Da: Books Puddle, New York, NY, U.S.A.
EUR 61,93
Convertire valutaQuantità: 4 disponibili
Aggiungi al carrelloCondizione: New. pp. 76.
Da: Revaluation Books, Exeter, Regno Unito
EUR 79,01
Convertire valutaQuantità: 1 disponibili
Aggiungi al carrelloPaperback. Condizione: Brand New. 76 pages. 8.66x5.91x0.18 inches. In Stock.
Da: buchversandmimpf2000, Emtmannsberg, BAYE, Germania
EUR 45,90
Convertire valutaQuantità: 2 disponibili
Aggiungi al carrelloTaschenbuch. Condizione: Neu. Neuware -The construction industry is facing the significant problems of high cost of project delivery, bad financial performance and inability to deliver value to customers on time. A major factor contributing to this setback is rework. Rework is defined as the unnecessary effort of redoing an activity that was inaccurately done the first time. In this research work questionnaire survey having various reasons of rework was conducted, Survey was carried out in Surat City south Gujarat Region. From the various Literatures 48 Causes of rework were finalized under 7 Major Group which was checked for their impact in construction using IMPORTANCE INDEX (IMPI) method and top most crucial causes were used to develop FIELD REWORK INDEX (FRI). The FRI score between 14 to 30 was approaching stage, 30 to 45 was normal vigilance stage and 45 to 70 was rework alert stage. After FRI questionnaire was distributed in 11 building construction sites out of 3 sites (27.27%) sites are having success approach, 8 sites (72.73%) are having normal chances of rework and 0 sites are having high alert.VDM Verlag, Dudweiler Landstraße 99, 66123 Saarbrücken 76 pp. Englisch.
Da: Majestic Books, Hounslow, Regno Unito
EUR 62,75
Convertire valutaQuantità: 4 disponibili
Aggiungi al carrelloCondizione: New. Print on Demand pp. 76.
Da: BuchWeltWeit Ludwig Meier e.K., Bergisch Gladbach, Germania
EUR 45,90
Convertire valutaQuantità: 2 disponibili
Aggiungi al carrelloTaschenbuch. Condizione: Neu. This item is printed on demand - it takes 3-4 days longer - Neuware -The construction industry is facing the significant problems of high cost of project delivery, bad financial performance and inability to deliver value to customers on time. A major factor contributing to this setback is rework. Rework is defined as the unnecessary effort of redoing an activity that was inaccurately done the first time. In this research work questionnaire survey having various reasons of rework was conducted, Survey was carried out in Surat City south Gujarat Region. From the various Literatures 48 Causes of rework were finalized under 7 Major Group which was checked for their impact in construction using IMPORTANCE INDEX (IMPI) method and top most crucial causes were used to develop FIELD REWORK INDEX (FRI). The FRI score between 14 to 30 was approaching stage, 30 to 45 was normal vigilance stage and 45 to 70 was rework alert stage. After FRI questionnaire was distributed in 11 building construction sites out of 3 sites (27.27%) sites are having success approach, 8 sites (72.73%) are having normal chances of rework and 0 sites are having high alert. 76 pp. Englisch.
Da: Biblios, Frankfurt am main, HESSE, Germania
EUR 65,72
Convertire valutaQuantità: 4 disponibili
Aggiungi al carrelloCondizione: New. PRINT ON DEMAND pp. 76.
Da: moluna, Greven, Germania
EUR 38,74
Convertire valutaQuantità: Più di 20 disponibili
Aggiungi al carrelloCondizione: New. Dieser Artikel ist ein Print on Demand Artikel und wird nach Ihrer Bestellung fuer Sie gedruckt. Autor/Autorin: Chauhan KrupeshThe author is the Associate Professor at the Civil Engineering Department, Sardar Vallabhbhai National Institute of Technology, Surat, Gujarat, India, from 25 years & field work experience of 9 Years. The areas of his .
Da: AHA-BUCH GmbH, Einbeck, Germania
EUR 46,45
Convertire valutaQuantità: 1 disponibili
Aggiungi al carrelloTaschenbuch. Condizione: Neu. nach der Bestellung gedruckt Neuware - Printed after ordering - The construction industry is facing the significant problems of high cost of project delivery, bad financial performance and inability to deliver value to customers on time. A major factor contributing to this setback is rework. Rework is defined as the unnecessary effort of redoing an activity that was inaccurately done the first time. In this research work questionnaire survey having various reasons of rework was conducted, Survey was carried out in Surat City south Gujarat Region. From the various Literatures 48 Causes of rework were finalized under 7 Major Group which was checked for their impact in construction using IMPORTANCE INDEX (IMPI) method and top most crucial causes were used to develop FIELD REWORK INDEX (FRI). The FRI score between 14 to 30 was approaching stage, 30 to 45 was normal vigilance stage and 45 to 70 was rework alert stage. After FRI questionnaire was distributed in 11 building construction sites out of 3 sites (27.27%) sites are having success approach, 8 sites (72.73%) are having normal chances of rework and 0 sites are having high alert.