The present simulation method has been developed at the Institute for Power Technology and Steam Generation (IVD) of the University of Stuttgart. It is being successfully employed in the analysis of processes involving large state changes such as start-ups, shut downs, malfunctions and failures in steam power generating unit, which is a large scale system consisting of several subsystems with distributed parameters, to which the steam generator also belongs. This research resulted from the increasing use of the once-through boiler, while simultaneously raising the steam parameters into the region of the supercritical state, using sliding pressure operation, combined processes with gas and steam turbines etc. The objective of this system simulation is to reduce losses of heat and condensate and to minimise unavoidable thermal stresses. The project was financed between 1979 and 1983 by the German Research Society (DFG) as part of the special research section Nr. 157 'Thermal power plants'. The Westfalen Power Company Inc. (VEW) sponsored the start-up code 'DYSTAR'. We would like to express our thanks for this support. The following members of the IVD were involved in this research project: Dr.-Ing. J. Kley Dipl.-Ing. G. Riemenschneider Dr.-Ing. A. Rolf Dipl.-Ing. U. Mayer Dipl.-lng. E. Dr.-lng. M. Klug Pfleger Dr.-Ing. G. Berndt Presently it is intended to use this non-linear, time-variant model of a power generating unit with a variable process and system struc ture as the basis for simple code versions, which one can employ e.g.
Le informazioni nella sezione "Riassunto" possono far riferimento a edizioni diverse di questo titolo.
The present simulation method has been developed at the Institute for Power Technology and Steam Generation (IVD) of the University of Stuttgart. It is being successfully employed in the analysis of processes involving large state changes such as start-ups, shut downs, malfunctions and failures in steam power generating unit, which is a large scale system consisting of several subsystems with distributed parameters, to which the steam generator also belongs. This research resulted from the increasing use of the once-through boiler, while simultaneously raising the steam parameters into the region of the supercritical state, using sliding pressure operation, combined processes with gas and steam turbines etc. The objective of this system simulation is to reduce losses of heat and condensate and to minimise unavoidable thermal stresses. The project was financed between 1979 and 1983 by the German Research Society (DFG) as part of the special research section Nr. 157 'Thermal power plants'. The Westfalen Power Company Inc. (VEW) sponsored the start-up code 'DYSTAR'. We would like to express our thanks for this support. The following members of the IVD were involved in this research project: Dr.-Ing. J. Kley Dipl.-Ing. G. Riemenschneider Dr.-Ing. A. Rolf Dipl.-Ing. U. Mayer Dipl.-lng. E. Dr.-lng. M. Klug Pfleger Dr.-Ing. G. Berndt Presently it is intended to use this non-linear, time-variant model of a power generating unit with a variable process and system struc ture as the basis for simple code versions, which one can employ e.g.
Le informazioni nella sezione "Su questo libro" possono far riferimento a edizioni diverse di questo titolo.
Da: GreatBookPrices, Columbia, MD, U.S.A.
Condizione: As New. Unread book in perfect condition. Codice articolo 18664428
Quantità: 15 disponibili
Da: BuchWeltWeit Ludwig Meier e.K., Bergisch Gladbach, Germania
Taschenbuch. Condizione: Neu. This item is printed on demand - it takes 3-4 days longer - Neuware -The present simulation method has been developed at the Institute for Power Technology and Steam Generation (IVD) of the University of Stuttgart. It is being successfully employed in the analysis of processes involving large state changes such as start-ups, shut downs, malfunctions and failures in steam power generating unit, which is a large scale system consisting of several subsystems with distributed parameters, to which the steam generator also belongs. This research resulted from the increasing use of the once-through boiler, while simultaneously raising the steam parameters into the region of the supercritical state, using sliding pressure operation, combined processes with gas and steam turbines etc. The objective of this system simulation is to reduce losses of heat and condensate and to minimise unavoidable thermal stresses. The project was financed between 1979 and 1983 by the German Research Society (DFG) as part of the special research section Nr. 157 'Thermal power plants'. The Westfalen Power Company Inc. (VEW) sponsored the start-up code 'DYSTAR'. We would like to express our thanks for this support. The following members of the IVD were involved in this research project: Dr.-Ing. J. Kley Dipl.-Ing. G. Riemenschneider Dr.-Ing. A. Rolf Dipl.-Ing. U. Mayer Dipl.-lng. E. Dr.-lng. M. Klug Pfleger Dr.-Ing. G. Berndt Presently it is intended to use this non-linear, time-variant model of a power generating unit with a variable process and system struc ture as the basis for simple code versions, which one can employ e.g. 128 pp. Englisch. Codice articolo 9783540180531
Quantità: 1 disponibili
Da: GreatBookPrices, Columbia, MD, U.S.A.
