Lingua: Inglese
Editore: LAP LAMBERT Academic Publishing, 2023
ISBN 10: 6206784142 ISBN 13: 9786206784142
Da: Books Puddle, New York, NY, U.S.A.
Condizione: New.
Lingua: Inglese
Editore: LAP LAMBERT Academic Publishing, 2023
ISBN 10: 6206784142 ISBN 13: 9786206784142
Da: Majestic Books, Hounslow, Regno Unito
EUR 77,37
Quantità: 4 disponibili
Aggiungi al carrelloCondizione: New. Print on Demand.
Lingua: Inglese
Editore: LAP LAMBERT Academic Publishing Sep 2023, 2023
ISBN 10: 6206784142 ISBN 13: 9786206784142
Da: BuchWeltWeit Ludwig Meier e.K., Bergisch Gladbach, Germania
EUR 60,90
Quantità: 2 disponibili
Aggiungi al carrelloTaschenbuch. Condizione: Neu. This item is printed on demand - it takes 3-4 days longer - Neuware -The main objective of this book is to provide basic explanations about drawing a project-based network diagrams and to estimate the project completion duration and cost in particular. Thus, this book has been well structured to explore the bases and basics of network analyses in relation to activity time and cost. In Chapter 1, the introduction for drawing a project network is explained with the limitations and rules applied for. Chapter 2 explains the determination of activity and project based time (duration), respective probability and floating possibility; and Chapter 3 consists of critical path analyses. Considering the activity duration and cost, the book introduces three conceptualised perspectives for a project in the rest of the chapters (4, 5 and 6), respectively: Normal duration and normal cost, Minimum duration and its associated cost, and Minimum Cost and its associated duration; and this book counts the credits on the conceptualisation. 108 pp. Englisch.
Lingua: Inglese
Editore: LAP LAMBERT Academic Publishing, 2023
ISBN 10: 6206784142 ISBN 13: 9786206784142
Da: Biblios, Frankfurt am main, HESSE, Germania
EUR 78,06
Quantità: 4 disponibili
Aggiungi al carrelloCondizione: New. PRINT ON DEMAND.
Lingua: Inglese
Editore: LAP Lambert Academic Publishing, 2023
ISBN 10: 6206784142 ISBN 13: 9786206784142
Da: moluna, Greven, Germania
EUR 49,92
Quantità: Più di 20 disponibili
Aggiungi al carrelloCondizione: New. Dieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt. The main objective of this book is to provide basic explanations about drawing a project-based network diagrams and to estimate the project completion duration and cost in particular. Thus, this book has been well structured to explore the bases and basics .
Lingua: Inglese
Editore: LAP LAMBERT Academic Publishing Sep 2023, 2023
ISBN 10: 6206784142 ISBN 13: 9786206784142
Da: buchversandmimpf2000, Emtmannsberg, BAYE, Germania
EUR 60,90
Quantità: 1 disponibili
Aggiungi al carrelloTaschenbuch. Condizione: Neu. This item is printed on demand - Print on Demand Titel. Neuware -The main objective of this book is to provide basic explanations about drawing a project-based network diagrams and to estimate the project completion duration and cost in particular. Thus, this book has been well structured to explore the bases and basics of network analyses in relation to activity time and cost. In Chapter 1, the introduction for drawing a project network is explained with the limitations and rules applied for. Chapter 2 explains the determination of activity and project based time (duration), respective probability and floating possibility; and Chapter 3 consists of critical path analyses. Considering the activity duration and cost, the book introduces three conceptualised perspectives for a project in the rest of the chapters (4, 5 and 6), respectively: Normal duration and normal cost, Minimum duration and its associated cost, and Minimum Cost and its associated duration; and this book counts the credits on the conceptualisation.VDM Verlag, Dudweiler Landstraße 99, 66123 Saarbrücken 108 pp. Englisch.
Lingua: Inglese
Editore: LAP LAMBERT Academic Publishing, 2023
ISBN 10: 6206784142 ISBN 13: 9786206784142
Da: AHA-BUCH GmbH, Einbeck, Germania
EUR 61,63
Quantità: 1 disponibili
Aggiungi al carrelloTaschenbuch. Condizione: Neu. nach der Bestellung gedruckt Neuware - Printed after ordering - The main objective of this book is to provide basic explanations about drawing a project-based network diagrams and to estimate the project completion duration and cost in particular. Thus, this book has been well structured to explore the bases and basics of network analyses in relation to activity time and cost. In Chapter 1, the introduction for drawing a project network is explained with the limitations and rules applied for. Chapter 2 explains the determination of activity and project based time (duration), respective probability and floating possibility; and Chapter 3 consists of critical path analyses. Considering the activity duration and cost, the book introduces three conceptualised perspectives for a project in the rest of the chapters (4, 5 and 6), respectively: Normal duration and normal cost, Minimum duration and its associated cost, and Minimum Cost and its associated duration; and this book counts the credits on the conceptualisation.