Within a project human and non-human resources are pulled together in a tempo raray organization in order to achieve a predefined goal (d. [20], p. 187). That is, in contrast to manufacturing management, project management is directed to an end. One major function of project management is the scheduling of the project. Project scheduling is the time-based arrangement of the activities comprising the project subject to precedence-, time-and resource-constraints (d. [4], p. 170). In the 1950's the standard methods MPM (Metra Potential Method) and CPM (Cri tical Path Method) were developed. Given deterministic durations and precedence constraints the minimum project length, time windows for the start times and critical paths can be calculated. At the same time another group of researchers developed the Program Evaluation and Review Technique (PERT) (d. [19], [73] and [90]). In contrast to MPM and CPM, random variables describe the activity durations. Based on the optimistic, most likely and pessimistic estimations of the activity durations an assumed Beta distribution is derived in order to calculate the distribution of the project duration, the critical events, the distribution of earliest and latest occurence of an event, the distribution of the slack of the events and the probability of exceeding a date. By the time the estimates of the distributions have been improved (d. e.g. [52] and [56]). Nevertheless, there are some points of critique concerning the estimation of the resulting distributions and probabilities (d. e.g. [48], [49] and [50]).
Le informazioni nella sezione "Riassunto" possono far riferimento a edizioni diverse di questo titolo.
1 The Model.- 1.1 Resource Categories.- 1.2 Problem Description.- 1.3 Critical Path Analysis.- 1.4 Mathematical Programming Formulation.- 2 Special Cases.- 2.1 Flow-Shop-Problem.- 2.2 Job-Shop-Problem.- 2.3 Open-Shop-Problem.- 2.4 Assembly Line Balancing.- 3 Variants and Extensions.- 3.1 Generalized Temporal Constraints.- 3.2 Resource Requirements Varying with Time.- 3.3 Further Regular Measures of Performance.- 4 Types of Schedules.- 4.1 Introduction.- 4.2 Definitions.- 4.3 Illustrations.- 5 A Branch and Bound Algorithm.- 5.1 The Precedence Tree.- 5.2 Minimizing the Projects Makespan.- 5.3 Optimizing any Regular Measure of Performance.- 5.4 Priority Rules and Heuristic Search Strategies.- 5.5 Acceleration Schemes.- 5.6 Limitations of the Branch and Bound Procedure.- 6 Generation of Instances by ProGen.- 6.1 Introduction.- 6.2 ProGen Specific Notation and Symbols.- 6.3 Project Generation.- 6.4 Resource Demand and Availability Generation.- 7 Computational Results.- 7.1 Exact Methods.- 7.2 Truncated Exact Methods.- 8 An Artificial Intelligence Approach.- 8.1 Model Reformulations.- 8.2 A PROLOG-Based Implementationll.- 8.3 Preliminary Computational Results.- 9 Applications.- 10 Conclusions.- List of Figures.- List of Tables.
Book by Sprecher Arno
Le informazioni nella sezione "Su questo libro" possono far riferimento a edizioni diverse di questo titolo.
Da: ralfs-buecherkiste, Herzfelde, MOL, Germania
Paperback/ broschiert. Condizione: Wie neu. 142 S. Mathematics Mathematik Wirtschaftsmathematik Economy Guter Zustand/ Good Ex-Library, vereinzelt Bleistiftanstreichungen ha1081829 Sprache: Englisch Gewicht in Gramm: 250. Codice articolo 397488
Quantità: 1 disponibili
Da: Ria Christie Collections, Uxbridge, Regno Unito
Condizione: New. In. Codice articolo ria9783540578345_new
Quantità: Più di 20 disponibili
Da: Chiron Media, Wallingford, Regno Unito
PF. Condizione: New. Codice articolo 6666-IUK-9783540578345
Quantità: 10 disponibili
Da: BuchWeltWeit Ludwig Meier e.K., Bergisch Gladbach, Germania
Taschenbuch. Condizione: Neu. This item is printed on demand - it takes 3-4 days longer - Neuware -Within a project human and non-human resources are pulled together in a tempo raray organization in order to achieve a predefined goal (d. [20], p. 187). That is, in contrast to manufacturing management, project management is directed to an end. One major function of project management is the scheduling of the project. Project scheduling is the time-based arrangement of the activities comprising the project subject to precedence-, time-and resource-constraints (d. [4], p. 170). In the 1950's the standard methods MPM (Metra Potential Method) and CPM (Cri tical Path Method) were developed. Given deterministic durations and precedence constraints the minimum project length, time windows for the start times and critical paths can be calculated. At the same time another group of researchers developed the Program Evaluation and Review Technique (PERT) (d. [19], [73] and [90]). In contrast to MPM and CPM, random variables describe the activity durations. Based on the optimistic, most likely and pessimistic estimations of the activity durations an assumed Beta distribution is derived in order to calculate the distribution of the project duration, the critical events, the distribution of earliest and latest occurence of an event, the distribution of the slack of the events and the probability of exceeding a date. By the time the estimates of the distributions have been improved (d. e.g. [52] and [56]). Nevertheless, there are some points of critique concerning the estimation of the resulting distributions and probabilities (d. e.g. [48], [49] and [50]). 164 pp. Englisch. Codice articolo 9783540578345
Quantità: 2 disponibili
Da: moluna, Greven, Germania
Condizione: New. Codice articolo 4894466
Quantità: Più di 20 disponibili
Da: Books Puddle, New York, NY, U.S.A.
Condizione: New. pp. 164. Codice articolo 2658585512
Quantità: 4 disponibili
Da: Majestic Books, Hounslow, Regno Unito
Condizione: New. Print on Demand pp. 164 49:B&W 6.14 x 9.21 in or 234 x 156 mm (Royal 8vo) Perfect Bound on White w/Gloss Lam. Codice articolo 51007095
Quantità: 4 disponibili
Da: Revaluation Books, Exeter, Regno Unito
Paperback. Condizione: Brand New. reprint edition. 154 pages. 9.20x6.10x0.37 inches. In Stock. Codice articolo x-354057834X
Quantità: 2 disponibili
Da: Biblios, Frankfurt am main, HESSE, Germania
Condizione: New. PRINT ON DEMAND pp. 164. Codice articolo 1858585506
Quantità: 4 disponibili
Da: preigu, Osnabrück, Germania
Taschenbuch. Condizione: Neu. Resource-Constrained Project Scheduling | Exact Methods for the Multi-Mode Case | Arno Sprecher | Taschenbuch | Lecture Notes in Economics and Mathematical Systems | xii | Englisch | 1994 | Springer | EAN 9783540578345 | Verantwortliche Person für die EU: Springer Verlag GmbH, Tiergartenstr. 17, 69121 Heidelberg, juergen[dot]hartmann[at]springer[dot]com | Anbieter: preigu. Codice articolo 102058116
Quantità: 5 disponibili