential to reduce product CT and so aid competitiveness. To make such improvements, industrial engineering tools like time study, Pareto charts, cause and effect analysis, cost - bene t techniques, etc. can be used to identify required changes, eliminations and externalizations of set up activities and then more re ned set-ups can be developed to save production time. The following points were concluded from the project: 1.Flexible man power technique plays major role in operator involvement during Changeover period which builds machine ownership culture. 2.Cross functional team working helps in proper data collection, analysis and to find low cost optimum solution. 3.In case of Rush orders, Set up time should be minimum since it is considered one among 7 big losses.