In some manufacturing systems significant setups are required to change production from one type of products to another. The setups render the manufacturing system inflexible as for reacting to changes in demand patterns, hence inventories must be maintained to guarantee an acceptable customer service. In this environment, production scheduling faces a number of problems, and this work deals with mathematical models to support the scheduling decisions. Some more background and motivation is given in the following sections, as well as in a case description in Section 1. 3. The synopsis in Section 1. 4 outlines the topics of the work. 1. 1 Motivation of the Planning Problem Consider the production of metal sheets in a rolling mill. If the width of the next type of sheets is greater than the width of the preceding type, then the roll needs a setup: during the rolling process the edges of a sheet cause grooves on the rolls' surface, thus, the surface must be polished if a greater width is run next. Sheets with a smaller width can be run directly, without a setup. Another example in which setups are sequence dependent is a line where cars are sprayed: if the color of the paint changes, the cleaning of the tools requires a setup depending on the sequence of the colors. Only a small setup may be needed for changing from a light to a dark color, but a thorough cleaning of the tools is 2 CHAPTER 1.
Le informazioni nella sezione "Riassunto" possono far riferimento a edizioni diverse di questo titolo.
1 Introduction.- 1.1 Motivation of the Planning Problem.- 1.2 Background and Related Work.- 1.3 Case Description.- 1.4 Chapter Synopsis.- 2 Description of the Problems.- 2.1 Batching Types and Literature Review.- 2.2 Notation, Basic Definitions and [?/?/?] Descriptor.- 2.3 Single-Machine Case.- 2.4 Multi-Level Product Structures and Parallel Machines.- 2.5 Complexity Analysis.- 2.6 Structural Properties.- 2.7 Instance Generator.- 3 Single-Machine Case.- 3.1 Basic Enumeration Scheme.- 3.2 Item Availability ― Preemptive Batching.- 3.2.1 Branch&Bound.- 3.2.2 Dynamic Programming.- 3.2.3 Construction and Improvement.- 3.2.4 Computational Results.- 3.3 Item Availability ― Nonpreemptive Batching.- 3.3.1 Branch&Bound.- 3.3.1.1 Minimum Cost Schedule of a Sequence.- 3.3.1.2 Dominance Rules.- 3.3.2 Genetic Algorithm for Sequence Independent Setups.- 3.3.3 Computational Results.- 3.4 Batch Availability.- 3.4.1 Branch&Bound.- 3.4.1.1 Late Schedule of a Sequence.- 3.4.1.2 Dominance Rule.- 3.4.2 Genetic Algorithm for Sequence Independent Setups.- 3.4.3 Computational Results.- 3.4.4 Genetic Algorithm for the Flow-Shop Case.- 4 Discrete Lotsizing and Scheduling.- 4.1 Discrete Lotsizing and Scheduling Problem.- 4.2 Equivalence of DLSP and BSP.- 4.3 Comparison with Variants of the DLSP.- 4.3.1 Sequence Independent Setup Times and Costs (SISTSC).- 4.3.2 Sequence Dependent Setup Costs (SDSC).- 4.3.3 Sequence Dependent Setup Times and Costs (SDSTSC).- 4.3.4 Single-Level Batch Availability (BA).- 4.3.5 Two-Level Batch Availability (BA2LV).- 4.4 Conclusions.- 5 Multi-Level and Parallel Machine Case.- 5.1 Multi-Level Case.- 5.1.1 Single-Machine.- 5.1.2 Multi-Machine.- 5.1.3 Preliminary Computational Results.- 5.2 Parallel Machines.- 6 Artificial Intelligence Approaches.- 6.1 Introduction.- 6.2 Model Formulations.- 6.3 Performance Comparison.- 6.4 Conclusions.- 7 Summary and Future Work.- Appendix A Setup Matrices for the Instance Generator.- List of Notation.- List of Abbreviations.- List of Figures.- List of Tables.
Le informazioni nella sezione "Su questo libro" possono far riferimento a edizioni diverse di questo titolo.
Da: NEPO UG, Rüsselsheim am Main, Germania
Taschenbuch. Condizione: Gut. 178 Seiten ex Library Book aus einer wissenschafltichen Bibliothek Altersfreigabe FSK ab 0 Jahre Sprache: Englisch Gewicht in Gramm: 282. Codice articolo 302141
Quantità: 1 disponibili
Da: NEPO UG, Rüsselsheim am Main, Germania
Taschenbuch. Condizione: Gut. 178 Seiten ex Library Book aus einer wissenschaftlichen Bibliothek Sprache: Englisch Gewicht in Gramm: 282. Codice articolo 303892
Quantità: 1 disponibili
Da: BuchWeltWeit Ludwig Meier e.K., Bergisch Gladbach, Germania
Taschenbuch. Condizione: Neu. This item is printed on demand - it takes 3-4 days longer - Neuware -In some manufacturing systems significant setups are required to change production from one type of products to another. The setups render the manufacturing system inflexible as for reacting to changes in demand patterns, hence inventories must be maintained to guarantee an acceptable customer service. In this environment, production scheduling faces a number of problems, and this work deals with mathematical models to support the scheduling decisions. Some more background and motivation is given in the following sections, as well as in a case description in Section 1. 3. The synopsis in Section 1. 4 outlines the topics of the work. 1. 1 Motivation of the Planning Problem Consider the production of metal sheets in a rolling mill. If the width of the next type of sheets is greater than the width of the preceding type, then the roll needs a setup: during the rolling process the edges of a sheet cause grooves on the rolls' surface, thus, the surface must be polished if a greater width is run next. Sheets with a smaller width can be run directly, without a setup. Another example in which setups are sequence dependent is a line where cars are sprayed: if the color of the paint changes, the cleaning of the tools requires a setup depending on the sequence of the colors. Only a small setup may be needed for changing from a light to a dark color, but a thorough cleaning of the tools is 2 CHAPTER 1. 196 pp. Englisch. Codice articolo 9783540611141
Quantità: 2 disponibili
Da: Books Puddle, New York, NY, U.S.A.