Condizione: New. Codice articolo 18664428-n
Quantità: 15 disponibili
Da: GreatBookPricesUK, Woodford Green, Regno Unito
Condizione: As New. Unread book in perfect condition. Codice articolo 18664428
Quantità: Più di 20 disponibili
Da: GreatBookPricesUK, Woodford Green, Regno Unito
Condizione: New. Codice articolo 18664428-n
Quantità: Più di 20 disponibili
Da: moluna, Greven, Germania
Condizione: New. The present simulation method has been developed at the Institute for Power Technology and Steam Generation (IVD) of the University of Stuttgart. It is being successfully employed in the analysis of processes involving large state changes such as start-ups,. Codice articolo 4883641
Quantità: 1 disponibili
Da: AHA-BUCH GmbH, Einbeck, Germania
Taschenbuch. Condizione: Neu. Druck auf Anfrage Neuware - Printed after ordering - The present simulation method has been developed at the Institute for Power Technology and Steam Generation (IVD) of the University of Stuttgart. It is being successfully employed in the analysis of processes involving large state changes such as start-ups, shut downs, malfunctions and failures in steam power generating unit, which is a large scale system consisting of several subsystems with distributed parameters, to which the steam generator also belongs. This research resulted from the increasing use of the once-through boiler, while simultaneously raising the steam parameters into the region of the supercritical state, using sliding pressure operation, combined processes with gas and steam turbines etc. The objective of this system simulation is to reduce losses of heat and condensate and to minimise unavoidable thermal stresses. The project was financed between 1979 and 1983 by the German Research Society (DFG) as part of the special research section Nr. 157 'Thermal power plants'. The Westfalen Power Company Inc. (VEW) sponsored the start-up code 'DYSTAR'. We would like to express our thanks for this support. The following members of the IVD were involved in this research project: Dr.-Ing. J. Kley Dipl.-Ing. G. Riemenschneider Dr.-Ing. A. Rolf Dipl.-Ing. U. Mayer Dipl.-lng. E. Dr.-lng. M. Klug Pfleger Dr.-Ing. G. Berndt Presently it is intended to use this non-linear, time-variant model of a power generating unit with a variable process and system struc ture as the basis for simple code versions, which one can employ e.g. Codice articolo 9783540180531
Quantità: 1 disponibili
Da: Books Puddle, Woodside, NY, U.S.A.
Condizione: New. pp. 128. Codice articolo 2648036571
Quantità: 4 disponibili
Da: buchversandmimpf2000, Emtmannsberg, BAYE, Germania
Taschenbuch. Condizione: Neu. This item is printed on demand - Print on Demand Titel. Neuware -The present simulation method has been developed at the Institute for Power Technology and Steam Generation (IVD) of the University of Stuttgart. It is being successfully employed in the analysis of processes involving large state changes such as start-ups, shut downs, malfunctions and failures in steam power generating unit, which is a large scale system consisting of several subsystems with distributed parameters, to which the steam generator also belongs. This research resulted from the increasing use of the once-through boiler, while simultaneously raising the steam parameters into the region of the supercritical state, using sliding pressure operation, combined processes with gas and steam turbines etc. The objective of this system simulation is to reduce losses of heat and condensate and to minimise unavoidable thermal stresses. The project was financed between 1979 and 1983 by the German Research Society (DFG) as part of the special research section Nr. 157 'Thermal power plants'. The Westfalen Power Company Inc. (VEW) sponsored the start-up code 'DYSTAR'. We would like to express our thanks for this support. The following members of the IVD were involved in this research project: Dr.-Ing. J. Kley Dipl.-Ing. G. Riemenschneider Dr.-Ing. A. Rolf Dipl.-Ing. U. Mayer Dipl.-lng. E. Dr.-lng. M. Klug Pfleger Dr.-Ing. G. Berndt Presently it is intended to use this non-linear, time-variant model of a power generating unit with a variable process and system struc ture as the basis for simple code versions, which one can employ e.g.Springer-Verlag KG, Sachsenplatz 4-6, 1201 Wien 128 pp. Englisch. Codice articolo 9783540180531
Quantità: 1 disponibili
Da: Revaluation Books, Exeter, Regno Unito
Paperback. Condizione: Brand New. 119 pages. 9.61x6.69x0.29 inches. In Stock. Codice articolo x-3540180532
Quantità: 2 disponibili