Isbn: 9786207447169 - monitoring and control of smart substations (8 risultati)

Perfeziona la tua ricerca

  • Libri (8)

  • Nuovo (8)

a

Fascia di prezzo personalizzata (EUR)

a

  • Lingua: Inglese

    Editore: LAP LAMBERT Academic Publishing, 2023

    6207447166 / 9786207447169

    • Brossura

    Da: Books Puddle, Woodside, NY, U.S.A.Books Puddle

    Venditore con 4 stelle
    Contatta il venditore

    Condizione: Nuovo

    EUR 59,37

    EUR 3,56 spedizione 
    Spedito in U.S.A.

    Quantità: 4 disponibili

    Condizione: New.

  • Lingua: Inglese

    Editore: LAP LAMBERT Academic Publishing, 2023

    6207447166 / 9786207447169

    • Brossura

    Da: Mispah books, Redhill, SURRE, Regno UnitoMispah books

    Venditore con 4 stelle
    Contatta il venditore

    Condizione: Nuovo

    EUR 111,97

    EUR 29,54 spedizione 
    Spedito da Regno Unito a U.S.A.

    Quantità: 1 disponibile

    paperback. Condizione: New. NEW. SHIPS FROM MULTIPLE LOCATIONS. book.

  • Lingua: Inglese

    Editore: LAP LAMBERT Academic Publishing, 2023

    6207447166 / 9786207447169

    • Brossura
    • Print on Demand

    Da: Majestic Books, Hounslow, Regno UnitoMajestic Books

    Venditore con 4 stelle
    Contatta il venditore

    Condizione: Nuovo

    EUR 58,55

    EUR 7,68 spedizione 
    Spedito da Regno Unito a U.S.A.

    Quantità: 4 disponibili

    Condizione: New. Print on Demand.

  • Lingua: Inglese

    Editore: LAP LAMBERT Academic Publishing Nov 2023, 2023

    6207447166 / 9786207447169

    • Brossura
    • Print on Demand

    Da: BuchWeltWeit Ludwig Meier e.K., Bergisch Gladbach, GermaniaBuchWeltWeit Ludwig Meier e.K.

    Venditore con 5 stelle
    Contatta il venditore

    Condizione: Nuovo

    EUR 43,90

    EUR 23,00 spedizione 
    Spedito da Germania a U.S.A.

    Quantità: 2 disponibili

    Taschenbuch. Condizione: Neu. This item is printed on demand - it takes 3-4 days longer - Neuware 60 pp. Englisch.

  • Lingua: Inglese

    Editore: LAP LAMBERT Academic Publishing, 2023

    6207447166 / 9786207447169

    • Brossura
    • Print on Demand

    Da: Biblios, frankfurt am main, HESSE, GermaniaBiblios

    Venditore con 4 stelle
    Contatta il venditore

    Condizione: Nuovo

    EUR 57,79

    EUR 9,95 spedizione 
    Spedito da Germania a U.S.A.

    Quantità: 4 disponibili

    Condizione: New. PRINT ON DEMAND.

  • Lingua: Inglese

    Editore: LAP LAMBERT Academic Publishing, 2023

    6207447166 / 9786207447169

    • Brossura
    • Print on Demand

    Da: AHA-BUCH GmbH, Einbeck, GermaniaAHA-BUCH GmbH

    Venditore con 5 stelle
    Contatta il venditore

    Condizione: Nuovo

    EUR 49,63

    EUR 35,00 spedizione 
    Spedito da Germania a U.S.A.

    Quantità: 1 disponibile

    Taschenbuch. Condizione: Neu. nach der Bestellung gedruckt Neuware - Printed after ordering - As the complexity of the distribution center has grown, substation computerization has become a requirement for any local utility to increase its reliability and enhance the effectiveness of electricity supplied. The proposed project manages the substation with the assistance of the required components to ensure that it can be remotely controlled and supervised to ensure the intensity of intrusion is decreased. The microcontroller can combine and undertake a role as dictated by the sensors implemented at the substation. Electrical parameters including current, voltage, and the rated value might be consistently compared to prevent future damages of the power delivery system and power transformer from bursting due to overload, short circuit deprivation, overvoltage and outpourings. Under such situations, different steps are carried out in order to avoid it. which detects it, and closes down through the use of the control area, and the electrical switch is rendered useless. This causes staff at the substation to really be lowered and saves a lot of time. The data gathering and practical efficiency of the sub-station could probably rise in this manner.…

  • Lingua: Inglese

    Editore: LAP Lambert Academic Publishing, 2023

    6207447166 / 9786207447169

    • Brossura
    • Print on Demand

    Da: moluna, Greven, Germaniamoluna

    Venditore con 5 stelle
    Contatta il venditore

    Condizione: Nuovo

    EUR 37,23

    EUR 48,99 spedizione 
    Spedito da Germania a U.S.A.

    Quantità: Più di 20 disponibili

    Condizione: New. Dieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt. As the complexity of the distribution center has grown, substation computerization has become a requirement for any local utility to increase its reliability and enhance the effectiveness of electricity supplied. The proposed project manages the substation .…

  • Lingua: Inglese

    Editore: LAP LAMBERT Academic Publishing Nov 2023, 2023

    6207447166 / 9786207447169

    • Brossura
    • Print on Demand

    Da: buchversandmimpf2000, Emtmannsberg, BAYE, Germaniabuchversandmimpf2000

    Venditore con 5 stelle
    Contatta il venditore

    Condizione: Nuovo

    EUR 43,90

    EUR 60,00 spedizione 
    Spedito da Germania a U.S.A.

    Quantità: 1 disponibile

    Taschenbuch. Condizione: Neu. This item is printed on demand - Print on Demand Titel. Neuware -As the complexity of the distribution center has grown, substation computerization has become a requirement for any local utility to increase its reliability and enhance the effectiveness of electricity supplied. The proposed project manages the substation with the assistance of the required components to ensure that it can be remotely controlled and supervised to ensure the intensity of intrusion is decreased. The microcontroller can combine and undertake a role as dictated by the sensors implemented at the substation. Electrical parameters including current, voltage, and the rated value might be consistently compared to prevent future damages of the power delivery system and power transformer from bursting due to overload, short circuit deprivation, overvoltage and outpourings. Under such situations, different steps are carried out in order to avoid it. which detects it, and closes down through the use of the control area, and the electrical switch is rendered useless. This causes staff at the substation to really be lowered and saves a lot of time. The data gathering and practical efficiency of the sub-station could probably rise in this manner.VDM Verlag, Dudweiler Landstraße 99, 66123 Saarbrücken 60 pp. Englisch.…