The Making of the Channel Tunnel | 10 + (1 Duplicate) Original Colour Photographs of the Channel Tunnel Construction Comprising (i): 30-08-1987 Howden Engineering Glasgow View of T.B.M. and System Being Dismantled Prior to Transhipment to Dover Site (ii): 18-08-1987 Assembly of T.B.M. No. 1 Howden Engineering Glasgow (iii): 18-08-1987 Assembly of T.B.M. No. 1 Howden Engineering Glasgow (iv): 13-09-1987 Delivery of T.B.M. Drive Module Romules & Remus First of the Hunsiet Rack and Adhesion Locos on Site at Shakespeare Cliffs, Dover (v): 13-09-1987 Delivery of T.B.M. Drive Module Romules & Remus First of the Hunsiet Rack and Adhesion Locos on Site at Shakespeare Cliffs, Dover (vi): 18-08-1987 Assembly of T.B.M. No. 1 Howden Engineering Glasgow

Aero Industrial Photographic | Howden Engineering Glasgow | Transmanche Link Joint Venture |

Editore: Published by Aero Industrial Photographic ., 1987
Condizione: Usato

Venduto da Little Stour Books PBFA Member, Canterbury, Regno Unito

Membro dell'associazione:

Heritage Bookseller
Venditore AbeBooks dal 17 novembre 1999

Valutazione del venditore 5 su 5 stelle 5 stelle, Maggiori informazioni sulle valutazioni dei venditori

Visualizza gli articoli del venditore


Usato

Prezzo:
EUR 714,77
Spedizione EUR 34,70
Spedito da Regno Unito a U.S.A.

Quantità: 1 disponibili

Aggiungere al carrello