Condizione: New. pp. 196. Codice articolo 2648025722
Quantità: 4 disponibili
Da: Majestic Books, Hounslow, Regno Unito
Condizione: New. Print on Demand pp. 196 49:B&W 6.14 x 9.21 in or 234 x 156 mm (Royal 8vo) Perfect Bound on White w/Gloss Lam. Codice articolo 44789669
Quantità: 4 disponibili
Da: Revaluation Books, Exeter, Regno Unito
Paperback. Condizione: Brand New. 178 pages. 9.50x6.50x0.50 inches. In Stock. Codice articolo x-3540611142
Quantità: 2 disponibili
Da: Biblios, Frankfurt am main, HESSE, Germania
Condizione: New. PRINT ON DEMAND pp. 196. Codice articolo 1848025712
Quantità: 4 disponibili
Da: buchversandmimpf2000, Emtmannsberg, BAYE, Germania
Taschenbuch. Condizione: Neu. This item is printed on demand - Print on Demand Titel. Neuware -In some manufacturing systems significant setups are required to change production from one type of products to another. The setups render the manufacturing system inflexible as for reacting to changes in demand patterns, hence inventories must be maintained to guarantee an acceptable customer service. In this environment, production scheduling faces a number of problems, and this work deals with mathematical models to support the scheduling decisions. Some more background and motivation is given in the following sections, as well as in a case description in Section 1. 3. The synopsis in Section 1. 4 outlines the topics of the work. 1. 1 Motivation of the Planning Problem Consider the production of metal sheets in a rolling mill. If the width of the next type of sheets is greater than the width of the preceding type, then the roll needs a setup: during the rolling process the edges of a sheet cause grooves on the rolls' surface, thus, the surface must be polished if a greater width is run next. Sheets with a smaller width can be run directly, without a setup. Another example in which setups are sequence dependent is a line where cars are sprayed: if the color of the paint changes, the cleaning of the tools requires a setup depending on the sequence of the colors. Only a small setup may be needed for changing from a light to a dark color, but a thorough cleaning of the tools is 2 CHAPTER 1.Springer-Verlag KG, Sachsenplatz 4-6, 1201 Wien 196 pp. Englisch. Codice articolo 9783540611141
Quantità: 1 disponibili
Da: AHA-BUCH GmbH, Einbeck, Germania
Taschenbuch. Condizione: Neu. Druck auf Anfrage Neuware - Printed after ordering - In some manufacturing systems significant setups are required to change production from one type of products to another. The setups render the manufacturing system inflexible as for reacting to changes in demand patterns, hence inventories must be maintained to guarantee an acceptable customer service. In this environment, production scheduling faces a number of problems, and this work deals with mathematical models to support the scheduling decisions. Some more background and motivation is given in the following sections, as well as in a case description in Section 1. 3. The synopsis in Section 1. 4 outlines the topics of the work. 1. 1 Motivation of the Planning Problem Consider the production of metal sheets in a rolling mill. If the width of the next type of sheets is greater than the width of the preceding type, then the roll needs a setup: during the rolling process the edges of a sheet cause grooves on the rolls' surface, thus, the surface must be polished if a greater width is run next. Sheets with a smaller width can be run directly, without a setup. Another example in which setups are sequence dependent is a line where cars are sprayed: if the color of the paint changes, the cleaning of the tools requires a setup depending on the sequence of the colors. Only a small setup may be needed for changing from a light to a dark color, but a thorough cleaning of the tools is 2 CHAPTER 1. Codice articolo 9783540611141
Quantità: 1 disponibili
Da: preigu, Osnabrück, Germania
Taschenbuch. Condizione: Neu. Batching and Scheduling | Models and Methods for Several Problem Classes | Carsten Jordan | Taschenbuch | Lecture Notes in Economics and Mathematical Systems | ix | Englisch | 1996 | Springer | EAN 9783540611141 | Verantwortliche Person für die EU: Springer Verlag GmbH, Tiergartenstr. 17, 69121 Heidelberg, juergen[dot]hartmann[at]springer[dot]com | Anbieter: preigu. Codice articolo 101670310
Quantità: 5 disponibili