Isbn: 9783540611141 - batching and scheduling: models and methods for several problem classes: 437 (9 risultati)

- Brossura
Da: Books Puddle, Woodside, NY, U.S.A.Books Puddle
Contatta il venditoreVenditore con 4 stelleCondizione: Nuovo
EUR 79,69
EUR 3,50 spedizioneSpedito in U.S.A.Quantità: 4 disponibili
Condizione: New. pp. 196.

- Brossura
Da: Revaluation Books, Exeter, Regno UnitoRevaluation Books
Contatta il venditoreVenditore con 5 stelleCondizione: Nuovo
EUR 78,66
EUR 11,63 spedizioneSpedito da Regno Unito a U.S.A.Quantità: 2 disponibili
Paperback. Condizione: Brand New. 178 pages. 9.50x6.50x0.50 inches. In Stock.

- Brossura
Da: AHA-BUCH GmbH, Einbeck, GermaniaAHA-BUCH GmbH
Contatta il venditoreVenditore con 5 stelleCondizione: Nuovo
EUR 61,09
EUR 35,00 spedizioneSpedito da Germania a U.S.A.Quantità: 1 disponibili
Taschenbuch. Condizione: Neu. Druck auf Anfrage Neuware - Printed after ordering - In some manufacturing systems significant setups are required to change production from one type of products to another. The setups render the manufacturing system inflexible as for reacting to changes in demand patterns, hence inventories must be maintained to guarantee an acceptable customer service. In this environment, production scheduling faces a number of problems, and this work deals with mathematical models to support the scheduling decisions. Some more background and motivation is given in the following sections, as well as in a case description in Section 1. 3. The synopsis in Section 1. 4 outlines the topics of the work. 1. 1 Motivation of the Planning Problem Consider the production of metal sheets in a rolling mill. If the width of the next type of sheets is greater than the width of the preceding type, then the roll needs a setup: during the rolling process the edges of a sheet cause grooves on the rolls' surface, thus, the surface must be polished if a greater width is run next. Sheets with a smaller width can be run directly, without a setup. Another example in which setups are sequence dependent is a line where cars are sprayed: if the color of the paint changes, the cleaning of the tools requires a setup depending on the sequence of the colors. Only a small setup may be needed for changing from a light to a dark color, but a thorough cleaning of the tools is 2 CHAPTER 1.…

- Brossura
Da: Chiron Media, Wallingford, Regno UnitoChiron Media
Contatta il venditoreVenditore con 5 stelleCondizione: Nuovo
EUR 111,02
EUR 18,01 spedizioneSpedito da Regno Unito a U.S.A.Quantità: 10 disponibili
PF. Condizione: New.

- Brossura
Da: Ria Christie Collections, Uxbridge, Regno UnitoRia Christie Collections
Contatta il venditoreVenditore con 5 stelleCondizione: Nuovo
EUR 125,10
EUR 10,90 spedizioneSpedito da Regno Unito a U.S.A.Quantità: Più di 20 disponibili
Condizione: New. In English.

- Brossura
- Print on Demand
Da: BuchWeltWeit Ludwig Meier e.K., Bergisch Gladbach, GermaniaBuchWeltWeit Ludwig Meier e.K.
Contatta il venditoreVenditore con 5 stelleCondizione: Nuovo
EUR 53,49
EUR 23,00 spedizioneSpedito da Germania a U.S.A.Quantità: 2 disponibili
Taschenbuch. Condizione: Neu. This item is printed on demand - it takes 3-4 days longer - Neuware -In some manufacturing systems significant setups are required to change production from one type of products to another. The setups render the manufacturing system inflexible as for reacting to changes in demand patterns, hence inventories must be maintained to guarantee an acceptable customer service. In this environment, production scheduling faces a number of problems, and this work deals with mathematical models to support the scheduling decisions. Some more background and motivation is given in the following sections, as well as in a case description in Section 1. 3. The synopsis in Section 1. 4 outlines the topics of the work. 1. 1 Motivation of the Planning Problem Consider the production of metal sheets in a rolling mill. If the width of the next type of sheets is greater than the width of the preceding type, then the roll needs a setup: during the rolling process the edges of a sheet cause grooves on the rolls' surface, thus, the surface must be polished if a greater width is run next. Sheets with a smaller width can be run directly, without a setup. Another example in which setups are sequence dependent is a line where cars are sprayed: if the color of the paint changes, the cleaning of the tools requires a setup depending on the sequence of the colors. Only a small setup may be needed for changing from a light to a dark color, but a thorough cleaning of the tools is 2 CHAPTER 1. 196 pp. Englisch.…

- Brossura
- Print on Demand
Da: Majestic Books, Hounslow, Regno UnitoMajestic Books
Contatta il venditoreVenditore con 4 stelleCondizione: Nuovo
EUR 79,26
EUR 7,56 spedizioneSpedito da Regno Unito a U.S.A.Quantità: 4 disponibili
Condizione: New. Print on Demand pp. 196 49:B&W 6.14 x 9.21 in or 234 x 156 mm (Royal 8vo) Perfect Bound on White w/Gloss Lam.

- Brossura
- Print on Demand
Da: Biblios, frankfurt am main, HESSE, GermaniaBiblios
Contatta il venditoreVenditore con 4 stelleCondizione: Nuovo
EUR 79,90
EUR 9,95 spedizioneSpedito da Germania a U.S.A.Quantità: 4 disponibili
Condizione: New. PRINT ON DEMAND pp. 196.

- Brossura
- Print on Demand
Da: buchversandmimpf2000, Emtmannsberg, BAYE, Germaniabuchversandmimpf2000
Contatta il venditoreVenditore con 5 stelleCondizione: Nuovo
EUR 53,49
EUR 60,00 spedizioneSpedito da Germania a U.S.A.Quantità: 1 disponibili
Taschenbuch. Condizione: Neu. This item is printed on demand - Print on Demand Titel. Neuware -In some manufacturing systems significant setups are required to change production from one type of products to another. The setups render the manufacturing system inflexible as for reacting to changes in demand patterns, hence inventories must be maintained to guarantee an acceptable customer service. In this environment, production scheduling faces a number of problems, and this work deals with mathematical models to support the scheduling decisions. Some more background and motivation is given in the following sections, as well as in a case description in Section 1. 3. The synopsis in Section 1. 4 outlines the topics of the work. 1. 1 Motivation of the Planning Problem Consider the production of metal sheets in a rolling mill. If the width of the next type of sheets is greater than the width of the preceding type, then the roll needs a setup: during the rolling process the edges of a sheet cause grooves on the rolls' surface, thus, the surface must be polished if a greater width is run next. Sheets with a smaller width can be run directly, without a setup. Another example in which setups are sequence dependent is a line where cars are sprayed: if the color of the paint changes, the cleaning of the tools requires a setup depending on the sequence of the colors. Only a small setup may be needed for changing from a light to a dark color, but a thorough cleaning of the tools is 2 CHAPTER 1.Springer-Verlag KG, Sachsenplatz 4-6, 1201 Wien 196 pp. Englisch.…