E g pullen h i j (2 risultati)

Supplement to Proceedings of the Aus. I.M.M. No. 182, Part II. 10 parts stamped A to J. . No. 3 Haulage and Servicing Shaft: Shaft-Sinking Equipment; No. 3 Ventilation Shaft: Shaft-sinking Equipment; Architectural Design and Treatment of Surface Area and Buildings; Electricity and Compressed Air Power Supply to Surface and Underground Workings; No. 3 Shaft Winders and Winder House; No. 3 Headframe; No. 3 Breaker Station and Mullock Bin; No. 3 Changehouse; No. 3 Shaft Sub-Brace Area; No. 3 Services and Surface Areas.
Palmer, J. H. (A, B); Anon. (C); Lowe, E. (D); Stevens, F.C. (E, F); Bennett, F.A. G. (G); E.G. Pullen (H, I, J)
Editore: Australian Institute of Mining & Metallurgy, Melbourne, 1957., 1957
Da: City Basement Books, Melbourne, VIC, AustraliaCity Basement Books
Contatta il venditoreVenditore con 5 stelleCondizione: Usato
EUR 22,84
EUR 21,09 spedizioneSpedito da Australia a U.S.A.Quantità: 1 disponibili
Aggiungi al carrello8vo (21.5x13.5cm), stapled at left edge, various fold-out plans in each part. Good condition. General light wear, creased, bumped, occasional sunned covers, age-toned. Pictures available on request.

- Rilegato
Da: Chiron Media, Wallingford, Regno UnitoChiron Media
Contatta il venditoreVenditore con 5 stelleCondizione: Nuovo
EUR 286,25
EUR 18,01 spedizioneSpedito da Regno Unito a U.S.A.Quantità: 5 disponibili
Hardcover. Condizione: New.