9786139828319 - early production system (eps) barge movement: installation at olero creek production platform, benin river area di owhojeta, sylvester efe (8 risultati)

Lingua: Inglese
- Brossura
Da: Books Puddle, New York, NY, U.S.A.Books Puddle
Contatta il venditoreVenditore con 4 stelleCondizione: Nuovo
EUR 50,74
EUR 3,44 spedizioneSpedito in U.S.A.Quantità: 4 disponibili
Condizione: New.

- Brossura
Da: preigu, Osnabrück, Germaniapreigu
Contatta il venditoreVenditore con 5 stelleCondizione: Nuovo
EUR 22,50
EUR 70,00 spedizioneSpedito da Germania a U.S.A.Quantità: 5 disponibili
Taschenbuch. Condizione: Neu. Early Production System (EPS) Barge Movement | Installation at Olero Creek Production Platform, Benin River Area | Sylvester Efe Owhojeta | Taschenbuch | 56 S. | Englisch | 2018 | LAP LAMBERT Academic Publishing | EAN 9786139828319 | Verantwortliche Person für die EU: BoD - Books on Demand, In de Ta…rpen 42, 22848 Norderstedt, info[at]bod[dot]de | Anbieter: preigu.

- Brossura
- Print on Demand
Da: BuchWeltWeit Ludwig Meier e.K., Bergisch Gladbach, GermaniaBuchWeltWeit Ludwig Meier e.K.
Contatta il venditoreVenditore con 5 stelleCondizione: Nuovo
EUR 23,90
EUR 23,00 spedizioneSpedito da Germania a U.S.A.Quantità: 2 disponibili
Taschenbuch. Condizione: Neu. This item is printed on demand - it takes 3-4 days longer - Neuware -EPS barge movement and installation at Olero was initiated to continue the flow and production of oil at the platform because of the damage to the existing production facilities at the area during the 2003 crisis in the Niger Delta… region of Nigeria. The EPS is a concept designed to continue the flow and production of oil pending completion of the damaged facilities. The movement of barge was preceded by channel check, movement was designed to avoid all observed obstacles and navigational hazards. The datum was based on the 1m mark at GB-3 location, Olero Creek. Prior to the pre-survey of EPS barge movement, dredging of the project area at Olero Creek production platform slot and access was carried out because of the high build-up of siltation in the area. The pre-survey included the topographic and bathymetric appraisal of the entire flow station area. The information was used to reappraise the setting out of the layout before sand dropping and to design the sand padding to accommodate the overlap including loses. Positioning of the barge was tied to the tidal situation, while the movement was synchronized with tidal motion to avert the possibility of being dragged back by tide. 56 pp. Englisch.

- Brossura
- Print on Demand
Da: AHA-BUCH GmbH, Einbeck, GermaniaAHA-BUCH GmbH
Contatta il venditoreVenditore con 5 stelleCondizione: Nuovo
EUR 26,98
EUR 30,50 spedizioneSpedito da Germania a U.S.A.Quantità: 1 disponibili
Taschenbuch. Condizione: Neu. nach der Bestellung gedruckt Neuware - Printed after ordering - EPS barge movement and installation at Olero was initiated to continue the flow and production of oil at the platform because of the damage to the existing production facilities at the area during the 2003 crisis in the Niger Delta regi…on of Nigeria. The EPS is a concept designed to continue the flow and production of oil pending completion of the damaged facilities. The movement of barge was preceded by channel check, movement was designed to avoid all observed obstacles and navigational hazards. The datum was based on the 1m mark at GB-3 location, Olero Creek. Prior to the pre-survey of EPS barge movement, dredging of the project area at Olero Creek production platform slot and access was carried out because of the high build-up of siltation in the area. The pre-survey included the topographic and bathymetric appraisal of the entire flow station area. The information was used to reappraise the setting out of the layout before sand dropping and to design the sand padding to accommodate the overlap including loses. Positioning of the barge was tied to the tidal situation, while the movement was synchronized with tidal motion to avert the possibility of being dragged back by tide.

- Brossura
- Print on Demand
Da: moluna, Greven, Germaniamoluna
Contatta il venditoreVenditore con 5 stelleCondizione: Nuovo
EUR 22,32
EUR 48,99 spedizioneSpedito da Germania a U.S.A.Quantità: Più di 20 disponibili
Condizione: New. Dieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt. Autor/Autorin: Owhojeta Sylvester EfeSylvester Efe Owhojeta is a Registered Surveyor, Member of the Nigerian Institution of Surveyors and Fellow of the Institute of Management Consultants. Graduated with B.Sc. degree… in Surveying, Geodesy and Photo.

Lingua: Inglese
- Brossura
- Print on Demand
Da: Majestic Books, Hounslow, Regno UnitoMajestic Books
Contatta il venditoreVenditore con 4 stelleCondizione: Nuovo
EUR 47,95
EUR 7,56 spedizioneSpedito da Regno Unito a U.S.A.Quantità: 4 disponibili
Condizione: New. Print on Demand.

Lingua: Inglese
- Brossura
- Print on Demand
Da: Biblios, frankfurt am main, HESSE, GermaniaBiblios
Contatta il venditoreVenditore con 4 stelleCondizione: Nuovo
EUR 47,17
EUR 9,95 spedizioneSpedito da Germania a U.S.A.Quantità: 4 disponibili
Condizione: New. PRINT ON DEMAND.

- Brossura
- Print on Demand
Da: buchversandmimpf2000, Emtmannsberg, BAYE, Germaniabuchversandmimpf2000
Contatta il venditoreVenditore con 5 stelleCondizione: Nuovo
EUR 23,90
EUR 60,00 spedizioneSpedito da Germania a U.S.A.Quantità: 1 disponibili
Taschenbuch. Condizione: Neu. This item is printed on demand - Print on Demand Titel. Neuware -EPS barge movement and installation at Olero was initiated to continue the flow and production of oil at the platform because of the damage to the existing production facilities at the area during the 2003 crisis in the Niger Delta reg…ion of Nigeria. The EPS is a concept designed to continue the flow and production of oil pending completion of the damaged facilities. The movement of barge was preceded by channel check, movement was designed to avoid all observed obstacles and navigational hazards. The datum was based on the 1m mark at GB-3 location, Olero Creek. Prior to the pre-survey of EPS barge movement, dredging of the project area at Olero Creek production platform slot and access was carried out because of the high build-up of siltation in the area. The pre-survey included the topographic and bathymetric appraisal of the entire flow station area. The information was used to reappraise the setting out of the layout before sand dropping and to design the sand padding to accommodate the overlap including loses. Positioning of the barge was tied to the tidal situation, while the movement was synchronized with tidal motion to avert the possibility of being dragged back by tide.VDM Verlag, Dudweiler Landstraße 99, 66123 Saarbrücken 56 pp. Englisch.